HG5 - SAFLEOEDD AG EITHRIADAU TAI FFORDDIADWY
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4399
Derbyniwyd: 28/01/2026
Respondent ID: 1624
Ymatebydd: Mr Iestyn Jones
Cadarn? Nac Ydi
None, this question is a red herring and developments have no bearing on culture or language.
100% affordable housing is government funded where site abnormal costs can be accommodated and fall outside of the normal development appraisal. As such, affordable housing schemes are more than private housing on more difficult and costly to develop brown field and contaminated sites / land. The authority's approach to allocation within private housing developments should also ensure the need is met and therefore negate the requirement to need to develop outside of settlement at all, thus preserving the natural environment and ecology.
As above, ensure affordable housing is delivered as part of the wider private and rented social housing allocations, preserve green open countryside, ecology and space between towns to prevent urban sprawl.
100% affordable housing is government funded where site abnormal costs can be accommodated and fall outside of the normal development appraisal. As such, affordable housing schemes are more than private housing on more difficult and costly to develop brown field and contaminated sites / land. The authority's approach to allocation within private housing developments should also ensure the need is met and therefore negate the requirement to need to develop outside of settlement at all, thus preserving the natural environment and ecology,
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 4800
Derbyniwyd: 16/02/2026
Respondent ID: 1874
Ymatebydd: Cwmpas
Asiant : Cwmpas
Paragraph 6.141 – positive comment and response within the context of Exceptions Policy HG5.
it is considered that the direct reference to community led affordable housing in the Deposit Plan document addresses and removes some of the potential barriers and challenges faced in the delivery of such forms of housing in terms of the availability of sites, enhancing evidence bases of housing need through genuine community level assessment and survey to supplement wider LHMAs and, standards within community led housing schemes around design, density, energy and sustainable transport most closely reflect placemaking principles. In addition, explicit reference to community led housing bridges the knowledge gap around models and management of such housing when compared to other more traditional forms of private and social housing development and thereby recognises the significant role and contribution community led affordable housing makes in addressing pressing and urgent housing needs.
A request would be made that as well as reference to community land trusts that wording is supplemented with suggested words of ‘and other forms and models of community led affordable housing.’
Cwmpas is positive in its response to the Deposit RLDP statements and welcomes the reference to community led housing as noted in:
Paragraph 6.121 – positive response though observation and request would be made to minor amendment to wording that after the words ‘co-operative housing’ the words ‘and other forms of community led affordable housing’ are inserted as this would accord with the context of PPW Edition 12 as noted.
Paragraph 6.141 – positive comment and response within the context of Exceptions Policy HG5. However, a request would be made that as well as reference to community land trusts that wording is supplemented with suggested words of ‘and other forms and models of community led affordable housing.’
Furthermore, it is considered that the direct reference to community led affordable housing in the Deposit Plan document addresses and removes some of the potential barriers and challenges faced in the delivery of such forms of housing.
It is now clearly the case that PPW supports community-led housing as a form of affordable housing and that, in the view of Cwmpas, this is material to the considerations of Local Development Plan preparation and from which the Vale of Glamorgan Deposit Plan would benefit.
Going forward, however, Cwmpas, would consider that detailed planning policy development within the Deposit RLDP could make an overt and explicit community led affordable housing development reference and with specific community led housing policies in addition to those subsumed within more generic and general housing policies.
Firstly, the addition of a specific reference to community led housing within Policies HG1, HG2, HG3 akin to that within HG5 would enable to the benefits and reach of community led housing to be expanded into mainstream housing policies and allocations and not only Exceptions Policy.
Secondly, it would be considered as beneficial that the Deposit RLDP policies on community led housing development could include a clear definition of this type of affordable housing.
In summary, it is considered that the direct reference to community led housing in the Deposit Plan document as noted in Paragraphs 6.121 and 6.141 represent very positive inclusion and that it addresses and removes some of the potential barriers and challenges faced in the delivery of such forms of housing by drafting specific community led housing policies at the RLDP Deposit Plan stage. However, as outlined, our comments and observations are such as to suggest that references could be further extended within the Housing policies and still be in accordance with the framework of PPW Edition 12, key to the evolution of these policies.
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 5126
Derbyniwyd: 04/03/2026
Respondent ID: 2386
Ymatebydd: Welsh Government (Planning Division)
Policy HG5, states 100% affordable housing exception sites can be located outside a settlement boundary where they comply with PPW/TAN2 and any threshold/policy requirements set in the Deposit Plan. The Welsh Government supports this approach.
Thank you for consulting the Welsh Government on the Vale of Glamorgan Council Replacement Local Development Plan (LDP) – Deposit Plan. It is essential the authority is covered by an up-to-date LDP to give certainty to local communities and businesses and provide a robust basis for decision making.
Without prejudice to the Minster’s powers, the Welsh Government is committed to assisting Local Planning Authorities (LPAs) minimise the risk of submitting unsound plans by making comments at the earliest stages of plan preparation. The Welsh Government looks for clear evidence that the plan is in general conformity with Future Wales: The National Development Framework, aligns with Planning Policy Wales (PPW) and the tests of soundness, as set out in the LDP Manual.
National planning policies are set out in Planning Policy Wales (PPW) Edition 12 and seek to deliver high quality, sustainable places through a place-making approach (the LDP should ensure it takes into account any further iterations of PPW prior to the examination). The implementation of the core policy areas in PPW, such as adopting a sustainable spatial strategy, appropriate housing and economic growth levels, infrastructure delivery and place-making, are articulated in more detail in the LDP Manual (Edition 3). We expect the core elements of the Manual, in particular Chapter 5 and the ‘De-risking Checklist(s)’ to be followed. Failure to comply with these key requirements may result in unnecessary delays later in the plan making process. The development planning system in Wales is evidence-led and demonstrating how a plan is shaped by the evidence is a key requirement of the LDP examination.
After considering the key issues and policies in Future Wales, the Welsh Government is of the opinion that the Replacement Deposit Plan is in general conformity with Future Wales: The National Development Framework. Specific comments are set out in the Statement of General Conformity (Annex 1 of this letter). Annex 2 highlights a range of issues that need to be addressed for the plan to align with PPW and the DPM. Collectively, our comments highlight a range of issues that need to be addressed for the plan to be considered ‘sound’ as follows:
Annex 1 – General Conformity with Future Wales
• No significant concerns
Annex 2 – Core matters that need to be/have been addressed (PPW and the DPM)
• Spatial Strategy and Primary Settlements
• Housing and Economic Growth Levels – Regional Collaboration
• Maximising Affordable Housing Provision
• Delivery & Implementation – General
• Gypsy and Travellers
• Renewable Energy
• Minerals
• Best and Most Versatile Agricultural Land (BMV)
• Welsh Language
I would urge you to seek your own legal advice to ensure you have met all the procedural requirements, including the Sustainability Appraisal (SA), Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA), as responsibility for these matters’ rests with your authority. A requirement to undertake a Health Impact Assessment (HIA) arising from the Public Health (Wales) Act 2017, if appropriate, should be carried out to assess the likely effect of the proposed development plan on health, mental well-being and inequality.
My colleagues and I look forward to meeting you and the team to discuss matters arising from this response.
Yours sincerely,
Neil Hemington
Chief Planner Welsh Government
Annex 1 - Statement of General Conformity
The Welsh Government is of the opinion that the Vale of Glamorgan Council Replacement Local Development Plan (2021-2036) Deposit Plan is in general conformity with the National Development Framework: Future Wales, as set out in paragraphs 2.16 – 2.18 of the Development Plans Manual (Edition 3).
There is a joint position statement on the relationship between Bridgend, Cardiff and the Vale of Glamorgan (BP20A), which considers population growth, migration patterns, housing completions, employment characteristics, demographics, commuting and transport links between the three adjoining authorities. The Welsh Government supports the principle of this work which demonstrates how change in the Vale of Glamorgan relates and complements growth in adjoining local authorities. This approach illustrates a good mechanism for other local authorities to follow.
Reasons
Future Wales places emphasis on the development of National Growth Areas in a sustainable manner. Growth areas must be sustainably planned, reduce the need to travel by car, encourage walking and cycling (active travel), maximise public transport usage and incorporate green infrastructure. Growth areas must embed these principles within a wider regional consensus, focussing on the opportunities they bring to promote social and economic benefits across a broader geographical area. The Welsh Government supports sustainable growth in National Growth Areas to respond to the climate change and biodiversity emergencies, making the best use of resources.
Policy 1 and Policy 33 of Future Wales states that Cardiff, Newport, and the Valleys will be the main focus for growth and investment in the region. The strategic diagram (p163) also identifies the Vale of Glamorgan within the National Growth Area. The Vale of Glamorgan RLDP, specifically BP20A, provides robust evidence on the interrelationship and key issues with adjoining authorities, including their interaction and how they have shaped and influenced the scale/location of growth in the RLDP. This is set out in the three Joint Position Statements (JPSs).
BP45 ‘Regional Assessment of Future Growth and Migration for the Cardiff Capital Region (CCR), May 2024, provides further evidence on how the scale of growth indicated for the region has shaped the scale of future economic growth within the Vale of Glamorgan. This results in a higher level of employment growth in the Vale of Glamorgan primarily to increase self-containment and reduce out-flows to adjoining urban areas. Two key areas for future economic growth are identified at Cardiff Airport/Bro Tathan Enterprise Zone and Aberthaw Power Station.
The result is a Sustainable Transport Orientated Growth spatial strategy focusing on the Cardiff – Bridgend railway line and A48 corridor, with the key settlement for growth at Barry, followed by service centres on public transport corridors. On balance, the Welsh Government considers the Deposit Plan is in general conformity with key policies in Future Wales namely (not exhaustive):
Policy 1: Where will Wales grow
Policy 2: Shaping Urban Growth and Regeneration – Strategic Placemaking
Policy 6: Town Centre First
Policy 10: International Connectivity – Cardiff Airport
Policy 12 Regional Connectivity
Policy 33: National Growth Area – Cardiff, Newport and the Valleys
Policy 36: South-East Metro
Future Wales brings a new perspective that all LDPs have to embrace on how each LDP sits within the region as a whole and the relationship to other LDPs, in essence, a strategic approach to cross boundary relationships. There is evidence to support that approach in advance of an SDP. 4
Annex 2 – Core matters that need to be addressed (PPW and the DPM)
Spatial Strategy - Location of Growth
The Council tested 4 spatial options:
Option 1 – Continuation of the adopted LDP growth strategy
Option 2 – Dispersed Growth
Option 3 – Focused Growth
Option 4 – Sustainable Transport Orientated Growth
The Council has chosen Option 4: Sustainable Transport Orientated Growth for its Deposit Plan. The strategy seeks to locate most of the new growth in those settlements well served by existing/proposed rail infrastructure along the Vale of Glamorgan/Penarth branch lines. This will encourage and maximise the use of sustainable transport modes in the plans designated Strategic Growth Area (SGA). The SGA encompasses most of the Council’s largest and more sustainable settlements and the Council considers that focussing development here will reduce the need to travel and will co-locate housing with employment opportunities, services, and community facilities.
With a significant proportion of the Council’s brownfield land already developed/committed, there are limited opportunities for brownfield development moving forward. The existing land bank is stated as 5,140 dwellings (land supply 3,837 + windfall assumptions 1,303), to meet a proposed housing requirement 7,890 (provision 8,660). The authority has allocated 3,520 dwellings on new sites (Policy SP6, Table 2). As a result, the plan has adopted a predominantly greenfield strategy allocating the majority of new development on five key sites (Policy HG1, Sites KS1-5 totalling 2,278 dwellings) well-connected edge of settlement sites, close to existing or proposed rail stations. We note the Council has used TfW data in the site assessment process to assess sites and their proximity to transport nodes. The remaining sites are mainly ‘rolled’ forward from the adopted LDP. The Welsh Government supports the spatial strategy, which accords with Planning Policy Wales (PPW) and is in general conformity with Future Wales.
Spatial Strategy - Primary Settlements
The Council’s settlement hierarchy allocates circa 92% of all housing development (committed and proposed) to settlements in the top three tiers of the hierarchy. The Welsh Government does not object to this approach. The recognition that Culverhouse Cross with few facilities on site and the presence of BMV Land, the expectation for limited growth (paragraph 6.14 & 6.15) is welcomed. Similarly, it is noted that Wick benefits from a primary school and has some scope for future growth, albeit in keeping with the scale and accessibility of the settlement. The Welsh Government is content that the scale of growth reflected in these two locations will reflect the availability of local facilities and services.
The Level of Growth - Homes and Jobs
The Deposit Plan (Policy SP1 & SP6) makes provision for 8,660 homes to deliver a housing requirement of 7,890 new homes (526 p/a) over the plan period 2021-2036, of which a minimum of 3,070 homes will be affordable. The flexibility allowance proposed by the Council is 9.8%. The delivery of new jobs is for 5,388 over the plan period (Policy SP14).
Homes: The 2018 WG Principal Projection results in a requirement of 431 units p/a, or 6,465 units over the plan period. The housing growth proposed in the plan (requirement) is around +1,425 units (22%) above the WG 2018 principal projection, the provision being +2,195 (34%) above. The Council consider the 10 year average housing completions to represent a more realistic level of growth to deliver the key issues the plan is seeking to address. The Council considers that a lower level of growth (2018 projection) is not appropriate because the projections do not take account of 5
any policy decisions and were prepared in advance of the Covid-19 pandemic with implications for migration patterns and fewer jobs proposed.
BP8A (November 2025) considers the latest 2022 Welsh Government population and housing projections, noting they are higher than the 2018 based projections. The projections for the Vale of Glamorgan show significant variation in internal migration in particular which the Council considers should be treated with caution. The projections are trend based and are affected by specific factors that may have occurred within the previous 5 years. The 5 years in question included a period of high housebuilding associated with a newly adopted LDP, as well as the Covid 19 pandemic, where many students returned to home from term-time addresses and re-registered with GPs in the Vale.
Given the fluctuation in recent migration figures, the Council consider longer-term trends are more appropriate, and it is noted that the population change identified in the 10-year migration variant is of a similar level to that proposed under the RLDP projection. In conclusion, for the reasons identified above, despite the updated projections, the Council considers the RLDP housing requirement continues to represent a robust basis to deliver a sustainable and deliverable level of growth over the plan period. The Welsh Government does not object to the scale of housing contained within the plan.
The demographic evidence (February 2023, Edge Analytics) tested 12 growth scenarios comprising: demographic-led, dwelling-led, and employment-led scenarios. The preferred housing requirement is based on a 10-year dwelling-led scenario (526 dpa) that would result in a population growth of 9.7% over the plan period with an annual net in-migration of 1,009 persons. The Council considers this level of housing growth is deliverable with a large proportion met through existing commitments (51%) and a jobs total (4,875 jobs) that broadly aligns with the level of new jobs forecast in the Employment Land Study (5,338 jobs). Moreover, the scale of growth is considered by the Council to be compatible with Future Wales and the role the authority plays within the wider southeast region. With inward migration to the Vale of Glamorgan from Cardiff expected to slow as Cardiff’s strategic sites deliver higher levels of housing and with employment opportunities in the Vale co-located with housing sites, there are further opportunities to reduce the high levels of out-commuting into Cardiff. Overall, this approach is proposed by the Council to deliver a level of growth that is balanced with the emerging Cardiff LDP and wider southeast region. The Welsh Government does not object to the level of growth proposed in the plan.
We note that historic completion rates in the Vale of Glamorgan have fluctuated considerably over recent years. The past 10-year (2011-2021) average completion rate is 526 dwellings p/a. This has been exceeded over the last 5-years (2016-2021) with 698 dwellings constructed p/a. Build rates in recent years are in part attributed to the delivery of the current adopted LDP strategy that has more of a ‘rural settlement' focus, with multiple sites across many settlements being built out. Replicating this approach going forward (10,470 dwellings) would not comply with FW/PPW in terms of sustainable development and transport, potentially adversely impacting on Cardiff’s growth strategy. On this basis, the Council considers that achieving 526 dwellings p/a in the preferred 10-year dwelling-led scenario is sustainable and deliverable and would provide a level of job growth (5,338 jobs) that is balanced with the housing requirement. The Welsh Government does not object to the level of housing proposed in the plan but demonstrating delivery of the key housing sites will be essential.
The Welsh Government notes that BP0A identifies small and large windfalls, based on historic trends of 53/yr and 80/yr respectively. Also, the large windfalls are not included in the first two years of the trajectory, as per the DPM. A non-delivery allowance of 5% is identified, which reflects local characteristics in the Vale of Glamorgan. A flexibility allowance of 9.8% has been factored into the provision. The Welsh Government supports this approach, although whilst Appendix 1 contains a housing trajectory, there is no table to mirror that of Table 21, DPM. This should be included in Appendix 1. 6
Jobs: The Council’s 10-year dwelling-led growth option results in a requirement for 4,875 new jobs (325 p/a) over the plan period. This broadly aligns with the projected growth for 5,338 (355 p/a) new jobs in the Employment Land Review (BP12) and as set out in Policy SP14.
The level of employment growth proposed (5,338 jobs) over the plan period is below the target in the currently adopted plan (7,610-10,610 jobs). The lower target is considered by the Council to more accurately reflect the cohort of working aged people in the Vale of Glamorgan and would support a continuation of long-term housing delivery trends that takes into account lower housing growth post-recession and a shorter period of historically high dwelling completions (2016-2021). The Welsh Government does not object to the level of job growth proposed in the plan.
In summary, (and subject to the above clarification), the Welsh Government has no significant concerns with the level of homes and jobs proposed in the plan, which is in general conformity with Future Wales.
Affordable Housing Provision
The Local Housing Market Assessment 2023 (LHMA) (BP10B) calculates affordable housing need over the replacement plan period using the ‘policy neutral’ Welsh Government 2018 Principal Projection and the preferred growth option. The LHMA provides the latest evidence on affordable housing need, identifying a net annual need for 1,075 affordable units per annum for the next five-years and a further 154 units per annum over the following 10 years (BP10B, Executive Summary), resulting in a requirement for 6,915 affordable homes over the plan period (461 p/a) with a tenure split of 65% social rent and 35% intermediate. The Welsh Government note that the RLDP housing requirement is higher than the 2018 projections. Accordingly, to take this into account the affordable housing need for the RLDP is 502/yr which equates to a need of 7,530 over the plan period (RLDP, paragraph 6.116, Table 4).
Policy SP7 identifies a target of delivering a minimum of 3,070 affordable homes, the housing need being across all 13 Housing Market Areas, albeit it is more acute in Barry, Penarth, and Llantwit Major for 1-bed properties. The Welsh Government notes that most of the new housing development (51%) is proposed in the Key Settlement of Barry and Service Centre Settlements, which include Penarth and Llantwit Major.
The Welsh Government has no significant concerns regarding the relationship between the LHMA and the Deposit Plan.
Affordable Housing Led Sites
To deliver additional affordable housing above that which market led housing can provide, the authority proposes (Policy SP3 & HG4) to permit small scale affordable housing-led developments that provide a minimum of 50% affordable housing on sites up to 25 dwellings in minor rural settlements and 50 dwellings in primary settlements. The principle of this approach is supported.
Paragraph 6.137 of the plan states:
“Policy HG4 makes provision for affordable housing-led sites in locations outside the Strategic Growth Area. These sites, which are allocated for a minimum of 50% affordable housing, are included within the settlement boundary.”
The reference to being within the settlement boundary is not referenced in policy HG4. It would be beneficial to either include such a reference or demonstrate that settlement boundaries do include those sites listed in policy HG4 for clarity.
These sites must be in addition to the market housing led requirement and identified in the LDP. This policy approach is justified by the high level of affordable housing need evidence by the LHMA and must be accompanied by additional control over the land by the local planning authority to 7
ensure effective delivery. Evidence should include ownership of the land, a binding legal agreement where the land is in private ownership or a resolution of the council to use compulsory purchase powers. RLDP, paragraph 6.133 references to such controls, however, should such controls be contained within the policy?
Affordable Housing Exceptions Sites
Policy HG5, states 100% affordable housing exception sites can be located outside a settlement boundary where they comply with PPW/TAN2 and any threshold/policy requirements set in the Deposit Plan. The Welsh Government supports this approach.
Employment Land
The Council’s Employment Land Study (BP12, March 2023) identifies a requirement for 67.80ha of employment land, which includes a 5-year buffer. The requirement is based on rolling forward past trends (over 25 years) and is of a sufficient scale to meet the 5,338 jobs forecast. However, Policy SP14 identifies employment land allocations totalling 182ha, which is an increase of around 114ha above the employment land requirement. The sites that make-up this supply are largely major employment allocations that attract significant regional inward investment at Cardiff Airport and Bro Tathan Enterprise Zone totalling 127.85ha (70%) of the total provision. The Welsh Government does not object to the over-provision of employment land in the plan. The Enterprise Zone designation must be identified and the allocations within it (SP14: 1-3).
Delivery and Implementation
PPW and the DPM (Chapter 5) contain guidance on the requirements in respect of the delivery and implementation of plans. The Deposit Plan should set out site-specific details for Key Sites that includes general phasing timescales, key infrastructure requirements, placemaking principles (including concept / schematic masterplan frameworks), constraints, and developer requirements, where appropriate. We note the Deposit Plan has included emerging master planning/infrastructure work on key sites.
The phasing, timing, funding, and delivery of Key Sites will be critical to ensure the plan delivers the scale of growth required over the plan period. This includes the relationship between the two Key Sites in St Athan (KS4 and KS5) totalling up to 1,150 units and the delivery of a new rail station in St Athan to meet the objectives of the strategy and encourage a modal shift to more sustainable forms of public transport.
The development sites may also impact on the trunk road network, in particular the M4 J34 and there will need to be a suitable level and form of traffic assessment to accompany the plan. (The transport case may consider the South East Wales Traffic Model as part of any masterplan impacts on the Strategic Road Network (SRN) (Wales Regional Transport Models | TfW)). The Council will also need to demonstrate that all housing components are deliverable through a housing trajectory prepared by the Council and Housing Stakeholder Group. Statements of Common Ground for key allocations, especially those that have ‘rolled over’ from the adopted plan, would be advantageous to demonstrate the sites are deliverable in the timescales set out.
The Deposit plan is supported by a high-level affordable housing study and site-specific viability appraisals for Key Sites. All viability work and must be prepared in conjunction with the Viability Steering Group and site-specific promoters.
