HG1 KS1 - TIR YNG NGOGLEDD-ORLLEWIN Y BARRI

ID sylw: 6698

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Crynodeb o'r Gynrychiolaeth:

We write specifically with regard to the Key Site at ‘North West Barry’ (Policy SP4: KS1). As the Authority are aware, a significant amount of supporting information has been prepared in relation to the Key Site over the course of the preparation of the Replacement LDP to date – this detailed evidence has clearly demonstrated that the inclusion of ‘North West Barry’ as a Key Site with the Replacement Plan fully accords with the Replacement LDP strategy. Furthermore, the detailed submissions have evidenced that the site is entirely deliverable and viable.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP1 – STRATEGAETH TWF CYNALIADWY

ID sylw: 6699

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Crynodeb o'r Gynrychiolaeth:

Sustainable Growth Strategy (Policy SP1)

The Deposit Plan’s overarching strategy in relation to sustainable growth is supported. The primary focus of concentrating housing growth within the ‘Strategic Growth Area’ (i.e. where the main centres of population are accommodated, and which are served by a range of facilities and services, and are accessible by a range of transport modes) as outlined by Policy SP1 is considered appropriate and will allow for the delivery of sustainable and resilient communities.

As per previous representations submitted by Asbri Planning on behalf of Persimmon Homes in relation to the RLDP Preferred Strategy, the prior identification of the strategic-scale (1,500 unit) Key Site at North East Barry was considered to represent an over-reliance on one site to meet the housing demand of the Authority’s Key Settlement (with associated constraints in relation to the delivery of units on a strategic-scale site within the early
mid part of the plan period).

It is considered that the inclusion of North West Barry as a Key Site, supplemented by a number of smaller housing allocations as identified in Policy HG1, will ensure that
the housing requirement for the Barry can be met in a robust and deliverable manner.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP6 - GOFYNIAD TAI

ID sylw: 6701

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Overall Growth Levels (Policy SP6)

It is acknowledged that the preferred growth option (dwelling-led 10 Year scenario), upon which the RLDP housing requirement figure is based, reflects what has been delivered in the Authority in recent years, and is considered by the Authority to be realistic and suitably ambitious given the Vale's position within the National Growth Area. However, as a general comment, it is considered that targeting a higher/more ambitious growth rate would be appropriate.

In reviewing the most recent LDP Annual Monitoring Report (Vale of Glamorgan LDP 2011-2026, 7th Annual Monitoring Report, 1st April 202431st March 2025) (published October 2025), it is clear that there is a shortfall in housing delivery in the Vale of Glamorgan. It is stated that: “Between 1st April 2011 and 1st April 2025, a total of 6,999 dwellings were completed within the Vale of Glamorgan of which 4,641 units were general market dwellings against the 2025 AMR target of 6,387 that should have been developed at this point in the plan period, in accordance with the target. The number of additional general market dwellings delivered is 27.3% below the monitoring target”. In light of the fact that there is a significant shortfall in housing delivery (i.e.
currently 27.3% lower than the LDP target), it is considered that a higher growth level for the Replacement Plan period would assist in rectifying under-delivery, allowing for housing completions to be better aligned with evidence of need (rather than repeating past shortfalls).


On February 12th 2026, the Welsh Government published updated estimates of additional housing need in Wales. The figures replace the 2019-based estimates and draw on the latest available data, including the 2022-based household projections published in late 2025. In summary, Welsh Government identify that there is a current estimated existing unmet need of 9,400 housing units. Estimates of existing unmet need have increased by 64% since the 2019-based estimates, due to a rise in homeless households in temporary accommodation.

In terms of future housing need, on average, between 7,800 and 9,300 additional housing units are estimated to be needed annually over the five-year period from July 2025 to June 2030, with a central estimate of 8,700 from newly arising need. The estimated newly arising need for July 2025 to June 2030 is higher than in the 2019-based estimates. This increase reflects higher projected household growth in the 2022-based household projections compared with the 2018-based projections used previously.

