Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4782

Derbyniwyd: 23/02/2026

Respondent ID: 1897

Ymatebydd: Mr John Lewis

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Road structure within Dinas Powys is at crisis point. Traffic constantly queueing along Cardiff Road to and from Llandough.The size of the proposed development No.444 is inappropriate. We strongly object to these plans.
Schools, Health Centre , Flooding are already at breaking point. Emergency services have great difficulty in travelling along Cardiff Road and any delays can result in life threatening situations.
Air polution is problematic travelling through Dinas Powys. When walking or cycling along Cardiff Road the smell of traffic fumes is unbearable. The proposed plans can only exasperate the problems causing such chaos within Dinas Powys.

Testun llawn:

Road structure within Dinas Powys is at crisis point. Traffic constantly queueing along Cardiff Road to and from Llandough.The size of the proposed development No.444 is inappropriate. We strongly object to these plans.
Schools, Health Centre , Flooding are already at breaking point. Emergency services have great difficulty in travelling along Cardiff Road and any delays can result in life threatening situations.
Air polution is problematic travelling through Dinas Powys. When walking or cycling along Cardiff Road the smell of traffic fumes is unbearable. The proposed plans can only exasperate the problems causing such chaos within Dinas Powys.