It will be for the Council to justify deliverability supported by robust financial viability.
Gypsy and Travellers
The Gypsy and Traveller Accommodation Assessment GTAA (June 2022, approved June 2024) identifies a total need for 11 pitches over the plan period up to 2036, of which 9 pitches are ‘immediate’ by 2026. WG note that 4 pitches have since gained planning permission, reducing the remaining need over the plan period being 7 pitches. 8
Policy SP9 identifies a site at Llangan (0.76Ha) to accommodate the 7 pitches needed. It will be for the Council to demonstrate the appropriate site selection assessment process has been followed and that the site complies with requirements in PPW (4.2.35), Circular 005/2018 (paragraph 35) any relevant guidance and the DPM (5.80-5.85) to allocate a deliverable site in the plan period. The views of the relevant statutory bodies must also be agreed with no outstanding objections to the delivery of the site. The Welsh Government has no objection in terms of meeting the numerical need for gypsy traveller accommodation.
Renewable Energy
Future Wales: The National Plan 2040 identifies Barry as a District Heat Network (DHN) Priority Area. The Renewable Energy Assessment (BP15) explores the opportunity for a DHN using waste heat from Barry Biomass, but as there is some uncertainty on the future of the plant, the study concludes there is considerable risk to using the plant as a source waste heat. Could the Council provide an update on alternative options for a DHN in Barry?
It is welcome that the Renewable Energy Assessment (REA) has considered BMV policy, specifically for solar PV, and use of the Predictive ALC Map. The assessment has only considered non-BMV land (Subgrade 3b, Grade 4 and 5). The assessment would benefit from referencing the clarification provided in the DCPO letter of 1st March 2022 in respect of solar PV and BMV agricultural land for completeness.
The study identifies that in the Vale of Glamorgan solar development is more suitable than wind energy because of the flight path of aircraft in the south of the County Borough. However, there are some opportunities for wind sites, but these are likely to be small (<10MW) where aviation risks are lower and there is some grid access. Conversely, there are large expanses of land suitable for solar areas (>10MW) to the West of the County Borough, where there is little existing development. The study identifies 20 large-scale solar areas but recognises that grid constraints may impact the ability of sites to come forward.
Solar and wind search areas (where appropriate) below the 10MW Developments of National Significance (DNS) have been identified (Policy CC3). The plan also includes a criteria-based policy for all renewable energy proposals, particularly wind development, under 10MW (Policy CC4). Policy CC3 makes reference to adhering to the criteria in Policy CC4. However, would it not be the case that if search areas have been identified in Policy CC3 have they not already met the criteria? If they would not, should they be identified in the first place? Clarity would be beneficial. The Welsh Government supports the approach but seeks clarity on the point raised.
The Welsh Government notes the proposed search areas for wind energy near Morfa Ystrad Owen/Nant Rhydhalog, according to the Peatlands of Wales Evidence Score Map, the search area includes areas of peatland (Evidence Score 4). The site is also a SINC. This raises concerns as to how the inclusion of this search areas meets the policy test in PPW 6.4.15, 1a and 1b (Stepwise) regarding avoidance of irreplaceable peatland habitats and PPW 6.4.34.
Policy CC4 refers to Developments of National Significance (DNS) in 6.344 and 6.346. This should now refer to Strategic Infrastructure Projects (SIP) which replaced DNS.
Minerals
The Regional Technical Statement (RTS 2nd Review) identifies a nil apportionment for land-won sand and gravel provision in the Vale of Glamorgan. The Welsh Government policy clarification letter (dated 11 November 2021) identifies a surplus of 1.68mt of crushed rock. As there is a surplus of crushed rock reserves and a lack of sand and gravel production in the Vale, no specific allocations are required in the replacement plan. It is unclear whether a Statement of Sub-Regional Collaboration with adjoining authorities in the Cardiff City sub-region been agreed, or does the latest Position Statement (July 2022) explain how any shortfall will be met across 9
the region, particularly for crushed rock, of which the Vale has a surplus? Clarification would be beneficial.
BMV Agricultural Land
The Welsh Government has engaged with the Council for land quality advice, survey advice and ALC survey validation for candidate sites. The LPA has produced a specific topic paper on BMV policy application. BP23A. The Deposit RLDP allocates 188 hectares of housing land, 5.62 ha is identified as BMV land (under 3% of total housing allocations). The RLDP:
• Has sought to avoid BMV land wherever possible;
• Uses the Predictive ALC Map as a core evidence layer to inform: The spatial strategy;
• Settlement hierarchy decisions; and
• Candidate site assessments.
•
• Directs strategic growth to areas with least BMV land
• Removes or avoids allocations where BMV impacts were significant or unjustified.
• Quantifies total BMV loss and demonstrates it is minimal (5.62ha) and proportionate at plan level.
• Applies a sequential approach through: Preference for brownfield and non-BMV sites;
• Replacement of higher-BMV sites with lower-grade alternatives where possible.
•
• Requires site-specific ALC surveys to verify actual land quality before allocation.
• Demonstrates that allocated BMV land is: Often small, fragmented, or constrained;
• Sometimes previously disturbed or incapable of being farmed differently from surrounding lower-grade land; and
• Necessary to deliver the Plan’s housing strategy where reasonable alternatives are unavailable.
•
In conclusion, the Welsh Government consider the Authority has demonstrated a sensible and pragmatic approach to considering BMV loss in the context of national planning policy, and on that basis no objection is offered.
Green Infrastructure
Policy SP19 should explicitly reference the need for development to be accompanied by a Green Infrastructure Statement.
PPW12 requires decision makers to apply the step wise approach to GI, with enhancement secured at every stage where possible, there is no distinction made between the quality of the GI assets – the qualification in the policy statement that states proposals will incorporate measures that protect and enhance high quality multi-functional green infrastructure should be redrafted to remove the quality reference. The need to avoid an impact in the first instance should also be explicitly incorporated into the policy.
Criterion 1 (Policy SP20) should be redrafted – the stepwise approach in PPW 12 6.4.15 1a - does not distinguish between relative ecological value – the avoidance step applies to biodiversity in its widest sense (i.e. the variety of species and habitats and their abundance) and ecosystem functioning.
Welsh Language
There is limited reference to the Welsh language in the plan, either potential adverse impacts arising through development, or mechanisms via a policy framework to support and grow the use of the language. There are references to a number of Welsh-medium schools (3.26) and the increase in the number of people able to speak Welsh according to the 2011 census (3.52) but there is no mention of the authority's Welsh Language Strategy or promoting or cross-referencing to the aims of 10
Cymraeg 2050: A million Welsh-speakers. Paragraph 6.81 of the plan refers to development north west of Barry:
“Land at North West Barry is allocated for a residential development of up to 376 dwellings and public open space. The site is in a sustainable location on the edge of the Barry, a key settlement, in a location that is well served by services and facilities, including a major supermarket, GP surgery, community centre, three primary schools (English Medium, Welsh Medium and Church in Wales) and two high schools (English and Welsh Medium) all located in reasonable walking distance. There is an active travel route along Port Road West, bus stops in close proximity providing buses to Llantwit Major, Cardiff and the centre of Barry. Barry station is 1.3 miles from the site entrance.”
There is no mention that the Council want to undertake a Welsh Language Impact Assessment (WLIA) so there appears no attempt to measure the impact on the Welsh schools resulting from housing development? Could the Council clarify if such implications have already been covered in the WLIA for the plan, ISA, or are any specific policies necessary?
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6330
Derbyniwyd: 09/03/2026
Respondent ID: 243
Ymatebydd: Penllyn Community Council
Cadarn? Heb nodi
Provide additional or amended Planning policies [either free standing or within SP3 or HG5] to allow for single unit/micro development, by companies or individuals, of
appropriate, affordable housing units within all communities including ‘Hamlets and Smaller Rural Settlements’ [in the Countryside] where this is supported by the local community and meets the requirements of SSC1.
These new/amended policy statements [alongside the existing requirements of SSC1 and HG5] could then be applied across all existing settlements and communities currently classified as undefined ‘Hamlets and Smaller Rural Settlements’ and hence ‘Countryside’ to allow for controlled appropriate development of affordable homes to
meet the aspirations of Para 5.24. and the local Community.
Provide additional or amended Planning policies [either free standing or within SP3 or HG5] to allow for single unit/micro development, by companies or individuals, of
appropriate, affordable housing units within all communities including ‘Hamlets and Smaller Rural Settlements’ [in the Countryside] where this is supported by the local community and meets the requirements of SSC1. These new/amended policy statements [alongside the existing requirements of SSC1 and HG5] could then be applied across all existing settlements and communities currently classified as undefined ‘Hamlets and Smaller Rural Settlements’ and hence ‘Countryside’ to allow for controlled appropriate development of affordable homes to meet the aspirations of Para 5.24. and the local Community.
Gwrthwynebu
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6647
Derbyniwyd: 11/03/2026
Respondent ID: 692
Ymatebydd: Natural Resources Wales (NRW)
Cadarn? Heb nodi
We advise that, particularly given these sites are permissible outside of settlements and could be in countryside locations, criterion 6 should be amended to:
“There is no loss of land with significant recreational, amenity, agricultural, ecological or natural heritage value”.
Criterion 6 should be amended to:
“There is no loss of land with significant recreational, amenity, agricultural, ecological or natural heritage value”.
Thank you for consulting Natural Resources Wales (NRW) on the Vale of Glamorgan Replacement Local Development Plan (RLDP) Deposit Plan, which we received on 28 January 2026.
We have reviewed the deposit plan and published documents and have recommendations on matters relating to coherence and consistency. We advise these are addressed prior to submission of the RLDP.
1. Summary
We welcome that the Vale of Glamorgan Council has declared a ‘nature emergency’ and in 2021 committed to a target of no net loss of biodiversity in the Vale of Glamorgan. The deposit plan takes this a step further through its vision, objectives and policies in seeking
the achievement of net biodiversity benefit. We also welcome the recognition within the deposit plan and supporting documents that additional growth within the Vale has the potential to lead to negative effects on nationally and locally designated biodiversity. We
appreciate that the deposit plan’s policies seek to mitigate against these potential adverse effects with detailed wording and requirements.
However, we consider that the deposit plan would benefit from more specific mention of designated conservation sites especially where these are related to specific allocations and their associated policies. We note this issue was raised within the Integrated Sustainability Assessment (ISA) (see Section 2 below) however we do not see this recommendation properly reflected within the deposit plan itself. We consider this is a gap that should be addressed to ensure clarity within the policy requirements for any future planning applications.
General Approach to Designated Sites
In line with our role in development planning and our consultation remit, we advise that where new development may occur within or be likely to affect statutory designated sites including Special Areas of Conservation (SAC), Special Protection Areas (SPA), Sites of Special Scientific Interest (SSSI), National Nature Reserves (NNR) and Marine Conservation Zones (MCZ) this could be more clearly identified as a key consideration especially with respect to site allocations (housing and employment). We consider that the issue of avoiding or mitigating potential impacts and utilising opportunities for supporting and enhancing these sites (as noted by para 6.401 of the deposit plan) could have more substantial recognition across the deposit plan and its supporting documents. This would improve the clarity of approach.
We have furthermore noted that Policy SP20 (Biodiversity and Ecosystem Resilience) currently excludes specific mention of designated sites (although it does refer to protected species and habitats) and we suggest that this is addressed – our comments on SP20 are set out in Section 3 of this letter.
By across the plan, we mean there is scope to include mention of relevant statutorily designated sites within the constraints text for the sites listed in Appendix B of document BP44 Infrastructure Delivery Plan (perhaps summarising in line with the approach taken to the Historic Environment Record) and within document BP32A Green Infrastructure Assessment of Key Sites, evidence which can then be reflected as appropriate in Key Sites Policies (HG1 KS1 to KS5) to inform their master planning. The Preliminary Ecological Appraisals already undertaken for Key Sites (Key Site Supporting Information) would appear to hold relevant information in this respect.
We note that document BP32A has a useful general paragraph on biodiversity assets at paras 3.7-3.8 linked to the evidence collated in the Green Infrastructure Assessment (GIA). In short, where designated sites are identified in proximity to allocated sites it would be
helpful to make clear reference to them in a consistent manner. This would bring the deposit plan more fully into alignment with the ISA findings. For any employment sites
within proximity of designated sites, we consider that the employment background paper BP12A could potentially be updated to similar effect.
With reference to omissions on this matter, we refer you to our comments on sites set out in Section 4 of this letter, including sites KS1, HG1 (1), SP14 1. and SP14 4.
Overall, we consider that the recognition of designated sites appears somewhat inconsistent in the deposit plan, although we recognise that much of this is done by the
Green Infrastructure Strategy (GIS) which incorporates the GIA.
It may be that Policy SP20 (please see our suggested amendments in Section 3 of this letter) together with addressing the meaning of “areas of high ecological value” will also go some way towards resolving the points we raise.
Master Planning
We welcome the illustrative master plans included in the deposit plan but would caveat that at the detailed stages schemes must be able to adapt, where necessary, to site
specific environmental constraints (including protected sites, species and habitats), for example in response to updated ecological appraisals or detailed species surveys.
Designs need to be flexible enough to ensure compliance with the stepwise approach (avoid, minimise, mitigate) in achieving Net Biodiversity Benefit (NBB) and improving the resilience of ecosystems as required by Planning Policy Wales, edition 12 (PPW12) and Policy 9 of Future Wales, the National Plan. We note the plan has good reference to this within Policy SP20 and supporting paragraph 6.405, thus enabling thorough consideration
at the project/planning application level and in master planning.
Please see our detailed site-specific comments in Section 4 in order to consider where our comments may lead to adjustments in master plans. For example, the species protection issues we highlight with regard to KS3 at Readers Way, Rhoose.
Strategic Opportunity at Bro Tathan
In addition to the above points, we advise that the Bro Tathan area of the Vale includes a number of different allocations and is already known as an important ecological area for great crested newts (GCN) and dormice, in particular. Given the commitments already
made under previous planning applications at the site and the necessary requirement for future biodiversity provisions, we advise a more strategic overview of the area should be considered and either set out within the deposit plan or secured within an updated GIS.
This will ensure that development in the area:
• does not cause detriment to the maintenance of the favourable conservation status of protected species;
• results in green spaces and infrastructure that is meaningfully spatially connected and sufficient in size.
Overall, we consider piecemeal development of the St Athan area will not lead to effective conservation delivery and will make the planning process less efficient at project level.
Areas of High Ecological Value
As previously noted within our preferred strategy response (Ref: CAS-244275-Q4F4, dated: 14th February 2024), the deposit plan continues to make reference to avoiding
areas of ‘High Ecological Value’ (criterion 1 of SP20). We have not been able to establish where these areas are or how their ecological value is being determined. We consider this issue needs to be clarified and ideally a definition provided.
2. Integrated Sustainability Assessment (ISA)
With regards to Section 9.9 of the ISA, we agree that additional growth in the Vale has the potential to lead to negative effects on nationally and locally designated biodiversity. The ISA concludes that the housing-specific policies set out within the deposit plan work well to
mitigate the potential adverse effects, through design stipulations and policy inclusions.
The ISA then goes on to recommend that Key Site policies are updated, where appropriate, to reference specific designated sites which they are in proximity to, in
order to help establish appropriate protection and/or enhancement measures.
We agree with these recommendations and would go further in advising that all allocations and their associated policies should reference specific designated sites relevant to that site. For instance, we would advise Barry Woodlands SSSI and Walters Farm SSSI is identified in relation to Key Site 1 – Land at North West of Barry, and Barry Woodlands SSSI should also be identified for Housing Allocation HG1 (1) Land to the West of
Pencoedtre Lane. Please refer to our site-specific comments in Section 4 below.
3. Plan and Policy Wording
Strategic Policies
Strategic Policy SP19 – Green Infrastructure
We welcome that the GIS and GIA has informed the master planning of the Key Site allocations (6.395). To ensure this approach is carried forward for other development proposals, we consider there should be a stronger “policy hook” within Policy SP19 to link the content and evidence of the GI work to the policy and its influence on decision-making. Without this we consider there may be a risk of a policy gap/mismatch when determining planning applications.
This could be resolved by a new criterion such as:
“the provision of green infrastructure must have regard to any adopted or emerging guidance including the Green Infrastructure Strategy/Green Infrastructure Assessment
(and the Assets listed therein), and Green Infrastructure (Action) Plan for the Vale.”
To strengthen Policy SP19 we also recommend an addition to the wording of criterion 2 to read:
“Protect and enhance connectivity between existing green infrastructure assets and be planned wherever possible to positively support areas of high ecological value”.
We furthermore note that criterion 3 of SP19 refers to achieving net benefit for biodiversity whilst the policy overall seeks to provide, protect and enhance high quality multi-functional green infrastructure. We have previously commented that multi-functional green spaces may not always be compatible with biodiversity. It should be recognised that multifunctional uses of space can be to the detriment of the natural environment and so must be carefully considered. We recommend that paragraph 6.397 wording is updated to reflect this potential conflict so that NBB required by PPW (and as promoted by para 6.396 together with Policy SP20) is able to be prioritised and not compromised.
This point could also be raised under Policy SP4 Placemaking – at para 6.32. It should not be assumed that multifunctional spaces will also be delivering for nature in every situation and in some cases separate provision of spaces to meet biodiversity goals will be essential.
Paragraph 6.401 is welcomed regarding the opportunities that exist for the protection, maintenance and further enhancement of green infrastructure assets.
Strategic Policy 20 (SP20) – Biodiversity and Ecosystem Resilience
We welcome the inclusion of SP20 which recognises the importance of natural assets and aims to protect these. We have made comments regarding the term “high ecological value” in our Summary section at the start of this letter.
We also note that whilst reference is made to sites and areas of European, national and local importance (para. 6.402), this is not distinctly carried through within SP20 or within a specific detailed policy in the deposit plan. We advise that a more detailed policy for the Natural Environment (similar to DNP4 for the Historic Environment) could be included within the deposit plan and this should include reference to the protection of statutorily designated sites. Alternatively, SP20 itself could be updated to include reference to these in a similar manner to the approach taken to non-statutory designated sites provided by criterion 5 of SP20. We consider this would strengthen the deposit plan’s alignment to
section 6.4.3 of PPW12. This issue is also reflected in our feedback to the ISA as set out in Section 2.
By adding a detailed policy for the wider protection of the natural environment, there is scope to ensure a clearer message within the deposit plan regarding the need for natural resources (including land, air, water and soils) in the Vale to be protected for themselves and the essential ecosystem services they deliver. This is opposed to merely preventing pollution (deposit plan Policy DNP5). Taking such an approach would enable an
opportunity to add the consideration of Sustainable Management of Natural Resources (SMNR) into the plan policy framework rather than confining this to the deposit plan context (para 2.11) and the policy context of the GIS (page 53).
We note that Policy CC4: Renewable, Low and Zero Carbon Energy Generation is more distinct in seeking to safeguard a range of assets (including nature conservation interests and soil conservation interests) and we consider a similar policy approach may be useful
for all development proposals. We also suggest that the placemaking strategic policy (Policy SP4) could be altered in order to highlight the Natural Environment alongside its
current reference to the Historic Environment. We note that placemaking principles (Figure 11 - Identity) includes the need for development to respond to natural physical attributes of the site. This is an issue is linked to our site-specific comments (Section 4 below) where we cite, for example, the need to buffer woodlands, hedgerows and watercourses and preserve linear corridors.
Ensuring an SMNR approach will impact positively on the ground to safeguard and improve ecological networks and protect and enhance ecosystems, essential to meeting
the nature emergency. Topics we draw your attention to include river restoration where, in particular, the removal/remediation of physical modifications can make a significant impact upon water quality. The GIS provides scope to capture various projects and wider initiatives, including those based on catchment scale improvements and we welcome the opportunity to be continually involved in this work. We note and welcome the recognition of
nature-based solutions within Policies SP16, SP19 and SP20 and in detailed Policy CC6.
With regards to natural assets and water resources, we consider that specific reference to water quality is lacking within the strategic and/or detailed policies. Whilst we note that water quality is mentioned within criterion 9 of Policy SP16, we consider the deposit plan should include more direct reference to the Water Framework Directive. We consider there is an opportunity for SP20 to be updated to ensure developments protect water quality and quantity. Alternatively, as mentioned above, this could fit within a detailed policy for the protection of the natural environment.
As a minor point, please note that the South Central Area Statement is not hyphenated (para 2.10 and 2.11). Please note also that, referring to paragraph 6.404 and 6.405, the
requirements for developments to demonstrate NBB is based on PPW12, rather than The Environment (Wales) Act 2016.
Detailed Policies
Infrastructure
Whilst we note that the infrastructure requirements (such as sewerage capacity) have been investigated for certain key sites within the deposit plan, we consider there could be scope for a detailed policy to cover infrastructure requirements for all development.
Policy DNP7
We welcome Policy DNP7 of the deposit plan, which recognises the importance of preserving the natural darkness of the night sky and minimising light pollution, which we consider to be important in limiting adverse impacts upon local biodiversity and ecological
connectivity.
Policy DPN8
Please refer to comments made with regards to this policy under Section 6: Habitats Regulation Assessment (HRA).
Policy HG5 - Affordable Housing Exception Sites
We advise that, particularly given these sites are permissible outside of settlements and could be in countryside locations, criterion 6 should be amended to:
“There is no loss of land with significant recreational, amenity, agricultural, ecological or natural heritage value”.
EMP1 – Employment Regeneration Opportunity Areas
We note that the Former Aberthaw Power Station has been identified as an employment regeneration opportunity area. There are otter and water vole records on the site and we are aware of GCN records within the local area. We would advise against the inclusion of
the Aberthaw Nature Reserve within the allocation and advise that any application on the site would need to be supported by up-to-date ecological survey information and
appropriate conservation measures. Given the nature of the site, future applications will also need to be supported by appropriate land contamination investigations.
CC3 – Renewable Energy Local Search Areas
This policy identifies several sites where the potential for wind and solar development are the greatest (known as ‘search areas’). There are significant search areas located between Llantrithyd and St Hilary; no ecological information has been provided for these search areas, however given the records for GCN, water vole and otter local to these areas, it is likely that provision in the form of suitable habitats will need to be made for these species.