The Authority will need to give detailed consideration to the implications of the updated estimates of housing need. As the most up to date projections, the Replacement LDP must properly account for the new dataset to ensure soundness of the plan. In this regard, it is stated at Paragraph 5.34 of the Development Plans Manual that “In terms of considering the level of housing provision for a plan, the most up-to- date suite of Welsh Government population and Household Projections are a fundamental
part of the evidence base.” Accordingly, Paragraph 5.35 goes on to state that “All LPAs should use these projections and the resultant household numbers when considering the level of housing provision for a plan period”.

In light of the February 2026 publication of updated estimates of housing need in Wales (which indicate
a substantial increase in both existing unmet housing need and newly arising need), and in the context of the existing under-delivery of units evidenced within the most recent LDP AMR (i.e. which identifies a shortfall in housing delivery of 27.3% on the adopted LDP target), it is considered essential that the overall growth levels for the Replacement Plan are revisited (and increased accordingly).

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 KS1 - TIR YNG NGOGLEDD-ORLLEWIN Y BARRI

ID sylw: 6708

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Policy HG1 KS1 - Detailed Wording - Objections

As stated, although the representations provide overarching support for the Deposit Plan and the
inclusion of Land at North West Barry as an allocation, a number of detailed matters are objected to in
relation to specific elements of the proposed KS1 policy wording.

It is acknowledged that the Key Site will need to be delivered in accordance with placemaking principles
(as set out in Policy SP4 Placemaking and Policy PGD1 Creating Well Designed Places), and masterplanning work to date has demonstrated that the site is fully capable for compliance with both Policy SP4 and PGD1.

Comments are provided on the additional requirements which the site is anticipated to comply with as set out at Policy HG1 KS1.

The policy as currently worded is considered to be overly prescriptive with regards to the positioning of affordable units on the site. It is the case the Registered Social Landlord who is responsible for the delivery and ongoing operation/management of the affordable units is best-placed to advise upon the positioning of the affordable units within the site layout. As such, it is requested that the prescriptive nature of the above bullet point is amended to allow for the RSL to advise on best practice.

With regards to the first two bullet points set out under the ‘Sustainable Transport and Highways’ section of the Policy HG1 KS1, to confirm, as part of the development of the Key Site, it is proposed (as detailed within the submitted Transport Assessment) to construct a new junction from Port Road to the west of the Weycock Cross roundabout at the location of the existing field gated access in the form of a signal-controlled junction, which would allow for the safe and timely exit of traffic from
the development onto the local highway network. Such an access would also provide enhanced Active Travel infrastructure in conjunction with the proposed Active Travel route between the Weycock Cross junction and Cardiff Airport. Traffic signals at the proposed site access would provide for dedicated demand dependent green time for pedestrians and cyclists along this section of the A4226 Port Road.

Significant work has been undertaken to date in demonstrating that the above is deliverable. However,
it is requested that further clarification is included within the policy text to confirm that the Key Site is not responsible for the delivery of any further/additional sections of the Weycock Cross to Cardiff Airport Active Travel route, over and above the section of the route which adjoins the Key Site.

As set out within the Transport Assessment (May 2025) prepared in support of the Key Site, the traffic
movements associated with the North West Barry allocation could be accommodated on the highway
network with a marginal and inconsequential impact on the conditions already experienced on the local highway network. An appraisal of the impact of committed development (as agreed with the Highways Authority) has been undertaken as part of the Transport Assessment, which identifies that committed development within the vicinity of the Weycock Cross junction would have a greater impact upon the local highway network than the North West Barry Key Site. The North West Barry development is smaller in comparison to the other committed development assessed, and would have a marginal and inconsequential impact upon the operation of the Weycock Cross junction. It is therefore considered
that the policy wording should be amended to reflect the ‘proportionate’ nature of contributions required.

