Unclear as to the relevance of this question to a housing development unless a bias is applied to whether buyers can speak welsh or not - which would itself be discriminatory
Dinas Powys road and sewerage network insufficient capacity to support 250 new homes. Cardiff/Barry Road is gridlocked during peak times already Frequent flooding during very heavy rain to low lying areas around Mill Brook and Cadoxton river. Strategic Flood Consequences Assessment misrepresented - the flooding assessment for the RLDP shows the Vale and their consultants JBA Consulting suppressing the December 2020 flooding in Penarth/Cosmeston and Sully and *lying* that the measures taken in Dinas Powys for *individual house protection* dealt with the Cadoxton flooding issue. It did not
Local Doctors already at capacity
Local schools already oversubscribed
Dinas Powys road and sewerage network insufficient capacity to support 250 new homes
Cardiff/Barry Road is gridlocked during peak times already
Frequent flooding during very heavy rain to low lying areas around Mill Brook and Cadoxton river. Strategic Flood Consequences Assessment misrepresented - the flooding assessment for the RLDP shows the Vale and their consultants JBA Consulting suppressing the December 2020 flooding in Penarth/Cosmeston and Sully and *lying* that the measures taken in Dinas Powys for *individual house protection* dealt with the Cadoxton flooding issue. It did not
Local Doctors already at capacity
Local schools already oversubscribed