This could be substantial in scale, however without further ecological information we cannot advise further at this time. Notwithstanding, given the scale of the search area in this location and the likely ecological impacts, we advise that this area would benefit from spatial planning of biodiversity provision, at a greater than individual site scale.
Paragraph 2.81 – The Vale Nature Recovery Action Plan
We note reference to ‘6 broad habitat types’ including Woodland, Freshwater, Grassland, Coastal, Agriculture and Urban. We suggest this is amended to ‘6 broad ecosystems’ to reflect correct terminology and the State of Natural Resources Report 2025.
4. Strategic Sites
Overview
We previously provided detailed comments on the RLDP’s Strategic Sites, as set out in our response ref: CAS-234819-C1V3, dated 4th October 2023, which we refer you to. We welcome the additional information provided and note the inclusion of Green Infrastructure
Strategies for each of the Key Sites. However, we note that these do not include reference to protected species specifically and as a result we are unable to confirm that the provision for each site is appropriate. We observe that the road infrastructure for many of these sites severs woodlands and other substantial linear corridors. We advise that such sites are designed to minimise fragmentation in the landscape and advise that the road layouts and consequent severance is re-visited.
KS4 and KS5 are located within the vicinity of St Athan. This area is important for (and we are aware of) multiple records of GCN and dormice. Some of the area is already secured as compensation for impacts on these species associated with previous developments. We advise that the wider St Athan area is subject to spatial planning of biodiversity provision at a greater than individual site scale (as we have referenced in the Section 1 of this letter), in order to determine that:
• It does not cause detriment to the maintenance of the favourable conservation status of both GCN and dormice (strategic conservation plans should be established for both species);
• To ensure that green spaces and infrastructure are meaningfully spatially connected and sufficient in size;
We consider piecemeal development of these areas will not lead to effective conservation delivery and will cause the delivery of these sites to be less effective during the planning process.
Spatial Planning of Biodiversity
A masterplan or spatial biodiversity or GI plan should demonstrate the retention, provision and enhancement of essential areas for protected species. It should ensure that individual site-based habitat provisions are not designed in isolation but considered in association with nearby sites to demonstrate how habitat connectivity and resilience will be provided both across the site and to the wider landscape. Note that functional separation of public
open space and areas for biodiversity compensation may be required. Suitable buffers will need to be applied to any woodland and retained or created habitats on site. A sensitive lighting strategy will also likely be required for these sites. This point was raised previously during our review of the strategic candidate sites (ref: CAS-234819-C1V3, dated 4th October 2023).
Updated Surveys and Appropriate Buffer Zones
Further to the above comments, we welcome reference within the Infrastructure Delivery Plan for the requirement for updated ecological surveys and appropriate buffer zones to watercourses and retained habitat features for KS1 and KS2. Given the various ecological
constraints for each key site, we consider this advice should be included for each of the key sites.
Site Specific Comments
KS1 – Land at North West Barry
Protected Species – Dormice and bats are present on site. We advise that the masterplan is informed by surveys to ensure that biodiversity interests are maintained and enhanced. The site may require some areas to be retained an/or provision for habitats to support them. Dark areas and/or bespoke lighting scheme may also be required at project stage.
Protected Sites – The site is located in close proximity to Walters Farm and Barry Woodlands SSSI. As raised in our previous responses (CAS-234819-C1V3, dated: 4th
October 2023 and CAS-276923-N7H6, dated 17th April 2025), we have some concerns with the potential for increased and inappropriate use of the protected sites through recreational activities. We welcome that requirements have been detailed within HG1 KS1
under Green Infrastructure, Recreation Spaces and Biodiversity, which includes reference to emerging guidance for Suitable Alternate Natural Greenspace (SANG).
KS2 – North of Dinas Powys, off Cardiff Road
Protected Species – We note the supporting Preliminary Ecological Appraisal (PEA) (13th September 2022) which identifies potential for this site to support GCN, dormouse and bats. In the absence of species specific surveys, we are unable to advise whether the housing number aspirations for the site are realistic. We advise the scheme is designed to minimise severance of ecological corridors.
KS3 – Land at Readers Way
Protected Species – GCN are known to be present on this site (Readers Way Pond). The current masterplan indicates that the pond will be surrounded by built development and therefore built upon much of the terrestrial habitat which supports this pond. It is essential
that the masterplan provides a wide corridor from this pond to the wider countryside, other than via the closely managed grassland at Cardiff Airport. Any masterplan should make provision for this and any loss of habitat should be compensated for.
KS4 – Land at Church Farm
Protected Species - There are records of dormouse and GCN in the wider area. However, the supporting PEA indicates no direct impacts on the latter of the species. There appears to be extensive green space proposed in the illustrative masterplan, which we support.
KS5 – Land to the West of St Athan
Protected Species - The St Athan area is important area for GCN and dormouse. We would generally concur with the lower risk assessed for these species in association with this site. However, this is a substantial site and this and other sites in the St Athan area would benefit from spatial planning of biodiversity provision at a greater scale as reaffirmed elsewhere in this response.
5. Housing And Employment Allocations
Housing Allocations
HG1 (1) Land to the West of Pencoedtre Lane
Protected Sites: The site is within close proximity (200m) to Barry Woodlands Site of Special Scientific Interest (SSSI) and there is a risk from increased recreational use as a result of residential development, which could lead to impacts on the SSSI. Green space design must consider any emerging guidance for SANG to reduce recreational pressure on adjacent sites of biodiversity importance.
HG1 (2) Land at the Mole
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary European Marine Site (EMS). A HRA at project level will therefore be required.
HG1 (3) Land at Hayes Lane
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
HG1 (4) Land at Neptune Road
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.
HG1 (5) Land between the Northern Access Road and Eglwys Brewis Road (Site C - Central Parcel)
Flood Risk: The site is located partially within Flood Zone 2 and 3 for Rivers, with the southern area of the site located within Flood Zone 3. We refer you to Sections 10.20 and 10.21 of TAN 15, which state that highly vulnerable development in Zone 3 should be avoided. Notwithstanding, we acknowledge that at masterplanning stage, there is scope to locate residential development away from areas of flood risk. We also welcome that
Appendix B of your Infrastructure Delivery Plan notes the requirement for an FCA at project level for this site.
Watercourse: Boverton Brook (Main River) runs through the site and any development will need to ensure no adverse impacts to the watercourse with appropriate buffers and design considerations.
HG1 (6) Land adjoining St Athan Road
Land Contamination: The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Rural Affordable Housing Led Sites
HG4 (1) Land to the East of Colwinston
Land Contamination: The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Major Employment Allocations
SP14 (1) Land east of Cardiff Airport, Rhoose
Protected Species and Protected Sites: The site is within close proximity (360m) of Barry Woodlands SSSI and there also appears to be significant potential for the site to support dormouse, GCN, otter and water vole. There are large areas of semi-natural habitats associated with this site including woodland, mature hedgerow and watercourses. These should be retained and significantly buffered from development. Connectivity between the
site and the wider environment should also be maintained. It is therefore currently not possible to advise whether the full aspirations of the site could be fulfilled.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (2) Land south of Port Road (Model Farm), Rhoose
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (3) Bro Tathan Aerospace and Business Park
Protected Species: The site is located within an important area for GCN and dormice. As mentioned, this area would benefit from spatial planning of biodiversity provision at a
greater scale to better inform allocation.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (4) Land to the South of Junction 34 of the M4, Hensol
Protected Sites: The site is located directly adjacent to Ely Valley SSSI. Given the biodiversity interest at the site, previous applications at the site include planning
commitments to conserve and enhance grasslands habitats on the site. These commitments have not yet materialised and the requirement for these provisions should be noted within the LDP.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.
Local Employment Allocations
SP14 (5) Atlantic Trading Estate, Barry
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.
SP14 (6) Windmill Park, Hayes Road, Barry
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.
SP14 (7) Vale Business Park, Llandow
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (8) Land at Llandow Trading Estate
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
6. Habitats Regulations Assessment (HRA)
Marine and Coastal Physical Processes
Coastal Squeeze
We note that coastal squeeze has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is that it “is unlikely that the Vale of Glamorgan RLDP will allocate many developments on
greenfield sites adjoining the estuary”.
We also note that Policy CC6 specifically relates to Coastal Defences and Shoreline Management, with reference to the Shoreline Management Plans. We recommend the use of NRW’s Assessment of Coastal Squeeze at the project level for anyone proposing to
undertake works to coastal structures.
Loss of Functionally Linked Habitat
As part of the Preferred Strategy consultation, we advised that consideration was given to potential impacts on migratory fish features of the Severn Estuary EMS. In particular, we referenced the River Ely and its tributaries providing supporting habitat for essential life cycle processes of some or all the diadromous fish species.
Within the deposit plan HRA, it is noted that likely significant effects to the migratory fish features of the Severn Estuary EMS has been ruled out, as none of the sites allocated in the RLDP lie in close proximity to the River Ely and connected watercourses. We therefore
agree with this conclusion.
In relation to bird features, Table 8 of the Appropriate Assessment identifies many key sites and allocations with high to medium potential for functional linkage to the Severn Estuary EMS. We note that loss of functionally linked habitat has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational
Pressure’ within the deposit plan.
Policy DNP8
We advise that clarification is needed in relation to this policy, as while we welcome the supporting text regarding functionally linked land outlined in paragraph 6.76 of the HRA, the policy is mainly focused on recreational pressure and is titled as such. We also note a discrepancy between the policy wording in paragraph 6.76 and Policy DNP8 in the deposit plan itself.
Visual and Noise Disturbance (During Construction)
Within the deposit plan HRA, visual and noise disturbance has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is through the inclusion of recommendations outlined in 6.83 of the HRA to the supporting text of Policy SP20, which we welcome.
We also welcome the recommendation in relation to potential functionally linked land as outlined in paragraph 6.84 of the HRA.
Recreational Pressure
Within the deposit plan HRA, recreational pressure has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. Again, the justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational Pressure’ within the deposit plan, which as above, we advise needs
clarification.
We note that no visitor data has been collected from access points within the Vale of Glamorgan, but we welcome reference to the visitor surveys undertaken by
Monmouthshire and Torfaen, as well as the 2022 visitor survey commissioned by Stroud District Council.
We note that paragraph 6.25 of the HRA states that “three Key Sites and several other housing allocations lie within the 12.6km core recreational catchment that has been
deemed most appropriate for the Severn Estuary SAC/SPA/Ramsar”. However, we also note that Table 6 in the HRA only includes two Key Sites requiring mitigation, with KS3 being omitted. We advise that clarification is needed at the project level as to whether developments are situated within the 12.6km catchment area.
7. Strategic Flood Consequence Assessment (SFCA)
We have reviewed the submitted SFCA and agree with the scope of the assessment made.
We note there is currently an upper catchment Natural Flood Management (NFM) / Nature Based Solutions (NbS) project on the Cadoxton to reduce flood risk to Dinas Powys, Any updated SCFA should have regard to NFM schemes being progressed in their area and
proposals should be clearly outlined in the Development Plan (in accordance with TAN 15 2025).
8. Green Infrastructure Strategy (GIS)
We understand that the published GIS has not been updated to reflect the latest stage of the deposit plan and refers only to the preferred strategy stage (para 2.2.3). We previously provided advice on the Green Infrastructure Assessment (GIA) (re: CAS-252087-F0H1, dated 14th May 2024) which is included within the GIS. We refer you to these comments, noting that the GIS will be kept under continual review (para 1.2.5).
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 7049
Derbyniwyd: 10/03/2026
Respondent ID: 2413
Ymatebydd: Marion morgan
Asiant : Geraint John Planning Ltd
The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
ANNEX 1
Preface
This Annex sets out the detailed case in support of these representations, and by association the case for allocation of the site.
The representations are structured into the following sections:
1. Response to the Deposit Plan;
2. Comments on specific policies; and
3. A summary of the suitability of the site for development.
SECTION 1. Response to the Deposit Plan
Distribution of Growth
We object to the distribution of growth within the Deposit Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain the majority of housing growth in the Vale over the Plan period, or rather the over-reliance on this defined area, and the associated absence of growth in other parts of the Plan area.
As outlined in our previous representations, the allocation of housing and the location of strategic growth neglects the Rural Vale, and in our view, overprovides in the Strategic Growth Area. For example, with limited housing stock and average house sales at over £500,000 over the last 12 months, there is a clear and established need for new homes in the Ystradowen area, particularly at an affordable level. This is reinforced by the Local Housing Market Assessment that identified a need for over 1,114 new affordable homes per annum over the next five years throughout the county, and 196 units per annum thereafter (average of 502 units per annum over 15 years). Further to this, it is widely known that the rural Vale comprises the majority of the county’s ageing population, which, as a demographic, has and will continue to grow rapidly over the Plan period. This is evident in the ‘Population Change’ chart below – which is taken from the Deposit Plan:
VofG Deposit Plan: Figure 4 Population Change 2011 to 2021
It is clearly the case that younger populations are migrating to other Authorities, where access to housing is typically cheaper and more affordable, whilst more older populations are significantly migrating into the Authority. This trend will result in an extremely unbalanced demographic, given that the working-age population have sought housing elsewhere.
Without a suitable supply of affordable housing delivered over the Plan period, this trend will only worsen. Accordingly, it is not considered that the RLDP takes into account the lack of supply of affordable homes within the rural Vale, as well as increased housing to support the growing ageing population within these areas.
Para 3.19 of the Deposit Plan clearly outlines that affordable housing is required in the short term, in order to meet pressing needs. Specifically, it outlines the following: “There is significant pressure on temporary accommodation in the Vale, for a variety of reasons including increased homelessness presentations… The need for sufficient permanent affordable housing to assist in moving people out of temporary accommodation is critical and the planning system has a vital role in assisting in new affordable housing delivery.”
Accordingly, the distribution of growth within the Authority must be proportionate, to ensure that populations / areas are not left behind where they must seek access to housing elsewhere.
The RLDP Sustainable Growth Strategy sets out 6 objectives. Objective 4 states: “Allowing for small scale affordable housing led development in settlements outside the Strategic Growth Area at a scale proportionate to the size of settlement.” (Page 66)
Para 5.25 states “Therefore, a key part of the strategy is to allow for affordable housing led developments within sustainable primary and minor rural settlements outside of the Strategic Growth Area, at a scale that is appropriate to the size of the community it is serving. An ‘affordable housing led’ scheme is one where a minimum of 50% of the dwellings would need to be affordable, although this could increase to a maximum of 100% if the site is brought forward by a social landlord”.
In terms of the definition / explanation of what the affordable housing-led development sites are seeking to achieve, paragraph 6.132 of the Deposit Plan outlines the following:
“Accordingly, to ensure that new developments respond to the high demand for smaller properties, as identified in the LHMA, priority will be given to affordable homes that are small to medium-sized, typically comprising one to three bedrooms. Representations received from the local community through the RLDP process also highlighted a desire for new housing developments to offer opportunities for accessing smaller market homes. This is particularly relevant in the rural Vale, where housing choices are more limited. Providing smaller, more affordable market homes may assist first-time buyers and enable older residents to downsize to more manageable properties within their local area. Affordable housing-led sites will therefore need to demonstrate that an appropriate range of both affordable and market dwellings has been provided.”
Despite the acknowledgement within this strategic objective, we do not consider that the RLDP goes far enough to meet this objective, nor are its provisions and allocations adequate.
It is considered that this objective is undermined by the allocations set out by the RLDP (not least the absence of allocations in the rural Vale). Notwithstanding the Vision’s clear acknowledgement of the benefit of the growth of the rural Vale, these areas have not been supported through the plan due to the lack of growth which has been attributed to these areas in terms of further housing, employment and sustainable transport. All growth options have been selected on the basis of being in either a Key Settlement, Service Centre Settlement or Primary Settlement, all of which are already sustainable areas served by rail. As a result, it is not clear how this objective can be achieved, without the allocation of further sites within the Minor Rural Settlements, such as Ystradowen. The Vale is characteristically ‘rural’, and as such, there needs to be a stronger emphasis on supporting and delivering new development in order to bolster the rural economy. This includes enabling opportunities to provide employment and business premises within / near to rural settlements, as well as focusing housing growth in these areas to reduce travel time, and promote the use of sustainable transport.
It is considered that the current Strategy does not provide adequately for all residents across the Vale, only those within the Strategic Growth Area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan. This brings into question the “soundness” of the Plan.
The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north (as defined in the RCTCBC LDP). The Minor Rural Settlements to the west are more likely to be supported by job opportunities and employment in Bridgend than further east in Barry or Cardiff. Similarly, those in the north align with, and function in association with, the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north. These settlements are served by existing bus services that provide sustainable modes of travel to key employment locations in and around Bridgend. This is acknowledged in Paragraph 3.3 of the Strategy which states “The greatest number of residents who travel outside of the Vale for work purposes travel to Cardiff followed by Bridgend and Rhondda Cynon Taf, whilst a smaller proportion commute into the Vale from these neighbouring authorities”. The Demographic Evidence (Feb 2023) estimates the Vale as being a net importer of workers from RCT and Caerphilly (Para 3.6) - as shown in Figure 10 in the Preferred Strategy.
The current Strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas - given that Growth has been apportioned in only the Key Service Centre and Primary Settlements. It is considered that this will fail to support and facilitate the current (and any future) employment coming into the Vale, nor will it support any employment which is located outside of the Vale to the West and North. The Growth Option is too heavily reliant on access to railway stations as the key and sole sustainable transport method, whereas access to bus services should also be appropriately assessed and focused on in terms of promoting sustainable development. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural. The delivery and soundness of the Plan is therefore questioned and we continue to object to the spatial growth strategy as set out in the Deposit Plan.
Housing Supply
RLDP Allocations - Key Sites
As set out in representations made throughout the Plan preparation process, we consider that the Plan is too reliant on the delivery of ‘key sites’ to meet the housing need over the Plan period. Specifically, the Plan makes provision for 2,278 units in these Key Sites, which equates to circa 65% of RLDP allocations in the housing supply. The 5 key sites that are allocated in the Deposit Plan are as follows:
• Land at North West Barry – 376no. units;
• North of Dinas Powys – 250no. units;
• Land at Readers Way, Rhoose – 520no. units;
• Land at Church Farm, St Athan – 532no. units; and
• Land to the West of St Athan – 600no. units.
We object to the current housing supply to allocate 2,278no. (65%) of units across strategic sites, as this makes for a risky and unrobust strategy for delivering housing, and in turn, meeting the identified housing need over the Plan period.
As stated in previous representations, there is concern that the proposed timing and phasing of the proposed Key Sites is unrealistic and unrobust, and in turn, undermines the soundness of the Plan, given the heavy reliance on Key Sites delivering new homes across the Plan period. Whilst it is not disputed that the sites would have gone through rigorous assessment to inform their proposed allocation, the timescales for securing planning permission (with all associated conditions discharged) is considered to be unachievable. This is particularly the case for the following timescales that are set out in the Housing Trajectory that underpin the Plan:
• “Time period of pre-application discussions/PAC consultation” – 4 months
• “Time between submission of planning application and determination” – 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” – 4 months
It is considered that the above timescales are fundamentally unrobust, and result in a distorted position of housing sites over the RLDP Plan period. It is not considered that these reflect or are informed by the timescales that are currently being incurred for planning applications submitted for major housing sites across Wales. It is rather the case that such applications would typically be determined 1-2 years following submission, given that there are a wide range of stakeholders involved in the determination of major planning applications – which often adds to the delays associated with the determination of such applications.
It is equally the case that the assumptions in the trajectory are solely based on expected timescales for processing formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission.
It is assumed that these timescales have not considered that such major developments can be subject to the need to undertaking and submitting an Environmental Impact Assessment (EIA), which adds another layer to the determination of any planning application – given the additional considerations that form part of this process. As such, any site subject to EIA would very likely result in further delays extending beyond the timescales set out in the trajectory. Equally, as set out above, the preparation of an application subject to an EIA requires even more detail and assessment, which only further adds to the preparation stage (which has not been factored into as part of the trajectory). Accordingly, it is not considered that the trajectory contains any contingency if any site is required to undertake EIA as part of their application.
For the reasons stated above, it is unlikely that the sites will yield in full, particularly those sites which are expected to deliver housing right up to the final year of the Plan period (‘Land at Readers Way’ and ‘Land to the West of St Athan’). These sites do not allow for any ‘slippage’ should any delays arise through the development management process (which for the reasons set out above, will very likely be the case), and as such, a gap in housing delivery will be brought about as a result of these sites not yielding in full.
Given the proposed ambitious timescales set out for the delivery of the Key Sites, it is considered the housing trajectory is unrobust, and in turn, undermines the soundness of the Plan as a result. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to fully yield given that such sites are subject to less assessment and consideration compared to strategic sites. This would make for a more robust strategy, where a greater number of small to medium sites can deliver housing in the short and medium term of the Plan period, whereas the strategic sites represent a more longer-term strategy to deliver housing – which would then spill into the next Plan period.
Accordingly, we object to the Deposit Plan in its current form, where there is an overreliance on housing need to be met through the delivery of the Key Sites, which we consider to be unrobust, and undermine the integrity and soundness of the Plan. The current strategy of the Plan is at significant risk of not delivering the level of housing expected based on the sites allocated, as least as swifty as identified in the housing trajectory. Should no change be made to the Plan to address the above issues, then it is extremely likely that the Plan would ‘fail’ in meeting the identified housing need.
Windfall Sites
It is noted that the RLDP is made up of the following:
• Existing land supply (3,838 units)
• Windfall sites (1,303 units)
• Allocated sites (3,521 units)
Para 6.69 states that “Analysis of historical delivery of housing indicates that on average small windfall sites (sites of less than 10 dwellings) have provided some 53 dwelling completions per year, and large windfall sites (10 dwellings or greater) contributed on average 80 dwellings per year. Overall, it is projected that windfall sites could contribute a further 1,303 dwellings over the remainder of the plan”.
As set out in our previous representations to the Housing Trajectory, we would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan – which is discussed in greater detail later in this submission. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
St Athan Train Station
The RLDP Sustainable Growth Strategy comprises six key elements, of which the following is set out in respect to the allocation of new housing growth in the Authority:
“3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.”
The strategy outlines that a feasibility study for a station in St Athan had been undertaken in 2022, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ and 80no. units attributed to ‘Former Stadium Site, adjacent to Burley Place’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,263no. homes to be delivered in St Athan over the Plan period.