.It will be important to ensure that any off-site measures are directly related to the proposed development, and are necessary to ensure the acceptability of the proposed development. The requirement for a contribution towards off-site measures ‘in the area’ is not specific enough, and it is requested that the wording is amended as per the suggested text

It is considered that the inclusion of a specified figure for the area of open space to be provided within the southern section of the site is unnecessary within the policy text. The Indicative Plan for the Key Site included at Figure 13 of the Deposit Plan illustrates the indicative extent of ‘Significant Open Space’ to be provided adjoining Porthkerry Country Park, which will be subject to further detailed masterplanning work as the Planning Application is prepared in due course. A figure for the exact area
of open space to be provided within this section of the site cannot therefore be robustly specified until the further stages of masterplanning work are completed. As such, it is requested that the figure is removed from the policy text, with the identification of ‘Significant Open Space’ on Indicative Plan being considered satisfactory. Furthermore, it is not considered appropriate that the policy wording should refer specifically to the financial contribution towards the management of this land, in addition to its transfer, as such contributions will be subject to detailed viability appraisal work at the Planning
Application stage.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

CC1 - DATBLYGIADAU CARBON SERO NET PRESWYL GWEITHREDOL

ID sylw: 6712

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Asbri Planning

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Policy CC1 – Residential Operational Net Zero Carbon Development

Persimmon Homes has significant concerns regarding Policy CC1 and objects to it on the basis that it
replicates requirements already being progressed at a national level through Welsh Government’s Future Homes Standard (FHS). The FHS is intended to deliver “zero carbon ready” homes via a unified Building Regulations framework, making additional local policy unnecessary. At present, Building Regulations Part L1A sets out the standards for energy efficiency in new dwellings, and Persimmon already designs its homes to go beyond these minimum thresholds. This includes enhanced insulation
and improved building fabric performance, with reduced U values for elements such as walls, roofs, floors and windows to minimise heat loss. As a result, our homes typically achieve strong Energy Performance Certificate (EPC) ratings, generally in the A–B categories.

Introducing further operational net zero requirements at a local planning level risks adding cost, complexity and uncertainty, potentially affecting the viability and deliverability of housing sites. The Development Plans Manual for Wales is clear that local plans should not repeat national policy or seek to regulate matters already addressed through other statutory regimes. On that basis, Policy CC1 is not considered to be justified and is inconsistent with the second test of soundness.

The proposed shift in standards from April 2030 represents a substantial and abrupt escalation in
expectations. Although the policy refers to schemes such as Tai ar y Cyd and AECB CarbonLite, these examples largely relate to grant funded affordable housing projects. There is no robust evidence that equivalent standards can be met on mainstream housing sites without undermining overall viability. The Development Plans Manual requires policies to be based on strong evidence and to be realistically deliverable across the plan period. Without this, there is a risk that the proposed policy could impede
housing delivery and compromise the RLDP’s ability to meet identified needs.

Policy CC1 could also lead to inconsistent energy performance requirements across Local Planning
Authorities in Wales, contradicting the advantages of a unified regulatory system via Building Regulations. For volume housebuilders working across several authority areas, this would introduce unnecessary variation and complication. The DPM highlights the importance of policies that support
housing delivery and avoid avoidable burdens. By introducing bespoke modelling thresholds and
operational monitoring requirements, CC1 risks blurring the line between planning and Building Control,
raising questions about the policy’s justification and practical application.

It is Persimmon’s view that Policy CC1 is premature and that it is more appropriate for such matters to be addressed through building control rather than planning policy. In its current form, the policy risks impacting housing supply, affordable housing delivery and overall implementation across the plan period. For these reasons, we consider that Policy CC1 fails to satisfy the relevant tests of soundness and should be removed from the emerging RLDP.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP2 – HIERARCHAETH ANEDDIADAU

ID sylw: 6765

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

In principle, Persimmon supports the Settlement Pattern set out in Policy SP2, particularly the identification of Dinas Powys as a Primary Settlement.

Whilst the role of Primary Settlements is acknowledged, in that they contain several key services and facilities, vital to supporting sustainable communities including primary schools, small convenience shops, food and drink outlets and employment opportunities.