It is now the case, however, that the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales – as confirmed in the ‘Today, Tomorrow, Together: A vision for rail across Wales and Borders’ (February 2026) recently published by Transport For Wales. This paper acknowledges that a new railway station at St Athan would represent a longer term opportunity, and therefore, will not be delivered in the short term / within the Plan period of the emerging Plan. Equally the Council have not provided any evidence to contradict this, and therefore, it is very unlikely that any new train station will be delivered in St Athan over the Plan period. This brings about significant questions regarding the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,263no. homes (36% of the Plan’s new housing allocations) are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
In terms of the expected delivery of the Key Sites in St Athan, it is noted that the trajectory identifies that for the majority of the Plan period, both sites will be delivering 80no. dwellings per annum on each site (equating to 160no units in total). Whilst these are two separate sites, we seriously question the realistic prospects of the significant number of homes being built simultaneously on two sites in proximity to one another – given the considerable logistical issues that would be brought about.
Accordingly, it remains that there are serious questions regarding the suitability and acceptability of the proposed allocations at St Athan, which do not accord with the strategy adopted for the RLDP – to focus housing growth on settlements that are supported by railway stations. Moreover, the scale of development proposed at St Athan is also not considered to be proportionate, with a significant number of homes delivered in a location not served by a railway station.
Rolled forward LDP Sites
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
Table 6: Existing LDP allocations to be carried forward
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current Plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ’soundness’, and risks rendering the Plan unrobust.
Housing Delivery Rate Assumptions
As set out in our previous representations to the Housing Trajectory consultation, we have considerable concerns in relation to the proposed delivery of the sites identified in the trajectory – which we do not consider are robust or reasonable.
Appendix 1 of the Deposit Plan sets out the development trajectory bar chart – which illustrates the proposed delivery of housing, on a per annum basis, over the Plan period.
Extract of Housing Trajectory (annotated by GJP - red dotted line)
It is our view that the trajectory makes for an unrealistic and unrobust delivery rate of housing, which does not reflect the pattern of housing completions in the Vale of Glamorgan. We therefore have concerns regarding the soundness of the trajectory, not least that there remain significant uncertainties as to the delivery of the Key Sites (as discussed earlier in these representations).
Firstly, the graph / trajectory illustrates a large ‘spike’ in terms of housing delivery in the year 2027-28, which is considered to be a marked and pronounced step change in the rate of delivery. This envisages / relies on a significantly higher rate of delivery than previous years in the Vale of Glamorgan (2021 through 2021 – as depicted by the green columns). It is considered that this level of delivery is unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions from 2021 - 2025 has been approx. 400 - 500 units, however, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100% relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
It is also the case that the anticipated delivery of housing fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2025.
Accordingly, we consider that the housing trajectory, as proposed, is entirely manufactured and unreflective of the past completion rates, as well as the recent published completion rates provided by Welsh Government recently in August 2025. As set out in our previous representations, it has been evidenced that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1: ‘New House Building: April 2024 to March 2025’
As identified in the graph above, in 2024-25, 4,631 new dwellings were completed, which represents 3% fewer than the previous year. This figure represented the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed) The New Housing Pipeline Report Quarter 3, 2025 Report (December 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 7% during the third quarter of 2025, extending the decline seen during the first half of the year. At 45,075, the number of units approved was 34% down on the third quarter of 2024 and the lowest quarterly total since 2012 Q2. At 146,798, the overall number of units approved during the first nine months of 2025 was 25% lower than a year ago.
HBF Graph Illustrating Residential Approvals (2006-2025)
The above graph clearly shows a pronounced downward trend in the number of residential planning approvals over the period, particuarly with a sharp decrease seen since 2020. Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
More recently, the Welsh Government has released its new estimates of housing need (Estimates of Additional Hosing Need: 2025-based – February 2026). The estimates show how many new homes need to be built over the next twenty years to address existing unmet need as well as newly arising need. The figures set out that around 8,700no. new homes a year are needed over the next Senedd term up to 2030 to meet new housing need. Additionally, there is an unmet need for 9,400 affordable homes.
Overall, this represents more than double 2024/25 levels of supply, where just 4,638 new homes were built.
HBF: Estimates of Housing Need
HBF: Actual Delivery vs Estimates of Need
The above graphs unequivocally evidence that historical rates of delivery of housing in Wales has remained low, and moreover, significant numbers of housing need to be allocated in order to meet the estimate of need. It is not considered that the housing trajectory, in its current form, is robust to meet the housing need over the Plan period, given the uncertainties of the Key Sites, and the level of housing delivery that has been identified for the Plan.
Affordable Housing-Led Sites
HG4 - Rural Affordable Housing Led Sites
Policy HG4 of the Deposit Plan identifies four sites to be allocated as affordable housing-led sites, totalling approximately 122 dwellings within the plan period. Given the target levels of achieving 3,070 affordable dwellings over the course of the Plan period (up to 2036), it is not considered that this policy goes far enough to address the target and level of affordable housing need.
It is noted that the number of units identified for each site relate to the ‘total’ number of units delivered, as opposed to the affordable housing provision. Accordingly, it can be assumed that circa 50% of each allocation will comprise affordable units (given each site is affordable-led), which would equate to a total provision of circa 61no. units. The contribution from the affordable housing-led sites would only equate to 2% of the total need (3,070no. units). Even when coupled with the affordable housing provision from open market sites and 100% exception sites, the total delivery of affordable housing will still be nowhere near enough to meet the overall affordable housing need over the Plan period. Accordingly, it is considered that inadequate provision has been made for such sites.
Insofar as to the sites chosen and allocated are concerned, it is clear from reviewing the Stage 1 and Stage 2 Candidate Site Assessment that the allocated sites HG4(1) – (4) were not considered acceptable due to being outside the strategic growth areas, and were considered to be unacceptable intrusions into the open countryside. After being resubmitted as affordable housing-led sites, the sites were allocated, some with a smaller area in order to accommodate less dwellings in total.
The sustainable credentials of the sites allocated is not disputed, and it is acknowledged that these minor rural settlements have the ability to accommodate further growth, in the form of affordable-led housing allocations. However, it is considered that Land at Ystradowen (Site ID: 430 / 4060) should also form an allocation as part of this policy, given its high sustainability credentials and its appropriate location to accommodate a suitable level of development. Please refer to the previous representations made to the Housing Trajectory Consultation (dated 17th October) and Annex 2 for further, more detailed comments regarding the above sites.
The LHMA 2023 shows that there is a need for 230 affordable homes in the Cowbridge housing market area / ward - which Ystradowen is located within. As such, there is an identified need for affordable housing in this area, something which the site could address through an allocation – see Annex 2.
Securing further delivery of Affordable Units
As set out above, the affordable housing-led allocated sites only provide 122no. affordable dwellings, which comprise 4no. allocated sites that are expected to deliver approximately between 20 – 50 dwellings. However, the RLDP sets a target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4% of the target provision and will only make provision for 2% of the targeted number. We would therefore object to the sites included within Policy HG4 and would suggest that more sites should be allocated as part of the policy in order to secure delivery of a higher number of affordable housing units to mere the target.
Whilst it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, as set out above in these representations, there is serious concern regarding the deliverability of these sites, which would result in a significant gap of affordable housing delivered.
A greater number of affordable housing-led sites allocated would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in affordable housing need being unmet, with demand continuing to outstrip supply.
Previous representations to the Preferred Strategy (dated 14th February 2024) provided comment on the sustainability scoring of Ystradowen and the proposed site. As outlined within these representations, it is considered that the site (ID 430) represents a sustainable, deliverable and acceptable site. The site is located within 2.7 miles Cowbridge and
2.8 miles of Pontyclun. Due to the availability of frequent bus services, and active travel links, key services are readily available to access for any residents within Ystradowen without the need to travel by car. The site is within a maximum 9- and 14-minute bus journey (respectively) of the following key services:
• Cowbridge and ‘Y Pant’ Comprehensive Schools;
• Cowbridge Health Centre and Old School Surgery; and
• Cowbridge Town Centre, and Talbot Green / Pontyclun / Llantrisant (Strategic Growth Area), for various Retail Services.
Accordingly, the settlement of Ystradowen represents an acceptable location to allocate an affordable housing-led site, given the access to existing services and facilities that would serve future residents of the site.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of Ystradowen, support the surrounding settlements, and the Plan area as a whole. As such, the site should be considered further.
Comments on Specific Policies
HG5 - Affordable Housing Exception Sites
Given the unmet need and extant backlog of affordable housing, as identified within the LHMA (2023), it is noted that an Affordable Housing Exception Sites policy has been adopted in order to assist in the delivery of affordable housing. Policy HG5 sets out the specific criteria where proposals for 100% small scale affordable housing developments will be permitted outside settlement boundaries. The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
That said, it is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands. Therefore, the proposed amendments to Para 6.140 are outlined below in red:
6.140 “For the purposes of this policy, ‘small-scale’ will generally mean no more than around 10 dwellings on sites adjoining Minor Rural Settlements. In Primary Settlements outside the Strategic Growth Area, proposals for more than 10 dwellings may be acceptable where required to meet a specific need and where the number of dwellings is proportionate to the size of the settlement. In assessing the scale and extent of any proposed local needs housing, consideration should also be given to affordable housing already planned in the ward or nearby area, including sites with existing planning permissions and those allocated in the RLDP. The size and type of affordable housing proposed should reflect the identified local need in the area.”
The above suggested wording would achieve a more flexible policy, which would allow for a variety of scaled applications to secure planning permission for solely 100% affordable housing across the Authority area. This greater flexibility would enable the policy to make a significant contribution towards meeting the affordable housing need – which, as set out earlier is in considerable need.
SECTION 3. Suitability of the site for development
The site promoter objects to the overall assessment of the site, in that it is not considered suitable for further development in the Plan. The promoted site has undergone extensive scrutiny and appraisal at a high level to ascertain the qualities of the site, in light of all identified material considerations which relate to the proposals.
The delivery of the site will yield much needed housing (including Affordable housing) and contribute to the overall supply in the new Plan period, whilst making effective use of a suitably located site for residential development.
Moreover, as set out in ‘Annex 2’ of our representations, the site has overcome the ‘constraints’ set out in the Candidate Site Assessment undertaken for the site, which demonstrates that the proposal is both acceptable and deliverable.
Deliverability of the Site
In summary, the site seeks to deliver the following key elements:
• Provision of circa 67 new-build residential dwellings (including 50% affordable housing provision);
• A mix of house-types and tenures across the site to cater for a variety of needs;
• Creation of a new primary access into the site;
• Connection to pedestrian links within the wider area;
• Public open space; and
• Green Infrastructure; and
SUMMARY AND CONCLUSIONS
In summary, the site promoters:
• Object to the distribution of growth proposed for the Plan area, with a more balanced and equitable distribution of housing sites required in order to meet the identified housing need;
• Object to the level of growth identified for the Plan period;
• Object to the housing trajectory that underpins the delivery of housing within the Plan period – which is considered to be unrealistic and unrobust, leading to serious uncertainty regarding the “soundness” of the Plan;
• Object to the over-reliance on Key Sites and Rolled Forward Sites in making up the Plan’s housing land supply;
• Object to the scale and timing of delivery of sites in / around St Athan – all of which are predicated on railway station provision which will not be realised in the Plan period;
• Object to the under-provision of sites under Policy HG4 – Rural Affordable Housing-Led sites, not least given their extremely limited contribution to the targeted need for affordable housing;
• Object to the current wording of the HG5 Policy ‘Affordable Housing Exception Sites’ which requires greater flexibility to play an important role in delivery much-needed affordable homes across the Authority; and
• Object the Council’s assessment that the site is not considered suitable for development.
The site and proposals are consistent with the RLDP strategy, other Vale of Glamorgan strategies, and the requirements of Planning Policy Wales and Future Wales. It will make a significant contribution to the Vale’s identified housing requirement in the RLDP period and will provide for a wide range of uses that will support the wider community whilst embodying principles relating to placemaking and the well-being of future generations.
The site has no fundamental constraints and has the ability to deliver significant economic, social and environmental benefits for the benefit of future residents and the existing local community. The site is demonstrated to be viable, being able to deliver policy-compliant levels of affordable housing and given its location within a strong market area, will benefit from high delivery rates.
ANNEX 2
SECTION 4. A summary of the suitability of the site for development including a Response to the Candidate Site Assessment
Land at Ystradowen (Site ID: 4060)
This section of the overall representations to the Deposit Plan is to respond to, and address, the Council’s assessment of the site. The ‘Candidate Sites Assessment Deposit Plan Stage v2’ for ‘Land at Ystradowen (Site ID: 4060)’ sets out that the position of the site at the Deposit Stage is as follows:
“Amendment of proposed use from housing to affordable housing led. Previous site reference 430. The original assessment concluded that whilst the site was adjoining the existing LDP settlement boundary this is by virtue of an existing adopted plan LDP allocation this is currently under review. Notwithstanding this the site would represent unacceptable intrusion in to the open countryside.
The LDP site in question has subsequently been granted planning permission for housing. This site will serve the future needs of residents in the area and it is not considered that additional land should be allocated in this location.”
In terms of the first paragraph, the assessment/conclusion implies and suggests that ‘Land at Ystradowen’ (4060)’ does not adjoin the existing LDP settlement boundary as the allocated site (‘Land off Sandy Lane, Ystradowen’) has not been built out – “by virtue of an existing adopted plan LDP allocation this is currently under review”. Detailed representations have been made and submitted previously at the Housing Trajectory (see Appendix B& C) that outlines that this is fundamentally incorrect. This is not repeated in full here, with just the main points re-iterated.
First and foremost, ‘Land at Ystradowen (4060)’ directly adjoins the existing LDP settlement boundary. Secondly, there has been a significant change in the position and circumstances. The allocated site (‘Land off Sandy Lane, Ystradowen’) is currently being “built out”, with work commencing on site (see photographic evidence in Appendix C)
- post the implementation of the planning permission ref. 2023/00948/FUL (post approval on 9th December 2024). Accordingly, the site no longer adjoins “the existing LDP settlement boundary … by virtue of an existing adopted plan LDP allocation … currently under review”. Given this, the ‘Land at Ystradowen’ site boundary therefore directly adjoins/is adjoining the LDP settlement boundary and the site promoted herein.
With regards to the second paragraph, the assessment/conclusion outlines that “The LDP site … will serve the future needs of residents in the area and it is not considered that additional land should be allocated in this location”. The arguments and case presented in Appendix B & C. There is a clear overreliance on ‘rolled forward’ sites / existing allocated sites. A total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%). We believe that a greater level of growth is achievable and should be considered. Not least as there is an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings). As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy. Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. The provision of housing should be adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply. The “future needs of residents in the area” will therefore not be met/served by just this site, and it is considered that additional land should be allocated in this location.
Furthermore, to reinforce, illustrate, and evidence the point in specific reference to the site the subject to this representation (located in Ystradowen), reference is made to application ref. 2013/00856/OUT – ‘Land off Badgers Brook Rise, Ystradowen’. The Final Report of the application states that “Ystradowen is considered a sustainable settlement for further housing development” – i.e. “additional land should be allocated in this location”.
While the issues the Council have raised in their assessment of the site have been addressed and discussed within the representations made at the Preferred Strategy stage of the Plan (see Appendix B), a similar ‘scoring’ exercise has been undertaken as part evidence base for the Deposit Plan. As such, it is still pertinent to consider and respond to the Council’s assessment of the site as part of these representations. A comparison between the site assessments undertaken at both the Preferred Strategy stage and Deposit Plan stage can be seen below for reference:
BP18 Candidate Ste Assessment at Preferred Strategy Stage
As demonstrated above, there has been a positive change to the scoring attributed to the site (‘Land at Ystradowen’). The change is a positive change to the ‘Infrastructure Availability’ section changing from: ‘Grey’ (no score) to ‘Amber’. Infrastructure Availability is outlined as: “Existing or proposed services would be suitable subject to local improvements without impacting on development viability and/or delivery timescales” (see below):
The explanation for the scoring provided by the Vale sets out that “Sites will be assessed against the availability of water connections to the site, in addition to the method of foul sewage disposal from the site. Consultation shall be undertaken with DCWW to determine whether there is sufficient capacity to the wastewater treatments works, and how it links into DCWW’s Capital Investment Programme.
Where consultation indicates limited capacity, or the site is located away from a viable connection this may impact on the deliverability/viability of a site should this require significant connection costs or upgrades. Consequently, the Council shall require site proposers to undertake detailed site viability assessment to determine the impact that additional cost shall have on development cost and deliverability timescales.”
As set out above, this is a positive change. This is most likely derived from the allocated site (‘Land off Sandy Lane, Ystradowen’) currently being “built out”, with work commencing on site that would facilitate and improve the ‘Infrastructure Availability’. This re-iterates the point made previously re the incorrect assessment reached, and the ever changing position of this site – which will only improve given the neighbouring allocated site (‘Land off Sandy Lane, Ystradowen’) being “built out”.
Land West of Maendy Road, Aberthin (Site ID: 2299)
There are material similarities between ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ and the site the subject of these representations. It is therefore considered pertinent to assess and compare the suitability of ‘Land West of Maendy Road, Aberthin’. Not least as ‘Land at Ystradowen (Site ID: 4060)’ is for a “small-scale affordable housing led development in a minor rural settlement”, within “the ward of Cowbridge”.
The site ‘Land West of Maendy Road (Site ID: 2299)’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however from our review of the evidence base submitted as part of the Housing Trajectory consultation, there was no assessment and critique of this site at this stage. This raises questions regarding the “soundness” of this site, given it appears this sites acceptability and inclusion was pre-determined.
The site (‘Land West of Maendy Road’) has since had a detailed assessment and critique published, however concerns still remain regarding the “soundness” of the site which forms part of the intended housing land supply. The ‘Stage 2 Detailed Site Assessment’ summary undertaken for ‘Land West of Maendy Road’ has been extracted below:
“The site is proposed for a small-scale affordable housing led development in a minor rural settlement, which would accord in principle with the strategy. Aberthin itself has limited services and facilities, but is within reasonable walking distance of primary and secondary school provision with the wider range of services and facilities in Cowbridge just over 2000m away. The settlement is also served by public transport, although this is relatively infrequent.
The 2023 LHMA indicated that the ward of Cowbridge has a need for 230 additional affordable units over the next 15 years and this site could make an important contribution in meeting that.”
As mentioned previously, there are material similarities between ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ and ‘Land at Ystradowen (Site ID: 4060)’ (the subject of these representations). Firstly ‘Land at Ystradowen (Site ID: 4060)’ is also for a “small-scale affordable housing led development”, that is “in a minor rural settlement” (Ystradowen). Accordingly, it should follow that as ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ “would accord in principle with the strategy”, ‘Land at Ystradowen (Site ID: 4060)’ would also “accord in principle with the strategy”.
Furthermore, there is no material difference between the following assessment of Aberthin and Ystradowen:
“Aberthin itself has limited services and facilities, but is within reasonable walking distance of primary and secondary school provision with the wider range of services and facilities in Cowbridge just over 2000m away. The settlement is also served by public transport, although this is relatively infrequent.”
There is no material difference between ‘Land West of Maendy Road’ and ‘Land at Ystradowen’ in sustainability terms.
As set out in our representations to the Preferred Strategy, we reviewed the key services in proximity to the site. The following services were identified as part of that review:
• In terms of public transport, there are two bus stops located approximately 0.2 miles (4-minute walk) from the site (‘Land West of Maendy Road’), with the 321 providing services between Llantwit Major and Talbot Green;
• In terms of public transport, there are two bus stops located approximately 400m (7-minute walk) from the site (‘Ty Mawr Close’), with the ‘321 Nat Group Service’ providing services between Llantwit Major and Talbot Green. The 321 service is the same bus service that serves ‘Land West of Maendy Road’ / Aberthin;
• The site is also located 0.2 miles (4-minute walk) from The Farmers Arms Pub and 0.2 miles (4-minute walk) from The Hare and Hounds Inn; and
• The site is located 0.2 miles (5-minute walk) from Aberthin Village Hall.
Given the above, “The settlement (Ystradowen) is also served by public transport”.
Furthermore, Ystradowen is located only 2.7 miles from Cowbridge (9-minute bus journey). The “primary and secondary school provision with the wider range of services and facilities in Cowbridge” mentioned in relation to Aberthin are therefore also in close proximity to Ystradowen.
Given the above, any candidate site at ’Land at Ystradowen’ (the subject of these representations – Site ID: 430 / 4060) is no less sustainable than the site at Aberthin (Site ID: 2299).
Not least as the following additional key services are located within Ystradowen and therefore in close proximity to the promoted site:
• The site is also located 300m (3-minute walk) and 600m (10-minute walk) from Sports Pitches/Playing Fields such as ‘Ystradowen Children’s Park’, and the 3/4G Sports Pitch at ‘Ystradowen Petanque Club’; and
• Furthermore, the site is located 480m (7-minute walk) from the ‘Murco – Tudor Garage’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
Furthermore it is important to note that the above scoring criteria is very limiting, and does not take into account the important role and proximity of settlements in a wider context. For example, it does not take into account the important role and proximity of the Principal Settlement and Strategic Growth Area (as defined in the RCTCBC LDP) of Talbot Green / Pontyclun / Llantrisant which is 2.8 miles to the north (14-minute bus journey). Ystradowen would also naturally align, and function, in association with this Principal Settlement and Strategic Growth Area (of Talbot Green / Pontyclun / Llantrisant) – see Appendix B for full details.
In addition, as set out within the representations made in relation to the House Trajectory (Appendix C), the following extracts have been taken from the Officer’s Reports associated with the applications for the site that directly adjoins the western boundary of the promoted site 430 - ‘Land off Sandy Lane, Ystradowen’ (Housing Allocation 48). An aerial view extract is outlined below to give spatial context:
As set out above, it is important to note that the Final Report of application ref. 2013/00856/OUT states that “Ystradowen is considered a sustainable settlement for further housing development”, due to “the sustainable nature of the settlement”. Furthermore, the Final Report of app ref. 2023/00948/FUL states:
• “Notwithstanding this, the site is located in close proximity to local services and there is a bus stop located nearby. Whilst the comments relating to the reliance and frequency of the bus services have been considered, there still remains a bus service in the area”; and
• “Firstly, as aforementioned, many neighbouring comments refer to the site as unsustainable and have commented on the suitability of public transport and cycle routes etc. This has been addressed above.”
The above clearly evidences that the location has previously been endorsed as, and is currently still found to be, sustainable.
Accordingly, it can be considered therefore that if the proposed allocated site ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ is considered sustainable and by association suitable to be an Affordable Housing Led Allocation, ‘Land at Ystradowen (Site ID: 430 / 4060)’ is equally suitable to be an Affordable Housing Led Allocation.
The second section/paragraph of the assessment states:
“The 2023 LHMA indicated that the ward of Cowbridge has a need for 230 additional affordable units over the next 15 years and this site could make an important contribution in meeting that.”
‘Land at Ystradowen (Site ID: 4060)’ is also located within “the ward of Cowbridge”. As per the above and outlined by the Authority, there is “a need for 230 additional affordable units over the next 15 years”. It is clear therefore that there is a need for additional affordable units in this ward, and this site would therefore also help to alleviate this need.
This position is a direct contradiction of course of the assessment/conclusion for ‘Land at Ystradowen (Site ID: 4060)’ which stated “it is not considered that additional land should be allocated in this location”. It is clear from the above however that “additional land should be allocated in this location” to satisfy this “need for 230 additional affordable units over the next 15 years” – which ‘Land at Ystradowen (Site ID: 4060)’ can do. This is not least the case given the detailed arguments, case and representations presented and evidenced previously above and in Appendix B & C.
To briefly reiterate there is a clear overreliance on ‘rolled forward’ sites / existing allocated sites which has resulted in the unmet need deriving from the existing LDP being still present. A greater level of provision for new allocations should therefore be applied in order to meet the housing requirement. The provision of housing should be adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply, so these can “make an important contribution in meeting” the “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge” – which ‘Land at Ystradowen (Site ID: 4060)’ can do.
As set out within the representations made in relation to the housing trajectory (see Appendix C), a further key consideration to note and one which does differentiate between the relative merits of the ‘Land at Maendy Road, Aberthin’ and ‘Land at Ystradowen’ is that the LDP Proposals Map demonstrates that ‘Land West of Maendy Road’ is within a Special Landscape Area - see below:
Vale of Glamorgan Proposals Map (Land West of Maendy Road outlined in red
Under Policy MG17 ‘Special Landscape Areas’ it is considered that development in SLA could pose an “unacceptable harm to the important landscape of the area”. Accordingly, this development and proposed allocation could therefore cause “unacceptable harm to the important landscape of the area”.
‘Land at Ystradowen’ by contrast does not sit within a SLA (see below). This site would therefore not pose any potential concern in this respect as it would ultimately not cause any “unacceptable harm to the important landscape of the area”.
Vale of Glamorgan Proposals Map (Land at Ystradowen in red)
It is noted that the detailed assessment scores the site ‘amber’ in respect to Special Landscape Area (refer to / see later section for full details), with the assessment methodology setting out that “the site is located within a Special Landscape Area/The Glamorgan Heritage Coast and the development may result in little or no change in character and little or no significant effect on landscape character and visual amenity.”
A detailed assessment of the impact upon the SLA in respect to the development of ‘Land West of Maendy Road, Aberthin’ should therefore be, and will need to be, undertaken as part of any planning application. If it is found that the site causes “unacceptable harm to the important landscape of the area”, this will lead to this proposed allocation being at risk of not being delivered. This will be as a result of its impacts and acceptability at the planning application stage that the landscape and visual impact of development of the site is unacceptable. As such, these proposed affordable units are at a potential considerable risk of being lost and not satisfying the “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge” – which ‘Land at Ystradowen (Site ID: 4060)’ can do as it is not located in an SLA.
In addition the draft housing trajectory set out that “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is not delivered (as it is located in a SLA), and so a “small scale affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” is not provided for. This is clearly an issue. Given however ‘Land at Ystradowen’ does not sit within a SLA – and so not pose any potential concern or cause any “unacceptable harm to the important landscape of the area” – the allocation of this site would be more suitable and “safer” - as there would be no concerns over this proposed allocation being removed and/or not being delivered in this respect (as it is not located in a SLA). This would ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”, are provided for, and the need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge” would be satisfied.
As mentioned previously, a detailed assessment and critique has now been undertaken of ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ as part evidence base for the Deposit Plan using the similar ‘scoring’ exercise. As such, it is again pertinent to consider and respond to the Council’s ‘scoring’ exercise assessment of the site ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ as part of these representations.
The ‘Summary of Assessment of New Candidate Sites’ table can be seen overleaf for reference:
BP18A Candidate Site Assessment at Deposit Plan Stage
A comparison between the site assessments undertaken for both ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ (on the left), and ‘Land at Ystradowen (Site ID: 4060)’ (on the right) has been undertaken, and can be seen below for reference:
Having undertaken a review of the scoring for both ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ and ‘Land at Ystradowen (Site ID: 4060)’, it is clear that ‘Land at Ystradowen (Site ID: 4060)’ scores higher/more positively (i.e. green) than ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’:
• ‘Land at Ystradowen (Site ID: 4060)’: 17/33 criteria are scored green = 52%
• ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’: 12/34 criteria are scored green = 36%
It is clear therefore given the above that ‘Land at Ystradowen (Site ID: 4060)’ is a better site, and should be allocated accordingly.
One key example to note is how the criterion ‘Access to Services and Facilities’ has been scored. For ‘Land at Ystradowen (Site ID: 4060)’ this has been scored green, yet for ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, this has been scored red. Given this, this corroborates the position outlined previously above that, if the proposed allocated site ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ is considered sustainable and by association suitable to be an Affordable Housing Led Allocation, ‘Land at Ystradowen (Site ID: 430 / 4060)’ is equally as sustainable – in fact considered more suitable (given its higher scoring in this respect).
Furthermore, we question the “soundness” of the assessment of ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, given that 7/34 (21%) of the criteria do not appears to have not been assessed – i.e. 7/34 (21%) of the criteria are scored grey. This raises questions regarding the “soundness” of this site, given it appears this sites acceptability and inclusion was pre-determined.
It is clear therefore that if ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ has been deemed acceptable for allocation, yet ‘Land at Ystradowen (Site ID: 4060)’ scores higher/more positively (i.e. green) than this site, ‘Land at Ystradowen (Site ID: 4060)’ should also be deemed acceptable and be allocated. Not least as the site is “proposed for a small-scale affordable housing led development in a minor rural settlement … would accord in principle with the strategy”, and “could make an important contribution in meeting “a “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge”.
Summary and Conclusion
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Deposit Plan published as part of the consultation.
In terms of SECTION 4, and a response to the Candidate Site Assessment at Deposit Plan Stage, the following key points have been made:
• The Council’s ‘Stage 2 Detailed Site Assessment’ justification for ‘Land at Ystradowen (Site ID: 4060)’ is fundamentally incorrect;
• Given the material positive similarities between ‘Land at Ystradowen (Site ID: 4060)’ and ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, which has been deemed acceptable and allocated, ‘Land at Ystradowen (Site ID: 4060)’ should also be deemed acceptable and allocated accordingly;
• ‘Land at Ystradowen (Site ID: 4060)’ would help to alleviate and satisfy “a need for 230 additional affordable units over the next 15 years” within “the ward of Cowbridge”; and
• ‘Land at Ystradowen (Site ID: 4060)’ scores higher/more positively (i.e. green) than ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, and so should also be deemed acceptable and be allocated;
Ultimately, ‘Land at Ystradowen (Site ID: 4060)’ is “proposed for a small-scale affordable housing led development in a minor rural settlement”, and as such “would accord in principle with the strategy”. It would therefore “make an important contribution in meeting“ the “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge”.
We would therefore object the Council’s assessment that the site is not considered suitable for development.
Summary of These Representations
In short, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised below in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Preface
This Submission sets out the detailed case in support of these representations. The representations are structured as follows:
1. Procedural Consultation Matters;
2. Timing Assumptions underpinning the Trajectory;
3. Housing Delivery Rate Assumptions;;
4. Status & Standing of Sites included in the Trajectory;
5. Key Sites;
6. St Athan Train Station;
7. Geographic distribution of the ‘new’ sites / provision;
8. Detailed comments in respect to ‘new’ sites;
9. Credentials of this site subject to this submission; and
10. Conclusions Procedural Consultation Matters
Firstly, we do not consider that the consultation on the Housing Trajectory information has been procedurally undertaken appropriately or suitably.
Only 14 days have been afforded to parties to make representations on the information provided. This is despite new sites being introduced (at this late stage) i.e. Land South of Clive Road (identified in Table 4), as well as a number of affordable housing-led housing sites being introduced (i.e. those outlined in Table 5). This does not provide an adequate process or timescale for objectors to scrutinise the published content, and to make comments on sites which have been presented for the first time at a late stage in the process.
As part of these representations, we will be making brief comment on the sites which have not been previously consulted upon, namely:
Other Housing Allocations
• Land south of Clive Road, St Athan;
Affordable Housing Led Sites
• Land at Heol Fain, Wick;
• Land west of Maendy Road, Aberthin;
• Land Noth of West Winds Business Park, Fferm Goch; and
• Land to the east of Coliwinston, Colwinston.
It is considered necessary to comment on these sites, given that they form an important and critical part of the housing trajectory, and by association in the Council and Plan reaching their targets. Moreover, these sites have not been consulted on previously. Accordingly we consider it necessary to pass comment on these in order to ensure that the consultation is fair and robust.
As well as limited time given to comment on the information contained within the Housing Trajectory, the LPA have failed to set up a Housing Stakeholder group to agree and discuss the trajectory information and data – with the cover email to the consultation (dated 3rd October 2025) stating “it is considered that it would be the best use of stakeholder time to conduct this engagement via email, particularly as many of the forecasts have been developed in consultation with site promoters including developers and their agents”.
We submit that the stakeholder consultation has not been a transparent nor robust consultation process, given that the Development Plans Manual states at Para 5.66 “A housing trajectory must be prepared to support the Deposit Plan. In order to generate a housing trajectory and associated phasing tables it will be necessary for LPAs to engage with stakeholders through a Housing Stakeholder Group. This will ensure that the timing and phasing of sites is robust and based on up to date information”. Given that this has not taken place, we would raise fundamental concerns that the consultation of the trajectory has not adequately taken place as per the relevant guidance. Afterall, the guidance stresses that a Group should be formed as a necessity. Accordingly, there has not been an adequate process and opportunity to review and comment on the information published, including in respect to the other sites have been introduced at this late stage.
Timing Assumptions underpinning the Trajectory
The assumed and factored in timescales of the various stages of bringing forward sites i.e. the pre-application stage, the planning application process, and the discharge of condition process outlined in the trajectory are considered to be fundamentally inaccurate, and result in a distorted position of the delivery of housing sites over the RLDP Plan period. The assumptions are far too ambitious, and without evidence / are not comparable with the timescales being incurred in processing such stages at the Development Management stage(s).
Specifically, we raise objection to the following timescales which are considered to be extremely ambitious and unrealistic:
• “Time period of pre-application discussions/PAC consultation” = 4 months
• “Time between submission of planning application and determination” = 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” = 4 months
In our experience, having submitted a significant number of major and other applications for housing and other forms of development in the last 1-2 years to the Council (and elsewhere in Wales and England), it is extremely unlikely that major applications can be submitted, and planning permissions granted, within the timeframes assumed by the trajectory. A wide range of stakeholders are also involved in the determination of major planning applications, which often adds to the delays associated with the determination of such applications. We would therefore consider that a time period of “6 months” given to all major applications in the housing trajectory is not feasible, and distorts the trajectory timescales for the remaining Plan period.
The assumptions in the trajectory are also solely based on expected timescales for the processing of formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission (i.e. pre-application enquiry submissions / planning application / discharge of condition details etc). When factored in these will elongate the timescales for bringing forward schemes considerably.
Moreover, it is common practice for larger housing sites and major applications to have a range of pre-commencement conditions attached to a permission once granted. Again, we would raise concerns with the timescales indicated in the trajectory related to this part of the planning process. It is highly unusual and questionable that any technical work required by these conditions (usually relating to drainage and highways matters) would be instructed, completed and submitted within 2 months, and for these to then be signed off / approved in a further 2 months. There are also other technical matters and necessary approvals falling outside of, and over and above, the planning system, such as SAB, s.106, s.38 and s.278 agreements, timescales for which have not been accounted for – and all of which are rarely completed within “4 months” as indicated.
It is therefore highly doubtful that the timescales legislated for in the trajectory for the various stages pre-construction are achievable – with no information about these proposed timescales outlined within the supporting text of the Housing Trajectory. We would therefore raise considerable concerns and objections to these as they stand without full evidence to fully show how these have been calculated, and without there being considerable (and necessary) adjustment to the timescales indicated and factored in.
We would therefore object to the timescales indicted in the ‘Timing and Phasing of Sites’ table, given that the delivery start dates will be pushed back further into the Plan period. Accordingly, and as a result, the Plan is at risk of not delivering the level of housing expected based on the sites allocated, at least as swiftly as is set out in the trajectory.
Housing Delivery Rate Assumptions
We would also raise considerable doubt over the proposed delivery of the sites identified in the Housing Trajectory - which we do not consider are robust or reasonable.
The development trajectory bar chart set out in the consultation material (extracted below) anticipates and legislates for a number of critical events and circumstances – all of which are considered to be unrobust and unsound.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
Firstly, a large ‘spike’ (material increase) in housing delivery is factored in to take place in 2027 – 2028. This is a marked and pronounced step change in the rate of delivery, and envisages / relies on a significantly higher rate of delivery than previous years in The Vale of Glamorgan (2021 through 2025 - as depicted by the green columns). This is considered extremely unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions in The Vale of Glamorgan from 2021 - 2025 has been approx. 400 - 500 units. However, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100%relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
The anticipated delivery of housing also fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2015.
To summarise, we consider the defined position to be wholly manufactured and unreflective of the past completion rates, as well as the recently published completion rates provided by Welsh Government recently in August 2025. In the Welsh Government Statistics Document ‘’New House Building: April 2024 to March 2025’, information on the number of new dwellings started is provided, where building has commenced and those completed for April 2024 to March 2025. Figure 1 provides a graph showing starts in the last 10 years, and it is clear that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1:.‘New House Building: April 2024 to March 2025’
In 2024-25, 4,631 new dwellings were completed, 3% fewer than in the previous year. This was the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed). The New Housing Pipeline Report Quarter 2, 2025 Report (September, 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 6% during the second quarter of 2025, continuing the decline of approval during the first three months of the year. Wales saw one of the largest declines in the UK in approvals with a decline of 29%.
Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
The Home Building Sector Skills Plan (Aug 2025) published by the HBF also identified the following issues with the workforce to bring forward built development in Wales:
• “A shortfall in numbers entering roles from the education system;
• An ageing workforce: 25% of the home building workforce is aged over 50, meaning the sector is facing an impending retirement cliff edge;
• Challenges attracting a wider talent pipeline into the sector;
• A lack of understanding of critical future skills needed, and direction from the Future Homes Standard; and
• Output within the sector fluctuating with demand and economic pressures, leading to additional pressures in recruitment and training”.
It is not considered that in the next 1-2 years that any of these issues can or will be substantially corrected – at least sufficiently so to allow for, and enable, the planned delivery rates of new housing completions to be as high as < > 1,000 homes in one year (and for four consecutive years at that).
We would therefore object to the proposed numbers of completion expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated.
Status & Standing of Sites included in the Trajectory
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
Table 6: Existing LDP allocations to be carried forward
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ‘’soundness’’, and risks rendering the Plan unrobust.
On this basis, we would object to the Plan if the provision of housing is not adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply.
Key Sites
As set out in previous representations at Preferred Strategy stage, it is considered that the housing supply relies heavily on the delivery of the ‘key sites’ to deliver housing (and meet need) over the Plan period. The total number of housing units attributed to key sites amounts to 2,278, which equates to over 25% of the total provision in the Plan period.
As detailed above, we consider there to be concerns regarding the proposed ‘Timing and Phasing of Sites’ table included in the Housing Trajectory which we consider are not reflective or accurate and will therefore have the effect of delivery start dates being much later into the Plan period than anticipated. The result of this will be that the Plan will be at risk of not delivery the level of housing expected and needed. Moreover, the Housing Trajectory Graph presents an overly ambitious level of housing completions over the Plan period - which the Council consider will be markedly higher than the average levels experienced in the last five years. Again, for the reasons set out above, we consider that these rates of expected completions to have no evidence supporting them, and to be unachievable and unsound.
Insofar as to the removal of the previously proposed site ‘Land at North East Barry’, this site was expected to deliver 900no. units in the Plan period. Following its omission from the housing supply, other sites have been identified, which comprises the inclusion of a new key site (Land at North West Barry), 3no. non-strategic sites, and also affordable housing-led allocations. In terms of the quantum of development attributed to these new sites, this amounts to 659no. dwellings. This is some 250 units less than the 900no. homes that was previously attributed to ‘Land at North East Barry’. Whilst it is appreciated that the number of homes forming part of the existing supply (completions, units with planning permission etc.) have increased since Preferred Strategy stage, there will be a net loss in market housing provision and delivery.
This position is made worse and compounded as a result of accounting for the affordable-led sites in making up the housing supply.
As set out within the Preferred Strategy, these sites are expected to deliver at least 51% affordable housing. These units are not open market units, and will not / cannot contribute to the supply of such housing. These units will contribute to the provision of affordable housing, and will go some way to meeting the acute need for such housing (albeit will not eradicate / address in full the well known and accepted considerable requirement). Accordingly it is considered that these sites should be in addition to the housing supply, as opposed to forming part of the provision. In turn, there would need to be an increase in allocations for non-strategic sites, to ensure that there is sufficient market housing delivery over the Plan period.
Were such changes to be made and introduced, this would achieve and assist realise a more robust and sound housing supply, which will ensure that the identified housing need is met / addressed over the Plan period. Without these changes it is considered that the housing supply is not sufficient, and inevitably, housing need will not be met within the Plan.
St Athan Train Station
As set out in the Preferred Strategy (para A3.29), the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,183no. homes to be delivered in St Athan over the Plan period.
It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales. The focus in the first phase of such improvements across the region is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that these sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,183no. homes are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
We therefore consider the Trajectory to be both unrobust and unsound, and therefore, we object to the Trajectory in its current form accordingly.
Geographic distribution of the ‘new’ sites / provision
As a general and overarching comment in respect to the additional sites now included within the Plan, and forming part of the trajectory, (and a matter expanded upon when critiquing each of these sites in the next section to this submission), it is clear and evident that these additional sites have been positioned to settlements that have already, and recently, been attributed significant growth in the preceding Plan and plan period.
Significant allocations (which have also contributed to significant levels of affordable housing) have been realised and built out in locations such as Wick and Colwinston). Notwithstanding this, two of the additional sites are now proposed for these recently expanded settlements. Given that the purpose of the affordable housing led allocations is to meet unmet affordable housing need, it is questioned why such new allocations are attributed to settlements that have already seen open market and affordable housing provision, as compared to other comparable settlements that have not received any growth whatsoever over a considerable period of time.
It is considered accordingly that the geographic positioning of these allocations is at odds with their underlying purpose - to meet unmet affordable housing need in communities that have seen no provision.
Detailed Comments in respect to ‘new’ sites
Other Housing Allocations
Land south of Clive Road, St Athan
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
As set out at the outset of these representations, and whilst we note the findings of the Candidate Sites Assessment at Preferred Strategy Stage (i.e. Suitable for further consideration), we do not consider that the consultation on this site has been undertaken procedurally appropriately or suitably. We therefore consider the consultation on this site is “unrobust” and “unsound”.
As set out previously, the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales, where the focus is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision, and as such, to add a further site for housing over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites – given their incompatibility with the core strategy of the RLDP.
Affordable Housing Led Allocations
Land at Heol Fain, Wick
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
Candidate Site Stage 2 Assessment (Site Ref. 404)
The findings of the Candidate Site Assessment for this site are noted. We are assuming the reason this site is proposed to be allocated is a product of the site promoters/developers heading the findings stated below, and changing the form of development to be in accord with this:
“A market housing led scheme would not be acceptable, but the site could be reconsidered as a small scale affordable housing led development subject to need and viability at a maximum of 50 dwellings. In accordance with the Settlement Appraisal Review, it is considered that Wick could potentially accommodate limited affordable housing led growth.”
Whilst no clearly evident deficiency exists in respect to the site, it is known that Wick has been subject to significant growth and expansion in recent years – not least by virtue of significant housing allocations in the settlement as part of previous plans.
To evidence this, 35% of the 124 units approved on the ‘Rectory Field, St Brides Road’ site (i.e. circa 43 units as per site allocation ref. MG(47) and PP ref. 2014/01424/FUL) were approved as Affordable Housing units. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Wick, further provision ought to be made in comparable (previously unprovided for) locations, such as Ystradowen.
Land West of Maendy Road, Aberthin
‘Land West of Maendy Road’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however as far as we know from our review, there is no assessment and critique of this site. This site has not been included in the ‘Candidate Assessment at Preferred Strategy Stage’ (October 2023). As such, with an absence of publicly available information, it is not clear how the Council has judged this site against the criteria. This raises questions accordingly in respect to the “soundness” of a site which forms part of the intended housing land supply, and by association the trajectory. Without this, and without being consulted on (as others have been prior to this) we question whether this allocation is “sound” (i.e. its allocation is considered to be “unsound”).
Despite the absence of site-specific assessment criteria, as the RLDP preferred strategy states a key objective guiding site selection is that the Plan will “provide for vital and vibrant rural communities whilst protecting the countryside through the delivery of growth in sustainable locations related to the settlement hierarchy alongside the provision of supporting infrastructure” (Objective 7 ‘Fostering Diverse Vibrant and Connected Communities’), it is reasonable to assume that the Council considers ‘Land West of Maendy Road’ to be a ‘sustainable’ location.
Given this, we have reviewed the key services in proximity to the site. The following services were identified:
• In terms of public transport, there are two bus stops located approximately 0.2 miles (4-minute walk) from the site (‘Land West of Maendy Road’), with the 321 providing services between Llantwit Major and Talbot Green.
• The site is also located 0.2 miles (4-minute walk) from The Farmers Arms Pub and 0.2 miles (4-minute walk) from The Hare and Hounds Inn.
• The site is located 0.2 miles (5-minute walk) from Aberthin Village Hall.