Persimmon considers that Dinas Powys is capable of fulfilling an enhanced role given its proximity to strategic transport infrastructure which provide regular services to key designations throughout the region and Cardiff city centre

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP6 - GOFYNIAD TAI

ID sylw: 6766

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

Persimmon supports the overall principle of a medium growth strategy. However, given the Vale’s position within the Cardiff Capital Region and its designation as a national growth area, we maintain that the proposed RLDP should be more ambitious when it comes to overall housing targets. Drawing on examples from Bridgend (14% flexibility), Swansea (20%), and Monmouthshire (15%), alongside evidence of historic under-delivery and recent Welsh Government household projections, there are sufficient grounds to warrant increasing the proposed flexibility allowance to a minimum of 15%, equating to a total requirement of 9,074 homes up to 2036.

The housing requirement is based on average completion rates over the first ten years of the adopted Local Development Plan. However, a higher rate of housing delivery is demonstrably achievable. Annual completion rates peaked at 917 dwellings, with six of the ten monitoring years exceeding the 526 per annum figure currently relied upon. This demonstrates that delivery capacity within the Vale has historically operated well above the proposed requirement and should therefore provide confidence that a higher housing target could realistically be achieved. A five-year average build rate of 780 units per annum was acheived between 2016 and 2021.

The ten-year average delivery rate fails to acknowledge that this period included the Covid-19 pandemic and at a time where construction costs experienced significant inflation.

The current adopted plan predates the publication of Future Wales: The National Plan 2040 and the Vale’s position within a national growth area. As such, pursuing an approach which seeks to maintain historic delivery rates is not considered to reflect this enhanced role and arguably lacks the level ambition set out at a national level. The proposed housing requirement should therefore be uplifted to positively respond to such matters in order to ensure conformity with Future Wales and regional aspirations.

Increasing the overall housing target would also act as a catalyst to enhance the delivery of affordable housing which is identified as a key objective for the RLDP.

The DPM is explicit in that the most up-to date suite of Welsh Government Population and Household Projections must form the foundation of any evidence base. The 2022-based Local authority household projections (Dated 20th November 2025) and 2025-based estimates of additional housing need (Dated 12th February 2026) have been published. The results show that whilst the overall number of households in Wales is projected to increase by around 98,500/ 7.2%and the Vale has the largest percentage increases (up 11.7%).

It remains unclear whether existing unmet need has been fully factored into the overall housing requirement. This is particularly important in the context of the Welsh Government’s 2025-based estimates which identify 9,400 units of unmet need at a national level and a requirement for 8,700 additional homes per annum over the next five years simply to address newly arising need. There is a compelling justification for a further uplift in housing numbers to ensure the Plan proactively addresses both existing and emerging need. Increasing the overall housing requirement would directly enhance the overall delivery rate for affordable homes which is crucial in a local authority area with the highest affordability ratio in Wales.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

THEMÂU ALLWEDDOL

ID sylw: 6767

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

Persimmon supports the themes of Homes for all, Placemaking and Promoting Active Travel and Sustainable Transport Choices.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

AMCANION STRATEGOL

ID sylw: 6768

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

Persimmon supports the principle of Objective 3 - Homes for All, in particular the provision of high quality housing which includes the right mix, tenure and type. Persimmon supports the notion of providing residential development in places which people want to live.

They also support Objective 4 - Placemaking and Objective 8 - Promoting Active and Sustainable Travel Choices.

Atodiadau:

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

Cydleoli tai, cyflogaeth,

ID sylw: 6769

Derbyniwyd: 11/03/2026

Respondent ID: 1068

Ymatebydd: Persimmon Homes (East Wales)

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

Persimmon supports the Vale’s objective to locate new major development in areas of the region best served by existing infrastructure and supporting services.

Atodiadau:

Am gyfarwyddiadau ar sut i ddefnyddio’r system ac i wneud sylwadau, gwelwch ein canllaw cymorth.