Aberthin is in close proximity (1.2 miles/14-minute walk) to the key settlement of Cowbridge - which is identified as a sustainable location, and is ranked 4th place for services and facilities within the Vale of Glamorgan. The following key services are found in Cowbridge, and are therefore in close proximity to ‘Land West of Maendy Road’:
• Cowbridge Comprehensive Schools;
• Cowbridge Health Centre; and
• Cowbridge Town Centre for various Retail Services.
Considering this, there is no material difference between ‘Land West of Maendy Road’ and ‘Land at Ystradowen’ in sustainability terms. Given that Ystradowen is located only 2.7 miles from Cowbridge (9- minute bus journey), the candidate site at ’Land at Ystradowen’ is no less sustainable than the site at Aberthin. The following key services are within Ystradowen and therefore in close proximity to the promoted site:
• In terms of public transport, there are two bus stops located approximately 400m (7-minute walk) from the site (‘Ty Mawr Close’), with the ‘321 Nat Group Service’ providing services between Llantwit Major and Talbot Green. The 321 service is the same bus service that serves ‘Land West of Maendy Road’ / Aberthin.
• The site is also located 300m (3-minute walk) and 600m (10-minute walk) from Sports Pitches/Playing Fields such as ‘Ystradowen Children’s Park’, and the 3/4G Sports Pitch at ‘Ystradowen Petanque Club’.
• Furthermore, the site is located 480m (7-minute walk) from the ‘Murco – Tudor Garage’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
Accordingly, it can be considered therefore that if the proposed allocated site ‘Land West of Maendy Road, Aberthin’ is considered sustainable and by association suitable to be an Affordable Housing Led Allocation, ‘Land at Ystradowen’ is equally suitable to be an Affordable Housing Led Allocation.
Furthermore, to reinforce the above position and to illustrate and evidence the site’s sustainability, the following has been taken from the Officer’s Reports associated with the applications for the site that directly adjoins the western boundary of the promoted site 430 - ‘Land off Sandy Lane, Ystradowen’ (Housing Allocation 48). An aerial view extract is outlined below to give spatial context:
Reference is made in the Final Report of app ref. 2013/00856/OUT which states that “Ystradowen is considered a sustainable settlement for further housing development”, due to “the sustainable nature of the settlement”.
Furthermore, the Final Report of app ref. 2023/00948/FUL states:
• “Notwithstanding this, the site is located in close proximity to local services and there is a bus stop located nearby. Whilst the comments relating to the reliance and frequency of the bus services have been considered, there still remains a bus service in the area.”
• “Firstly, as aforementioned, many neighbouring comments refer to the site as unsustainable and have commented on the suitability of public transport and cycle routes etc. This has been addressed above.”
The above clearly evidences that the location has previously been endorsed as, and is currently still found to be, sustainable.
A further key consideration to note and one which does differentiate between the relative merits of the ‘Land at Maendy Road, Aberthin’ and ‘Land at Ystradowen’ is that the LDP Proposals Map demonstrates that ‘Land West of Maendy Road’ is within a Special Landscape Area - see overleaf:
Vale of Glamorgan Proposals Map (Land West of Maendy Road outlined in red)
Under Policy MG17 ‘Special Landscape Areas’ it is considered that development in SLA could pose an “unacceptable harm to the important landscape of the area”. Accordingly, this development and proposed allocation could therefore cause “unacceptable harm to the important landscape of the area”.
‘Land at Ystradowen’ by contrast does not sit within a SLA (see below). This site would therefore not pose any potential concern in this respect as it would ultimately not cause any “unacceptable harm to the important landscape of the area”.
Vale of Glamorgan Proposals Map (Land at Ystradowen in red)
This is a significant factor to consider. ‘Land West of Maendy Road, Aberthin’ causing “unacceptable harm to the important landscape of the area” will lead to this proposed allocation being at risk of not being delivered by virtue of detailed assessments of its impacts and acceptability at planning application stage holding that the landscape and visual impact of development of the site is unacceptable. As such 25 affordable units will be lost from the proposed affordable 122 units, and ultimately being lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is not delivered (as it is located in a SLA), and so a “small scale affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” is not provided for. This is clearly an issue. Given however ‘Land at Ystradowen’ does not sit within a SLA – and so not pose any potential concern or cause any “unacceptable harm to the important landscape of the area” – the allocation of this site would be more suitable and “safer” - as therefore would be no concerns over this proposed allocation being removed and/or not being delivered in this respect (as it is not located in a SLA). This would ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”, are provided for. As such the proposed housing trajectory would be maintained.
Land North of West Winds Business Park, Fferm Goch
The below sets out the candidate site stage two assessment of ‘Land to north and west of Westwinds Business Park’:
Candidate Site Stage 2 Assessment (Site Ref. 398)
As can be seen above, the site was not considered suitable for further consideration, with the site scoring negatively (red) in respect to a number of key factors. These include the following:
• Access to Retail;
• Access to Health Services;
• Sustainable Transport- Public Transport;
• Access/ Proximity to services and facilities conclusion;
• Climate Change; and
• Health and Wellbeing.
Given the fact the site scores red in ‘Sustainable Transport – Public Transport’, this shows the site is not served by public transport connections within 800m, as outlined in the key below:
Additionally, Policy SP7 (Sustainable Transport) of the Vale of Glamorgan Preferred Strategy states “New development must support an enhanced transport network that increases the proportion of journeys being undertaken by sustainable travel modes”. Additionally Objective 8 (Promoting Active and Sustainable Travel Choices) states “new development is directed to locations that are or can be accessible by a choice of modes of transport, including walking, cycling, and public transport.”
It is well known that residents of affordable housing are statistically less likely to own private vehicles, making access to reliable and frequent public transport essential for ensuring equitable mobility. The provision of public transport infrastructure in close proximity to such developments is therefore a critical component in supporting access to employment, education, healthcare, and other key services, while also promoting sustainable travel patterns and social inclusion.
The site also scores red in respect to Access/Proximity to services, showing the site is greater than 1200m away from key services, as seen in the key below:
In respect of the above, Preferred Strategy 6.40 states the need “To ensure that new development takes place in locations that have the best access to a wide range of services, facilities, and employment opportunities, whilst minimising the need to travel, the distribution of growth is guided by the following settlement hierarchy”. To further highlight the importance of both sustainable transport and proximity to services, the preferred strategy also states the need to “Facilitate the development of adaptable, accessible, well-connected communities that have a strong sense of identity, offer a sustainable range of services and facilities and are equipped with adequate infrastructure”. In addition, Promoting Active and Sustainable Travel Choices outlines to “Promote and encourage the use of sustainable methods of travel, particularly active modes of transport, whilst simultaneously reducing the need to travel”.
In light of the above, this site does not align with the aims and targets set out in the Preferred Strategy, as it fails to meet several key development goals set out. It should therefore not be considered suitable to be allocated for future developments. Its inclusion is therefore unsound.
Should this view be concurred with, 22 affordable units will be lost from the proposed affordable 122 units, and ultimately will be lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is removed and/or not delivered as its inclusion is unsound as it does not align with the aims and targets set out in the Preferred Strategy - as it fails to meet several key development goals set out. A “small scale affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” will therefore not be provided for. This is clearly an issue.
When comparing this with ‘Land at Ystradowen’, the following is set out:
Access to Services and Facilities
This criterion has been assessed firstly on the location of the site proposal in terms of whether it is located within, adjacent to, or outside a settlement, and secondly the ease of pedestrian and cycle access to key services listed below.
With reference to the above:
• In terms of public transport, there are two bus stops located approximately 400m (7-minute walk) from the site (‘Ty Mawr Close’), with the ‘321 Nat Group Service’ providing services between Llantwit Major and Talbot Green.
• The site is also located 300m (3-minute walk) and 600m (10-minute walk) from Sports Pitches/Playing Fields such as ‘Ystradowen Children’s Park’, and the 3/4G Sports Pitch at ‘Ystradowen Petanque Club’.
• Furthermore, the site is located 480m (7-minute walk) from the ‘Murco – Tudor Garage’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
These services and facilities are therefore well within the best category (i.e. categorised/scored as ‘green’) - within 800m of site (10-minute walk). Accordingly, the site therefore has good access to services and facilities.
Furthermore, the settlement of Ystradowen has been ranked highly in the VoG Sustainable Settlements Appraisal, scoring a total of 14 points according to the distance to key services and facilities available. This places Ystradowen 26th out of a total of 87 settlements. As a result, this would be deemed a suitable area to accommodate growth.
As stated above the key settlement of Cowbridge is located in close proximity being only 2.7 miles to the south and a 9- minute bus journey. Cowbridge is identified as a sustainable location, and is ranked 4th place for services and facilities within the Vale of Glamorgan. The following key services are found in Cowbridge, and are therefore in close proximity to ‘Land West of Maendy Road’:
• Cowbridge Comprehensive Schools;
• Cowbridge Health Centre; and
• Cowbridge Town Centre for various Retail Services.
Furthermore, it is important to note that the above criteria does not take into account the important role and proximity of the Principal Settlement and Strategic Growth Area (as defined in the RCTCBC LDP) of Talbot Green / Pontyclun / Llantrisant which is 2.8 miles to the north (14-minute bus journey). Ystradowen would also naturally align, and function, in association with this Principal Settlement and Strategic Growth Area (of Talbot Green / Pontyclun / Llantrisant). These areas comprise for example the following key services:
• Cowbridge and ‘Y Pant’ Comprehensive Schools;
• Cowbridge Health Centre and Old School Surgery; and
• Cowbridge Town Centre, and Talbot Green / Pontyclun / Llantrisant (Strategic Growth Area), for various Retail Services.
Given the above, ‘Land at Ystradowen’ does/should align with the aims and targets set out in the Preferred Strategy as it meets several of the key development goals set out. Its inclusion should therefore, in our view, be considered “sound” and therefore suitable to be allocated for future developments. The site should properly and appropriately be allocated in lieu of ‘Land to north and west of Westwinds Business Park’ – the inclusion of which is “unsound”. ‘Land at Ystradowen’ would therefore ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”, are provided for. As such the proposed housing trajectory would be maintained.
Land to the East of Colwinston, Colwinston
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below:
As outlined above, the site was rejected and considered not suitable for further consideration. In fact, and unlike ‘Land at Heol Fain, Wick’ and ‘Land to north and west of Westwinds Business Park’ it was stated that this site “could not be considered as a suitable affordable housing led development site”. Despite this, this site is identified to be allocated as an Affordable Housing Led Allocation. As such, the inclusion of this site is “unsound”.
It is known that Colwinston has been subject to significant housing allocations in the settlement as part of previous plans. To evidence this, 25% of the 64 units (i.e. 16 units) were approved on the site allocation ref. MG2(41) and PP ref. 2014/00242/FUL. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Colwinston, further provision ought to be made in comparable (previously unprovided for) locations, such as Ystradowen.
Credentials of this site subject to this submission
There has been a significant change in the position and circumstances since the promoted site herein was assessed at Candidate Site Stage and the Assessment undertaken. The Stage 2 Assessment of the site concluded the following: ‘Whilst adjoining the existing LDP settlement boundary this is by virtue of an existing adopted plan LDP allocation this is currently under review. Notwithstanding this the site would represent unacceptable intrusion in to the open countryside.’
The assessment/conclusion implies that as this site (‘Land off Sandy Lane, Ystradowen’) has not been built out and is “currently under review”, it suggests that ‘Land at Ystradowen’ (430) does not adjoin the existing LDP settlement boundary. Given recent developments however associated with the implementation of the planning permission ref. 2023/00948/FUL (post approval on 9th December 2024) and the site being currently being “built out” and work commencing on site, the site no longer adjoins “the existing LDP settlement boundary … by virtue of an existing adopted plan LDP allocation … currently under review”. Accordingly, and given this, the ‘Land at Ystradowen’ site boundary therefore directly adjoins/is adjoining the LDP settlement boundary and the site promoted herein.
The following specific photo evidences ‘Land off Sandy Lane, Ystradowen’ (Housing Allocation 48) is being built out the western boundary of the promoted Site ID 430. This therefore clearly highlights that the site’s boundary is representing the existing settlement limit in the existing development plan. Accordingly, the ‘Land at Ystradowen’ site boundary therefore directly adjoins/is adjoining the existing LDP settlement boundary.
Summary of These Representations
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised above in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 7050
Derbyniwyd: 10/03/2026
Respondent ID: 2413
Ymatebydd: Marion morgan
Asiant : Geraint John Planning Ltd
It is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands.
ANNEX 1
Preface
This Annex sets out the detailed case in support of these representations, and by association the case for allocation of the site.
The representations are structured into the following sections:
1. Response to the Deposit Plan;
2. Comments on specific policies; and
3. A summary of the suitability of the site for development.
SECTION 1. Response to the Deposit Plan
Distribution of Growth
We object to the distribution of growth within the Deposit Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain the majority of housing growth in the Vale over the Plan period, or rather the over-reliance on this defined area, and the associated absence of growth in other parts of the Plan area.
As outlined in our previous representations, the allocation of housing and the location of strategic growth neglects the Rural Vale, and in our view, overprovides in the Strategic Growth Area. For example, with limited housing stock and average house sales at over £500,000 over the last 12 months, there is a clear and established need for new homes in the Ystradowen area, particularly at an affordable level. This is reinforced by the Local Housing Market Assessment that identified a need for over 1,114 new affordable homes per annum over the next five years throughout the county, and 196 units per annum thereafter (average of 502 units per annum over 15 years). Further to this, it is widely known that the rural Vale comprises the majority of the county’s ageing population, which, as a demographic, has and will continue to grow rapidly over the Plan period. This is evident in the ‘Population Change’ chart below – which is taken from the Deposit Plan:
VofG Deposit Plan: Figure 4 Population Change 2011 to 2021
It is clearly the case that younger populations are migrating to other Authorities, where access to housing is typically cheaper and more affordable, whilst more older populations are significantly migrating into the Authority. This trend will result in an extremely unbalanced demographic, given that the working-age population have sought housing elsewhere.
Without a suitable supply of affordable housing delivered over the Plan period, this trend will only worsen. Accordingly, it is not considered that the RLDP takes into account the lack of supply of affordable homes within the rural Vale, as well as increased housing to support the growing ageing population within these areas.
Para 3.19 of the Deposit Plan clearly outlines that affordable housing is required in the short term, in order to meet pressing needs. Specifically, it outlines the following: “There is significant pressure on temporary accommodation in the Vale, for a variety of reasons including increased homelessness presentations… The need for sufficient permanent affordable housing to assist in moving people out of temporary accommodation is critical and the planning system has a vital role in assisting in new affordable housing delivery.”
Accordingly, the distribution of growth within the Authority must be proportionate, to ensure that populations / areas are not left behind where they must seek access to housing elsewhere.
The RLDP Sustainable Growth Strategy sets out 6 objectives. Objective 4 states: “Allowing for small scale affordable housing led development in settlements outside the Strategic Growth Area at a scale proportionate to the size of settlement.” (Page 66)
Para 5.25 states “Therefore, a key part of the strategy is to allow for affordable housing led developments within sustainable primary and minor rural settlements outside of the Strategic Growth Area, at a scale that is appropriate to the size of the community it is serving. An ‘affordable housing led’ scheme is one where a minimum of 50% of the dwellings would need to be affordable, although this could increase to a maximum of 100% if the site is brought forward by a social landlord”.
In terms of the definition / explanation of what the affordable housing-led development sites are seeking to achieve, paragraph 6.132 of the Deposit Plan outlines the following:
“Accordingly, to ensure that new developments respond to the high demand for smaller properties, as identified in the LHMA, priority will be given to affordable homes that are small to medium-sized, typically comprising one to three bedrooms. Representations received from the local community through the RLDP process also highlighted a desire for new housing developments to offer opportunities for accessing smaller market homes. This is particularly relevant in the rural Vale, where housing choices are more limited. Providing smaller, more affordable market homes may assist first-time buyers and enable older residents to downsize to more manageable properties within their local area. Affordable housing-led sites will therefore need to demonstrate that an appropriate range of both affordable and market dwellings has been provided.”
Despite the acknowledgement within this strategic objective, we do not consider that the RLDP goes far enough to meet this objective, nor are its provisions and allocations adequate.
It is considered that this objective is undermined by the allocations set out by the RLDP (not least the absence of allocations in the rural Vale). Notwithstanding the Vision’s clear acknowledgement of the benefit of the growth of the rural Vale, these areas have not been supported through the plan due to the lack of growth which has been attributed to these areas in terms of further housing, employment and sustainable transport. All growth options have been selected on the basis of being in either a Key Settlement, Service Centre Settlement or Primary Settlement, all of which are already sustainable areas served by rail. As a result, it is not clear how this objective can be achieved, without the allocation of further sites within the Minor Rural Settlements, such as Ystradowen. The Vale is characteristically ‘rural’, and as such, there needs to be a stronger emphasis on supporting and delivering new development in order to bolster the rural economy. This includes enabling opportunities to provide employment and business premises within / near to rural settlements, as well as focusing housing growth in these areas to reduce travel time, and promote the use of sustainable transport.
It is considered that the current Strategy does not provide adequately for all residents across the Vale, only those within the Strategic Growth Area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan. This brings into question the “soundness” of the Plan.
The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north (as defined in the RCTCBC LDP). The Minor Rural Settlements to the west are more likely to be supported by job opportunities and employment in Bridgend than further east in Barry or Cardiff. Similarly, those in the north align with, and function in association with, the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north. These settlements are served by existing bus services that provide sustainable modes of travel to key employment locations in and around Bridgend. This is acknowledged in Paragraph 3.3 of the Strategy which states “The greatest number of residents who travel outside of the Vale for work purposes travel to Cardiff followed by Bridgend and Rhondda Cynon Taf, whilst a smaller proportion commute into the Vale from these neighbouring authorities”. The Demographic Evidence (Feb 2023) estimates the Vale as being a net importer of workers from RCT and Caerphilly (Para 3.6) - as shown in Figure 10 in the Preferred Strategy.
The current Strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas - given that Growth has been apportioned in only the Key Service Centre and Primary Settlements. It is considered that this will fail to support and facilitate the current (and any future) employment coming into the Vale, nor will it support any employment which is located outside of the Vale to the West and North. The Growth Option is too heavily reliant on access to railway stations as the key and sole sustainable transport method, whereas access to bus services should also be appropriately assessed and focused on in terms of promoting sustainable development. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural. The delivery and soundness of the Plan is therefore questioned and we continue to object to the spatial growth strategy as set out in the Deposit Plan.
Housing Supply
RLDP Allocations - Key Sites
As set out in representations made throughout the Plan preparation process, we consider that the Plan is too reliant on the delivery of ‘key sites’ to meet the housing need over the Plan period. Specifically, the Plan makes provision for 2,278 units in these Key Sites, which equates to circa 65% of RLDP allocations in the housing supply. The 5 key sites that are allocated in the Deposit Plan are as follows:
• Land at North West Barry – 376no. units;
• North of Dinas Powys – 250no. units;
• Land at Readers Way, Rhoose – 520no. units;
• Land at Church Farm, St Athan – 532no. units; and
• Land to the West of St Athan – 600no. units.
We object to the current housing supply to allocate 2,278no. (65%) of units across strategic sites, as this makes for a risky and unrobust strategy for delivering housing, and in turn, meeting the identified housing need over the Plan period.
As stated in previous representations, there is concern that the proposed timing and phasing of the proposed Key Sites is unrealistic and unrobust, and in turn, undermines the soundness of the Plan, given the heavy reliance on Key Sites delivering new homes across the Plan period. Whilst it is not disputed that the sites would have gone through rigorous assessment to inform their proposed allocation, the timescales for securing planning permission (with all associated conditions discharged) is considered to be unachievable. This is particularly the case for the following timescales that are set out in the Housing Trajectory that underpin the Plan:
• “Time period of pre-application discussions/PAC consultation” – 4 months
• “Time between submission of planning application and determination” – 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” – 4 months
It is considered that the above timescales are fundamentally unrobust, and result in a distorted position of housing sites over the RLDP Plan period. It is not considered that these reflect or are informed by the timescales that are currently being incurred for planning applications submitted for major housing sites across Wales. It is rather the case that such applications would typically be determined 1-2 years following submission, given that there are a wide range of stakeholders involved in the determination of major planning applications – which often adds to the delays associated with the determination of such applications.
It is equally the case that the assumptions in the trajectory are solely based on expected timescales for processing formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission.
It is assumed that these timescales have not considered that such major developments can be subject to the need to undertaking and submitting an Environmental Impact Assessment (EIA), which adds another layer to the determination of any planning application – given the additional considerations that form part of this process. As such, any site subject to EIA would very likely result in further delays extending beyond the timescales set out in the trajectory. Equally, as set out above, the preparation of an application subject to an EIA requires even more detail and assessment, which only further adds to the preparation stage (which has not been factored into as part of the trajectory). Accordingly, it is not considered that the trajectory contains any contingency if any site is required to undertake EIA as part of their application.
For the reasons stated above, it is unlikely that the sites will yield in full, particularly those sites which are expected to deliver housing right up to the final year of the Plan period (‘Land at Readers Way’ and ‘Land to the West of St Athan’). These sites do not allow for any ‘slippage’ should any delays arise through the development management process (which for the reasons set out above, will very likely be the case), and as such, a gap in housing delivery will be brought about as a result of these sites not yielding in full.
Given the proposed ambitious timescales set out for the delivery of the Key Sites, it is considered the housing trajectory is unrobust, and in turn, undermines the soundness of the Plan as a result. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to fully yield given that such sites are subject to less assessment and consideration compared to strategic sites. This would make for a more robust strategy, where a greater number of small to medium sites can deliver housing in the short and medium term of the Plan period, whereas the strategic sites represent a more longer-term strategy to deliver housing – which would then spill into the next Plan period.
Accordingly, we object to the Deposit Plan in its current form, where there is an overreliance on housing need to be met through the delivery of the Key Sites, which we consider to be unrobust, and undermine the integrity and soundness of the Plan. The current strategy of the Plan is at significant risk of not delivering the level of housing expected based on the sites allocated, as least as swifty as identified in the housing trajectory. Should no change be made to the Plan to address the above issues, then it is extremely likely that the Plan would ‘fail’ in meeting the identified housing need.
Windfall Sites
It is noted that the RLDP is made up of the following:
• Existing land supply (3,838 units)
• Windfall sites (1,303 units)
• Allocated sites (3,521 units)
Para 6.69 states that “Analysis of historical delivery of housing indicates that on average small windfall sites (sites of less than 10 dwellings) have provided some 53 dwelling completions per year, and large windfall sites (10 dwellings or greater) contributed on average 80 dwellings per year. Overall, it is projected that windfall sites could contribute a further 1,303 dwellings over the remainder of the plan”.
As set out in our previous representations to the Housing Trajectory, we would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan – which is discussed in greater detail later in this submission. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
St Athan Train Station
The RLDP Sustainable Growth Strategy comprises six key elements, of which the following is set out in respect to the allocation of new housing growth in the Authority:
“3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.”
The strategy outlines that a feasibility study for a station in St Athan had been undertaken in 2022, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ and 80no. units attributed to ‘Former Stadium Site, adjacent to Burley Place’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,263no. homes to be delivered in St Athan over the Plan period.
It is now the case, however, that the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales – as confirmed in the ‘Today, Tomorrow, Together: A vision for rail across Wales and Borders’ (February 2026) recently published by Transport For Wales. This paper acknowledges that a new railway station at St Athan would represent a longer term opportunity, and therefore, will not be delivered in the short term / within the Plan period of the emerging Plan. Equally the Council have not provided any evidence to contradict this, and therefore, it is very unlikely that any new train station will be delivered in St Athan over the Plan period. This brings about significant questions regarding the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,263no. homes (36% of the Plan’s new housing allocations) are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
In terms of the expected delivery of the Key Sites in St Athan, it is noted that the trajectory identifies that for the majority of the Plan period, both sites will be delivering 80no. dwellings per annum on each site (equating to 160no units in total). Whilst these are two separate sites, we seriously question the realistic prospects of the significant number of homes being built simultaneously on two sites in proximity to one another – given the considerable logistical issues that would be brought about.
Accordingly, it remains that there are serious questions regarding the suitability and acceptability of the proposed allocations at St Athan, which do not accord with the strategy adopted for the RLDP – to focus housing growth on settlements that are supported by railway stations. Moreover, the scale of development proposed at St Athan is also not considered to be proportionate, with a significant number of homes delivered in a location not served by a railway station.
Rolled forward LDP Sites
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
Table 6: Existing LDP allocations to be carried forward
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current Plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ’soundness’, and risks rendering the Plan unrobust.
Housing Delivery Rate Assumptions
As set out in our previous representations to the Housing Trajectory consultation, we have considerable concerns in relation to the proposed delivery of the sites identified in the trajectory – which we do not consider are robust or reasonable.
Appendix 1 of the Deposit Plan sets out the development trajectory bar chart – which illustrates the proposed delivery of housing, on a per annum basis, over the Plan period.
Extract of Housing Trajectory (annotated by GJP - red dotted line)
It is our view that the trajectory makes for an unrealistic and unrobust delivery rate of housing, which does not reflect the pattern of housing completions in the Vale of Glamorgan. We therefore have concerns regarding the soundness of the trajectory, not least that there remain significant uncertainties as to the delivery of the Key Sites (as discussed earlier in these representations).
Firstly, the graph / trajectory illustrates a large ‘spike’ in terms of housing delivery in the year 2027-28, which is considered to be a marked and pronounced step change in the rate of delivery. This envisages / relies on a significantly higher rate of delivery than previous years in the Vale of Glamorgan (2021 through 2021 – as depicted by the green columns). It is considered that this level of delivery is unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions from 2021 - 2025 has been approx. 400 - 500 units, however, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100% relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
It is also the case that the anticipated delivery of housing fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2025.
Accordingly, we consider that the housing trajectory, as proposed, is entirely manufactured and unreflective of the past completion rates, as well as the recent published completion rates provided by Welsh Government recently in August 2025. As set out in our previous representations, it has been evidenced that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1: ‘New House Building: April 2024 to March 2025’
As identified in the graph above, in 2024-25, 4,631 new dwellings were completed, which represents 3% fewer than the previous year. This figure represented the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed) The New Housing Pipeline Report Quarter 3, 2025 Report (December 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 7% during the third quarter of 2025, extending the decline seen during the first half of the year. At 45,075, the number of units approved was 34% down on the third quarter of 2024 and the lowest quarterly total since 2012 Q2. At 146,798, the overall number of units approved during the first nine months of 2025 was 25% lower than a year ago.
HBF Graph Illustrating Residential Approvals (2006-2025)
The above graph clearly shows a pronounced downward trend in the number of residential planning approvals over the period, particuarly with a sharp decrease seen since 2020. Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
More recently, the Welsh Government has released its new estimates of housing need (Estimates of Additional Hosing Need: 2025-based – February 2026). The estimates show how many new homes need to be built over the next twenty years to address existing unmet need as well as newly arising need. The figures set out that around 8,700no. new homes a year are needed over the next Senedd term up to 2030 to meet new housing need. Additionally, there is an unmet need for 9,400 affordable homes.
Overall, this represents more than double 2024/25 levels of supply, where just 4,638 new homes were built.
HBF: Estimates of Housing Need
HBF: Actual Delivery vs Estimates of Need
The above graphs unequivocally evidence that historical rates of delivery of housing in Wales has remained low, and moreover, significant numbers of housing need to be allocated in order to meet the estimate of need. It is not considered that the housing trajectory, in its current form, is robust to meet the housing need over the Plan period, given the uncertainties of the Key Sites, and the level of housing delivery that has been identified for the Plan.
Affordable Housing-Led Sites
HG4 - Rural Affordable Housing Led Sites
Policy HG4 of the Deposit Plan identifies four sites to be allocated as affordable housing-led sites, totalling approximately 122 dwellings within the plan period. Given the target levels of achieving 3,070 affordable dwellings over the course of the Plan period (up to 2036), it is not considered that this policy goes far enough to address the target and level of affordable housing need.
It is noted that the number of units identified for each site relate to the ‘total’ number of units delivered, as opposed to the affordable housing provision. Accordingly, it can be assumed that circa 50% of each allocation will comprise affordable units (given each site is affordable-led), which would equate to a total provision of circa 61no. units. The contribution from the affordable housing-led sites would only equate to 2% of the total need (3,070no. units). Even when coupled with the affordable housing provision from open market sites and 100% exception sites, the total delivery of affordable housing will still be nowhere near enough to meet the overall affordable housing need over the Plan period. Accordingly, it is considered that inadequate provision has been made for such sites.
Insofar as to the sites chosen and allocated are concerned, it is clear from reviewing the Stage 1 and Stage 2 Candidate Site Assessment that the allocated sites HG4(1) – (4) were not considered acceptable due to being outside the strategic growth areas, and were considered to be unacceptable intrusions into the open countryside. After being resubmitted as affordable housing-led sites, the sites were allocated, some with a smaller area in order to accommodate less dwellings in total.
The sustainable credentials of the sites allocated is not disputed, and it is acknowledged that these minor rural settlements have the ability to accommodate further growth, in the form of affordable-led housing allocations. However, it is considered that Land at Ystradowen (Site ID: 430 / 4060) should also form an allocation as part of this policy, given its high sustainability credentials and its appropriate location to accommodate a suitable level of development. Please refer to the previous representations made to the Housing Trajectory Consultation (dated 17th October) and Annex 2 for further, more detailed comments regarding the above sites.
The LHMA 2023 shows that there is a need for 230 affordable homes in the Cowbridge housing market area / ward - which Ystradowen is located within. As such, there is an identified need for affordable housing in this area, something which the site could address through an allocation – see Annex 2.
Securing further delivery of Affordable Units
As set out above, the affordable housing-led allocated sites only provide 122no. affordable dwellings, which comprise 4no. allocated sites that are expected to deliver approximately between 20 – 50 dwellings. However, the RLDP sets a target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4% of the target provision and will only make provision for 2% of the targeted number. We would therefore object to the sites included within Policy HG4 and would suggest that more sites should be allocated as part of the policy in order to secure delivery of a higher number of affordable housing units to mere the target.
Whilst it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, as set out above in these representations, there is serious concern regarding the deliverability of these sites, which would result in a significant gap of affordable housing delivered.
A greater number of affordable housing-led sites allocated would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in affordable housing need being unmet, with demand continuing to outstrip supply.
Previous representations to the Preferred Strategy (dated 14th February 2024) provided comment on the sustainability scoring of Ystradowen and the proposed site. As outlined within these representations, it is considered that the site (ID 430) represents a sustainable, deliverable and acceptable site. The site is located within 2.7 miles Cowbridge and
2.8 miles of Pontyclun. Due to the availability of frequent bus services, and active travel links, key services are readily available to access for any residents within Ystradowen without the need to travel by car. The site is within a maximum 9- and 14-minute bus journey (respectively) of the following key services:
• Cowbridge and ‘Y Pant’ Comprehensive Schools;
• Cowbridge Health Centre and Old School Surgery; and
• Cowbridge Town Centre, and Talbot Green / Pontyclun / Llantrisant (Strategic Growth Area), for various Retail Services.
Accordingly, the settlement of Ystradowen represents an acceptable location to allocate an affordable housing-led site, given the access to existing services and facilities that would serve future residents of the site.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of Ystradowen, support the surrounding settlements, and the Plan area as a whole. As such, the site should be considered further.
Comments on Specific Policies
HG5 - Affordable Housing Exception Sites
Given the unmet need and extant backlog of affordable housing, as identified within the LHMA (2023), it is noted that an Affordable Housing Exception Sites policy has been adopted in order to assist in the delivery of affordable housing. Policy HG5 sets out the specific criteria where proposals for 100% small scale affordable housing developments will be permitted outside settlement boundaries. The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
That said, it is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands. Therefore, the proposed amendments to Para 6.140 are outlined below in red:
6.140 “For the purposes of this policy, ‘small-scale’ will generally mean no more than around 10 dwellings on sites adjoining Minor Rural Settlements. In Primary Settlements outside the Strategic Growth Area, proposals for more than 10 dwellings may be acceptable where required to meet a specific need and where the number of dwellings is proportionate to the size of the settlement. In assessing the scale and extent of any proposed local needs housing, consideration should also be given to affordable housing already planned in the ward or nearby area, including sites with existing planning permissions and those allocated in the RLDP. The size and type of affordable housing proposed should reflect the identified local need in the area.”
The above suggested wording would achieve a more flexible policy, which would allow for a variety of scaled applications to secure planning permission for solely 100% affordable housing across the Authority area. This greater flexibility would enable the policy to make a significant contribution towards meeting the affordable housing need – which, as set out earlier is in considerable need.
SECTION 3. Suitability of the site for development
The site promoter objects to the overall assessment of the site, in that it is not considered suitable for further development in the Plan. The promoted site has undergone extensive scrutiny and appraisal at a high level to ascertain the qualities of the site, in light of all identified material considerations which relate to the proposals.
The delivery of the site will yield much needed housing (including Affordable housing) and contribute to the overall supply in the new Plan period, whilst making effective use of a suitably located site for residential development.
Moreover, as set out in ‘Annex 2’ of our representations, the site has overcome the ‘constraints’ set out in the Candidate Site Assessment undertaken for the site, which demonstrates that the proposal is both acceptable and deliverable.
Deliverability of the Site
In summary, the site seeks to deliver the following key elements:
• Provision of circa 67 new-build residential dwellings (including 50% affordable housing provision);
• A mix of house-types and tenures across the site to cater for a variety of needs;
• Creation of a new primary access into the site;
• Connection to pedestrian links within the wider area;
• Public open space; and
• Green Infrastructure; and
SUMMARY AND CONCLUSIONS
In summary, the site promoters:
• Object to the distribution of growth proposed for the Plan area, with a more balanced and equitable distribution of housing sites required in order to meet the identified housing need;
• Object to the level of growth identified for the Plan period;
• Object to the housing trajectory that underpins the delivery of housing within the Plan period – which is considered to be unrealistic and unrobust, leading to serious uncertainty regarding the “soundness” of the Plan;
• Object to the over-reliance on Key Sites and Rolled Forward Sites in making up the Plan’s housing land supply;
• Object to the scale and timing of delivery of sites in / around St Athan – all of which are predicated on railway station provision which will not be realised in the Plan period;
• Object to the under-provision of sites under Policy HG4 – Rural Affordable Housing-Led sites, not least given their extremely limited contribution to the targeted need for affordable housing;
• Object to the current wording of the HG5 Policy ‘Affordable Housing Exception Sites’ which requires greater flexibility to play an important role in delivery much-needed affordable homes across the Authority; and
• Object the Council’s assessment that the site is not considered suitable for development.
The site and proposals are consistent with the RLDP strategy, other Vale of Glamorgan strategies, and the requirements of Planning Policy Wales and Future Wales. It will make a significant contribution to the Vale’s identified housing requirement in the RLDP period and will provide for a wide range of uses that will support the wider community whilst embodying principles relating to placemaking and the well-being of future generations.
The site has no fundamental constraints and has the ability to deliver significant economic, social and environmental benefits for the benefit of future residents and the existing local community. The site is demonstrated to be viable, being able to deliver policy-compliant levels of affordable housing and given its location within a strong market area, will benefit from high delivery rates.
ANNEX 2
SECTION 4. A summary of the suitability of the site for development including a Response to the Candidate Site Assessment
Land at Ystradowen (Site ID: 4060)
This section of the overall representations to the Deposit Plan is to respond to, and address, the Council’s assessment of the site. The ‘Candidate Sites Assessment Deposit Plan Stage v2’ for ‘Land at Ystradowen (Site ID: 4060)’ sets out that the position of the site at the Deposit Stage is as follows:
“Amendment of proposed use from housing to affordable housing led. Previous site reference 430. The original assessment concluded that whilst the site was adjoining the existing LDP settlement boundary this is by virtue of an existing adopted plan LDP allocation this is currently under review. Notwithstanding this the site would represent unacceptable intrusion in to the open countryside.
The LDP site in question has subsequently been granted planning permission for housing. This site will serve the future needs of residents in the area and it is not considered that additional land should be allocated in this location.”
In terms of the first paragraph, the assessment/conclusion implies and suggests that ‘Land at Ystradowen’ (4060)’ does not adjoin the existing LDP settlement boundary as the allocated site (‘Land off Sandy Lane, Ystradowen’) has not been built out – “by virtue of an existing adopted plan LDP allocation this is currently under review”. Detailed representations have been made and submitted previously at the Housing Trajectory (see Appendix B& C) that outlines that this is fundamentally incorrect. This is not repeated in full here, with just the main points re-iterated.
First and foremost, ‘Land at Ystradowen (4060)’ directly adjoins the existing LDP settlement boundary. Secondly, there has been a significant change in the position and circumstances. The allocated site (‘Land off Sandy Lane, Ystradowen’) is currently being “built out”, with work commencing on site (see photographic evidence in Appendix C)
- post the implementation of the planning permission ref. 2023/00948/FUL (post approval on 9th December 2024). Accordingly, the site no longer adjoins “the existing LDP settlement boundary … by virtue of an existing adopted plan LDP allocation … currently under review”. Given this, the ‘Land at Ystradowen’ site boundary therefore directly adjoins/is adjoining the LDP settlement boundary and the site promoted herein.
With regards to the second paragraph, the assessment/conclusion outlines that “The LDP site … will serve the future needs of residents in the area and it is not considered that additional land should be allocated in this location”. The arguments and case presented in Appendix B & C. There is a clear overreliance on ‘rolled forward’ sites / existing allocated sites. A total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%). We believe that a greater level of growth is achievable and should be considered. Not least as there is an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings). As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy. Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. The provision of housing should be adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply. The “future needs of residents in the area” will therefore not be met/served by just this site, and it is considered that additional land should be allocated in this location.
Furthermore, to reinforce, illustrate, and evidence the point in specific reference to the site the subject to this representation (located in Ystradowen), reference is made to application ref. 2013/00856/OUT – ‘Land off Badgers Brook Rise, Ystradowen’. The Final Report of the application states that “Ystradowen is considered a sustainable settlement for further housing development” – i.e. “additional land should be allocated in this location”.
While the issues the Council have raised in their assessment of the site have been addressed and discussed within the representations made at the Preferred Strategy stage of the Plan (see Appendix B), a similar ‘scoring’ exercise has been undertaken as part evidence base for the Deposit Plan. As such, it is still pertinent to consider and respond to the Council’s assessment of the site as part of these representations. A comparison between the site assessments undertaken at both the Preferred Strategy stage and Deposit Plan stage can be seen below for reference:
BP18 Candidate Ste Assessment at Preferred Strategy Stage
As demonstrated above, there has been a positive change to the scoring attributed to the site (‘Land at Ystradowen’). The change is a positive change to the ‘Infrastructure Availability’ section changing from: ‘Grey’ (no score) to ‘Amber’. Infrastructure Availability is outlined as: “Existing or proposed services would be suitable subject to local improvements without impacting on development viability and/or delivery timescales” (see below):
The explanation for the scoring provided by the Vale sets out that “Sites will be assessed against the availability of water connections to the site, in addition to the method of foul sewage disposal from the site. Consultation shall be undertaken with DCWW to determine whether there is sufficient capacity to the wastewater treatments works, and how it links into DCWW’s Capital Investment Programme.
Where consultation indicates limited capacity, or the site is located away from a viable connection this may impact on the deliverability/viability of a site should this require significant connection costs or upgrades. Consequently, the Council shall require site proposers to undertake detailed site viability assessment to determine the impact that additional cost shall have on development cost and deliverability timescales.”
As set out above, this is a positive change. This is most likely derived from the allocated site (‘Land off Sandy Lane, Ystradowen’) currently being “built out”, with work commencing on site that would facilitate and improve the ‘Infrastructure Availability’. This re-iterates the point made previously re the incorrect assessment reached, and the ever changing position of this site – which will only improve given the neighbouring allocated site (‘Land off Sandy Lane, Ystradowen’) being “built out”.
Land West of Maendy Road, Aberthin (Site ID: 2299)
There are material similarities between ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ and the site the subject of these representations. It is therefore considered pertinent to assess and compare the suitability of ‘Land West of Maendy Road, Aberthin’. Not least as ‘Land at Ystradowen (Site ID: 4060)’ is for a “small-scale affordable housing led development in a minor rural settlement”, within “the ward of Cowbridge”.
The site ‘Land West of Maendy Road (Site ID: 2299)’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however from our review of the evidence base submitted as part of the Housing Trajectory consultation, there was no assessment and critique of this site at this stage. This raises questions regarding the “soundness” of this site, given it appears this sites acceptability and inclusion was pre-determined.
The site (‘Land West of Maendy Road’) has since had a detailed assessment and critique published, however concerns still remain regarding the “soundness” of the site which forms part of the intended housing land supply. The ‘Stage 2 Detailed Site Assessment’ summary undertaken for ‘Land West of Maendy Road’ has been extracted below:
“The site is proposed for a small-scale affordable housing led development in a minor rural settlement, which would accord in principle with the strategy. Aberthin itself has limited services and facilities, but is within reasonable walking distance of primary and secondary school provision with the wider range of services and facilities in Cowbridge just over 2000m away. The settlement is also served by public transport, although this is relatively infrequent.
The 2023 LHMA indicated that the ward of Cowbridge has a need for 230 additional affordable units over the next 15 years and this site could make an important contribution in meeting that.”
As mentioned previously, there are material similarities between ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ and ‘Land at Ystradowen (Site ID: 4060)’ (the subject of these representations). Firstly ‘Land at Ystradowen (Site ID: 4060)’ is also for a “small-scale affordable housing led development”, that is “in a minor rural settlement” (Ystradowen). Accordingly, it should follow that as ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ “would accord in principle with the strategy”, ‘Land at Ystradowen (Site ID: 4060)’ would also “accord in principle with the strategy”.
Furthermore, there is no material difference between the following assessment of Aberthin and Ystradowen:
“Aberthin itself has limited services and facilities, but is within reasonable walking distance of primary and secondary school provision with the wider range of services and facilities in Cowbridge just over 2000m away. The settlement is also served by public transport, although this is relatively infrequent.”
There is no material difference between ‘Land West of Maendy Road’ and ‘Land at Ystradowen’ in sustainability terms.
As set out in our representations to the Preferred Strategy, we reviewed the key services in proximity to the site. The following services were identified as part of that review:
• In terms of public transport, there are two bus stops located approximately 0.2 miles (4-minute walk) from the site (‘Land West of Maendy Road’), with the 321 providing services between Llantwit Major and Talbot Green;
• In terms of public transport, there are two bus stops located approximately 400m (7-minute walk) from the site (‘Ty Mawr Close’), with the ‘321 Nat Group Service’ providing services between Llantwit Major and Talbot Green. The 321 service is the same bus service that serves ‘Land West of Maendy Road’ / Aberthin;
• The site is also located 0.2 miles (4-minute walk) from The Farmers Arms Pub and 0.2 miles (4-minute walk) from The Hare and Hounds Inn; and
• The site is located 0.2 miles (5-minute walk) from Aberthin Village Hall.
Given the above, “The settlement (Ystradowen) is also served by public transport”.
Furthermore, Ystradowen is located only 2.7 miles from Cowbridge (9-minute bus journey). The “primary and secondary school provision with the wider range of services and facilities in Cowbridge” mentioned in relation to Aberthin are therefore also in close proximity to Ystradowen.
Given the above, any candidate site at ’Land at Ystradowen’ (the subject of these representations – Site ID: 430 / 4060) is no less sustainable than the site at Aberthin (Site ID: 2299).
Not least as the following additional key services are located within Ystradowen and therefore in close proximity to the promoted site:
• The site is also located 300m (3-minute walk) and 600m (10-minute walk) from Sports Pitches/Playing Fields such as ‘Ystradowen Children’s Park’, and the 3/4G Sports Pitch at ‘Ystradowen Petanque Club’; and
• Furthermore, the site is located 480m (7-minute walk) from the ‘Murco – Tudor Garage’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
Furthermore it is important to note that the above scoring criteria is very limiting, and does not take into account the important role and proximity of settlements in a wider context. For example, it does not take into account the important role and proximity of the Principal Settlement and Strategic Growth Area (as defined in the RCTCBC LDP) of Talbot Green / Pontyclun / Llantrisant which is 2.8 miles to the north (14-minute bus journey). Ystradowen would also naturally align, and function, in association with this Principal Settlement and Strategic Growth Area (of Talbot Green / Pontyclun / Llantrisant) – see Appendix B for full details.
In addition, as set out within the representations made in relation to the House Trajectory (Appendix C), the following extracts have been taken from the Officer’s Reports associated with the applications for the site that directly adjoins the western boundary of the promoted site 430 - ‘Land off Sandy Lane, Ystradowen’ (Housing Allocation 48). An aerial view extract is outlined below to give spatial context:
As set out above, it is important to note that the Final Report of application ref. 2013/00856/OUT states that “Ystradowen is considered a sustainable settlement for further housing development”, due to “the sustainable nature of the settlement”. Furthermore, the Final Report of app ref. 2023/00948/FUL states:
• “Notwithstanding this, the site is located in close proximity to local services and there is a bus stop located nearby. Whilst the comments relating to the reliance and frequency of the bus services have been considered, there still remains a bus service in the area”; and
• “Firstly, as aforementioned, many neighbouring comments refer to the site as unsustainable and have commented on the suitability of public transport and cycle routes etc. This has been addressed above.”
The above clearly evidences that the location has previously been endorsed as, and is currently still found to be, sustainable.
Accordingly, it can be considered therefore that if the proposed allocated site ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ is considered sustainable and by association suitable to be an Affordable Housing Led Allocation, ‘Land at Ystradowen (Site ID: 430 / 4060)’ is equally suitable to be an Affordable Housing Led Allocation.
The second section/paragraph of the assessment states:
“The 2023 LHMA indicated that the ward of Cowbridge has a need for 230 additional affordable units over the next 15 years and this site could make an important contribution in meeting that.”
‘Land at Ystradowen (Site ID: 4060)’ is also located within “the ward of Cowbridge”. As per the above and outlined by the Authority, there is “a need for 230 additional affordable units over the next 15 years”. It is clear therefore that there is a need for additional affordable units in this ward, and this site would therefore also help to alleviate this need.
This position is a direct contradiction of course of the assessment/conclusion for ‘Land at Ystradowen (Site ID: 4060)’ which stated “it is not considered that additional land should be allocated in this location”. It is clear from the above however that “additional land should be allocated in this location” to satisfy this “need for 230 additional affordable units over the next 15 years” – which ‘Land at Ystradowen (Site ID: 4060)’ can do. This is not least the case given the detailed arguments, case and representations presented and evidenced previously above and in Appendix B & C.
To briefly reiterate there is a clear overreliance on ‘rolled forward’ sites / existing allocated sites which has resulted in the unmet need deriving from the existing LDP being still present. A greater level of provision for new allocations should therefore be applied in order to meet the housing requirement. The provision of housing should be adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply, so these can “make an important contribution in meeting” the “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge” – which ‘Land at Ystradowen (Site ID: 4060)’ can do.
As set out within the representations made in relation to the housing trajectory (see Appendix C), a further key consideration to note and one which does differentiate between the relative merits of the ‘Land at Maendy Road, Aberthin’ and ‘Land at Ystradowen’ is that the LDP Proposals Map demonstrates that ‘Land West of Maendy Road’ is within a Special Landscape Area - see below:
Vale of Glamorgan Proposals Map (Land West of Maendy Road outlined in red
Under Policy MG17 ‘Special Landscape Areas’ it is considered that development in SLA could pose an “unacceptable harm to the important landscape of the area”. Accordingly, this development and proposed allocation could therefore cause “unacceptable harm to the important landscape of the area”.
‘Land at Ystradowen’ by contrast does not sit within a SLA (see below). This site would therefore not pose any potential concern in this respect as it would ultimately not cause any “unacceptable harm to the important landscape of the area”.
Vale of Glamorgan Proposals Map (Land at Ystradowen in red)
It is noted that the detailed assessment scores the site ‘amber’ in respect to Special Landscape Area (refer to / see later section for full details), with the assessment methodology setting out that “the site is located within a Special Landscape Area/The Glamorgan Heritage Coast and the development may result in little or no change in character and little or no significant effect on landscape character and visual amenity.”
A detailed assessment of the impact upon the SLA in respect to the development of ‘Land West of Maendy Road, Aberthin’ should therefore be, and will need to be, undertaken as part of any planning application. If it is found that the site causes “unacceptable harm to the important landscape of the area”, this will lead to this proposed allocation being at risk of not being delivered. This will be as a result of its impacts and acceptability at the planning application stage that the landscape and visual impact of development of the site is unacceptable. As such, these proposed affordable units are at a potential considerable risk of being lost and not satisfying the “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge” – which ‘Land at Ystradowen (Site ID: 4060)’ can do as it is not located in an SLA.
In addition the draft housing trajectory set out that “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is not delivered (as it is located in a SLA), and so a “small scale affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” is not provided for. This is clearly an issue. Given however ‘Land at Ystradowen’ does not sit within a SLA – and so not pose any potential concern or cause any “unacceptable harm to the important landscape of the area” – the allocation of this site would be more suitable and “safer” - as there would be no concerns over this proposed allocation being removed and/or not being delivered in this respect (as it is not located in a SLA). This would ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”, are provided for, and the need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge” would be satisfied.
As mentioned previously, a detailed assessment and critique has now been undertaken of ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ as part evidence base for the Deposit Plan using the similar ‘scoring’ exercise. As such, it is again pertinent to consider and respond to the Council’s ‘scoring’ exercise assessment of the site ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ as part of these representations.
The ‘Summary of Assessment of New Candidate Sites’ table can be seen overleaf for reference:
BP18A Candidate Site Assessment at Deposit Plan Stage
A comparison between the site assessments undertaken for both ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ (on the left), and ‘Land at Ystradowen (Site ID: 4060)’ (on the right) has been undertaken, and can be seen below for reference:
Having undertaken a review of the scoring for both ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ and ‘Land at Ystradowen (Site ID: 4060)’, it is clear that ‘Land at Ystradowen (Site ID: 4060)’ scores higher/more positively (i.e. green) than ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’:
• ‘Land at Ystradowen (Site ID: 4060)’: 17/33 criteria are scored green = 52%
• ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’: 12/34 criteria are scored green = 36%
It is clear therefore given the above that ‘Land at Ystradowen (Site ID: 4060)’ is a better site, and should be allocated accordingly.
One key example to note is how the criterion ‘Access to Services and Facilities’ has been scored. For ‘Land at Ystradowen (Site ID: 4060)’ this has been scored green, yet for ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, this has been scored red. Given this, this corroborates the position outlined previously above that, if the proposed allocated site ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ is considered sustainable and by association suitable to be an Affordable Housing Led Allocation, ‘Land at Ystradowen (Site ID: 430 / 4060)’ is equally as sustainable – in fact considered more suitable (given its higher scoring in this respect).
Furthermore, we question the “soundness” of the assessment of ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, given that 7/34 (21%) of the criteria do not appears to have not been assessed – i.e. 7/34 (21%) of the criteria are scored grey. This raises questions regarding the “soundness” of this site, given it appears this sites acceptability and inclusion was pre-determined.
It is clear therefore that if ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’ has been deemed acceptable for allocation, yet ‘Land at Ystradowen (Site ID: 4060)’ scores higher/more positively (i.e. green) than this site, ‘Land at Ystradowen (Site ID: 4060)’ should also be deemed acceptable and be allocated. Not least as the site is “proposed for a small-scale affordable housing led development in a minor rural settlement … would accord in principle with the strategy”, and “could make an important contribution in meeting “a “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge”.
Summary and Conclusion
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Deposit Plan published as part of the consultation.
In terms of SECTION 4, and a response to the Candidate Site Assessment at Deposit Plan Stage, the following key points have been made:
• The Council’s ‘Stage 2 Detailed Site Assessment’ justification for ‘Land at Ystradowen (Site ID: 4060)’ is fundamentally incorrect;
• Given the material positive similarities between ‘Land at Ystradowen (Site ID: 4060)’ and ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, which has been deemed acceptable and allocated, ‘Land at Ystradowen (Site ID: 4060)’ should also be deemed acceptable and allocated accordingly;
• ‘Land at Ystradowen (Site ID: 4060)’ would help to alleviate and satisfy “a need for 230 additional affordable units over the next 15 years” within “the ward of Cowbridge”; and
• ‘Land at Ystradowen (Site ID: 4060)’ scores higher/more positively (i.e. green) than ‘Land West of Maendy Road, Aberthin (Site ID: 2299)’, and so should also be deemed acceptable and be allocated;
Ultimately, ‘Land at Ystradowen (Site ID: 4060)’ is “proposed for a small-scale affordable housing led development in a minor rural settlement”, and as such “would accord in principle with the strategy”. It would therefore “make an important contribution in meeting“ the “need for 230 additional affordable units over the next 15 years” in “the ward of Cowbridge”.
We would therefore object the Council’s assessment that the site is not considered suitable for development.
Summary of These Representations
In short, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised below in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Preface
This Submission sets out the detailed case in support of these representations. The representations are structured as follows:
1. Procedural Consultation Matters;
2. Timing Assumptions underpinning the Trajectory;
3. Housing Delivery Rate Assumptions;;
4. Status & Standing of Sites included in the Trajectory;
5. Key Sites;
6. St Athan Train Station;
7. Geographic distribution of the ‘new’ sites / provision;
8. Detailed comments in respect to ‘new’ sites;
9. Credentials of this site subject to this submission; and
10. Conclusions Procedural Consultation Matters
Firstly, we do not consider that the consultation on the Housing Trajectory information has been procedurally undertaken appropriately or suitably.
Only 14 days have been afforded to parties to make representations on the information provided. This is despite new sites being introduced (at this late stage) i.e. Land South of Clive Road (identified in Table 4), as well as a number of affordable housing-led housing sites being introduced (i.e. those outlined in Table 5). This does not provide an adequate process or timescale for objectors to scrutinise the published content, and to make comments on sites which have been presented for the first time at a late stage in the process.
As part of these representations, we will be making brief comment on the sites which have not been previously consulted upon, namely:
Other Housing Allocations
• Land south of Clive Road, St Athan;
Affordable Housing Led Sites
• Land at Heol Fain, Wick;
• Land west of Maendy Road, Aberthin;
• Land Noth of West Winds Business Park, Fferm Goch; and
• Land to the east of Coliwinston, Colwinston.
It is considered necessary to comment on these sites, given that they form an important and critical part of the housing trajectory, and by association in the Council and Plan reaching their targets. Moreover, these sites have not been consulted on previously. Accordingly we consider it necessary to pass comment on these in order to ensure that the consultation is fair and robust.
As well as limited time given to comment on the information contained within the Housing Trajectory, the LPA have failed to set up a Housing Stakeholder group to agree and discuss the trajectory information and data – with the cover email to the consultation (dated 3rd October 2025) stating “it is considered that it would be the best use of stakeholder time to conduct this engagement via email, particularly as many of the forecasts have been developed in consultation with site promoters including developers and their agents”.
We submit that the stakeholder consultation has not been a transparent nor robust consultation process, given that the Development Plans Manual states at Para 5.66 “A housing trajectory must be prepared to support the Deposit Plan. In order to generate a housing trajectory and associated phasing tables it will be necessary for LPAs to engage with stakeholders through a Housing Stakeholder Group. This will ensure that the timing and phasing of sites is robust and based on up to date information”. Given that this has not taken place, we would raise fundamental concerns that the consultation of the trajectory has not adequately taken place as per the relevant guidance. Afterall, the guidance stresses that a Group should be formed as a necessity. Accordingly, there has not been an adequate process and opportunity to review and comment on the information published, including in respect to the other sites have been introduced at this late stage.
Timing Assumptions underpinning the Trajectory
The assumed and factored in timescales of the various stages of bringing forward sites i.e. the pre-application stage, the planning application process, and the discharge of condition process outlined in the trajectory are considered to be fundamentally inaccurate, and result in a distorted position of the delivery of housing sites over the RLDP Plan period. The assumptions are far too ambitious, and without evidence / are not comparable with the timescales being incurred in processing such stages at the Development Management stage(s).
Specifically, we raise objection to the following timescales which are considered to be extremely ambitious and unrealistic:
• “Time period of pre-application discussions/PAC consultation” = 4 months
• “Time between submission of planning application and determination” = 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” = 4 months
In our experience, having submitted a significant number of major and other applications for housing and other forms of development in the last 1-2 years to the Council (and elsewhere in Wales and England), it is extremely unlikely that major applications can be submitted, and planning permissions granted, within the timeframes assumed by the trajectory. A wide range of stakeholders are also involved in the determination of major planning applications, which often adds to the delays associated with the determination of such applications. We would therefore consider that a time period of “6 months” given to all major applications in the housing trajectory is not feasible, and distorts the trajectory timescales for the remaining Plan period.
The assumptions in the trajectory are also solely based on expected timescales for the processing of formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission (i.e. pre-application enquiry submissions / planning application / discharge of condition details etc). When factored in these will elongate the timescales for bringing forward schemes considerably.
Moreover, it is common practice for larger housing sites and major applications to have a range of pre-commencement conditions attached to a permission once granted. Again, we would raise concerns with the timescales indicated in the trajectory related to this part of the planning process. It is highly unusual and questionable that any technical work required by these conditions (usually relating to drainage and highways matters) would be instructed, completed and submitted within 2 months, and for these to then be signed off / approved in a further 2 months. There are also other technical matters and necessary approvals falling outside of, and over and above, the planning system, such as SAB, s.106, s.38 and s.278 agreements, timescales for which have not been accounted for – and all of which are rarely completed within “4 months” as indicated.
It is therefore highly doubtful that the timescales legislated for in the trajectory for the various stages pre-construction are achievable – with no information about these proposed timescales outlined within the supporting text of the Housing Trajectory. We would therefore raise considerable concerns and objections to these as they stand without full evidence to fully show how these have been calculated, and without there being considerable (and necessary) adjustment to the timescales indicated and factored in.
We would therefore object to the timescales indicted in the ‘Timing and Phasing of Sites’ table, given that the delivery start dates will be pushed back further into the Plan period. Accordingly, and as a result, the Plan is at risk of not delivering the level of housing expected based on the sites allocated, at least as swiftly as is set out in the trajectory.
Housing Delivery Rate Assumptions
We would also raise considerable doubt over the proposed delivery of the sites identified in the Housing Trajectory - which we do not consider are robust or reasonable.
The development trajectory bar chart set out in the consultation material (extracted below) anticipates and legislates for a number of critical events and circumstances – all of which are considered to be unrobust and unsound.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
Firstly, a large ‘spike’ (material increase) in housing delivery is factored in to take place in 2027 – 2028. This is a marked and pronounced step change in the rate of delivery, and envisages / relies on a significantly higher rate of delivery than previous years in The Vale of Glamorgan (2021 through 2025 - as depicted by the green columns). This is considered extremely unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions in The Vale of Glamorgan from 2021 - 2025 has been approx. 400 - 500 units. However, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100%relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
The anticipated delivery of housing also fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2015.
To summarise, we consider the defined position to be wholly manufactured and unreflective of the past completion rates, as well as the recently published completion rates provided by Welsh Government recently in August 2025. In the Welsh Government Statistics Document ‘’New House Building: April 2024 to March 2025’, information on the number of new dwellings started is provided, where building has commenced and those completed for April 2024 to March 2025. Figure 1 provides a graph showing starts in the last 10 years, and it is clear that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1:.‘New House Building: April 2024 to March 2025’
In 2024-25, 4,631 new dwellings were completed, 3% fewer than in the previous year. This was the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed). The New Housing Pipeline Report Quarter 2, 2025 Report (September, 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 6% during the second quarter of 2025, continuing the decline of approval during the first three months of the year. Wales saw one of the largest declines in the UK in approvals with a decline of 29%.
Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
The Home Building Sector Skills Plan (Aug 2025) published by the HBF also identified the following issues with the workforce to bring forward built development in Wales:
• “A shortfall in numbers entering roles from the education system;
• An ageing workforce: 25% of the home building workforce is aged over 50, meaning the sector is facing an impending retirement cliff edge;
• Challenges attracting a wider talent pipeline into the sector;
• A lack of understanding of critical future skills needed, and direction from the Future Homes Standard; and
• Output within the sector fluctuating with demand and economic pressures, leading to additional pressures in recruitment and training”.
It is not considered that in the next 1-2 years that any of these issues can or will be substantially corrected – at least sufficiently so to allow for, and enable, the planned delivery rates of new housing completions to be as high as < > 1,000 homes in one year (and for four consecutive years at that).
We would therefore object to the proposed numbers of completion expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated.
Status & Standing of Sites included in the Trajectory
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
Table 6: Existing LDP allocations to be carried forward
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ‘’soundness’’, and risks rendering the Plan unrobust.
On this basis, we would object to the Plan if the provision of housing is not adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply.
Key Sites
As set out in previous representations at Preferred Strategy stage, it is considered that the housing supply relies heavily on the delivery of the ‘key sites’ to deliver housing (and meet need) over the Plan period. The total number of housing units attributed to key sites amounts to 2,278, which equates to over 25% of the total provision in the Plan period.
As detailed above, we consider there to be concerns regarding the proposed ‘Timing and Phasing of Sites’ table included in the Housing Trajectory which we consider are not reflective or accurate and will therefore have the effect of delivery start dates being much later into the Plan period than anticipated. The result of this will be that the Plan will be at risk of not delivery the level of housing expected and needed. Moreover, the Housing Trajectory Graph presents an overly ambitious level of housing completions over the Plan period - which the Council consider will be markedly higher than the average levels experienced in the last five years. Again, for the reasons set out above, we consider that these rates of expected completions to have no evidence supporting them, and to be unachievable and unsound.
Insofar as to the removal of the previously proposed site ‘Land at North East Barry’, this site was expected to deliver 900no. units in the Plan period. Following its omission from the housing supply, other sites have been identified, which comprises the inclusion of a new key site (Land at North West Barry), 3no. non-strategic sites, and also affordable housing-led allocations. In terms of the quantum of development attributed to these new sites, this amounts to 659no. dwellings. This is some 250 units less than the 900no. homes that was previously attributed to ‘Land at North East Barry’. Whilst it is appreciated that the number of homes forming part of the existing supply (completions, units with planning permission etc.) have increased since Preferred Strategy stage, there will be a net loss in market housing provision and delivery.
This position is made worse and compounded as a result of accounting for the affordable-led sites in making up the housing supply.
As set out within the Preferred Strategy, these sites are expected to deliver at least 51% affordable housing. These units are not open market units, and will not / cannot contribute to the supply of such housing. These units will contribute to the provision of affordable housing, and will go some way to meeting the acute need for such housing (albeit will not eradicate / address in full the well known and accepted considerable requirement). Accordingly it is considered that these sites should be in addition to the housing supply, as opposed to forming part of the provision. In turn, there would need to be an increase in allocations for non-strategic sites, to ensure that there is sufficient market housing delivery over the Plan period.
Were such changes to be made and introduced, this would achieve and assist realise a more robust and sound housing supply, which will ensure that the identified housing need is met / addressed over the Plan period. Without these changes it is considered that the housing supply is not sufficient, and inevitably, housing need will not be met within the Plan.
St Athan Train Station
As set out in the Preferred Strategy (para A3.29), the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,183no. homes to be delivered in St Athan over the Plan period.
It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales. The focus in the first phase of such improvements across the region is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that these sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,183no. homes are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
We therefore consider the Trajectory to be both unrobust and unsound, and therefore, we object to the Trajectory in its current form accordingly.
Geographic distribution of the ‘new’ sites / provision
As a general and overarching comment in respect to the additional sites now included within the Plan, and forming part of the trajectory, (and a matter expanded upon when critiquing each of these sites in the next section to this submission), it is clear and evident that these additional sites have been positioned to settlements that have already, and recently, been attributed significant growth in the preceding Plan and plan period.
Significant allocations (which have also contributed to significant levels of affordable housing) have been realised and built out in locations such as Wick and Colwinston). Notwithstanding this, two of the additional sites are now proposed for these recently expanded settlements. Given that the purpose of the affordable housing led allocations is to meet unmet affordable housing need, it is questioned why such new allocations are attributed to settlements that have already seen open market and affordable housing provision, as compared to other comparable settlements that have not received any growth whatsoever over a considerable period of time.
It is considered accordingly that the geographic positioning of these allocations is at odds with their underlying purpose - to meet unmet affordable housing need in communities that have seen no provision.
Detailed Comments in respect to ‘new’ sites
Other Housing Allocations
Land south of Clive Road, St Athan
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
As set out at the outset of these representations, and whilst we note the findings of the Candidate Sites Assessment at Preferred Strategy Stage (i.e. Suitable for further consideration), we do not consider that the consultation on this site has been undertaken procedurally appropriately or suitably. We therefore consider the consultation on this site is “unrobust” and “unsound”.
As set out previously, the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales, where the focus is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision, and as such, to add a further site for housing over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites – given their incompatibility with the core strategy of the RLDP.
Affordable Housing Led Allocations
Land at Heol Fain, Wick
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
Candidate Site Stage 2 Assessment (Site Ref. 404)
The findings of the Candidate Site Assessment for this site are noted. We are assuming the reason this site is proposed to be allocated is a product of the site promoters/developers heading the findings stated below, and changing the form of development to be in accord with this:
“A market housing led scheme would not be acceptable, but the site could be reconsidered as a small scale affordable housing led development subject to need and viability at a maximum of 50 dwellings. In accordance with the Settlement Appraisal Review, it is considered that Wick could potentially accommodate limited affordable housing led growth.”
Whilst no clearly evident deficiency exists in respect to the site, it is known that Wick has been subject to significant growth and expansion in recent years – not least by virtue of significant housing allocations in the settlement as part of previous plans.
To evidence this, 35% of the 124 units approved on the ‘Rectory Field, St Brides Road’ site (i.e. circa 43 units as per site allocation ref. MG(47) and PP ref. 2014/01424/FUL) were approved as Affordable Housing units. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Wick, further provision ought to be made in comparable (previously unprovided for) locations, such as Ystradowen.
Land West of Maendy Road, Aberthin
‘Land West of Maendy Road’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however as far as we know from our review, there is no assessment and critique of this site. This site has not been included in the ‘Candidate Assessment at Preferred Strategy Stage’ (October 2023). As such, with an absence of publicly available information, it is not clear how the Council has judged this site against the criteria. This raises questions accordingly in respect to the “soundness” of a site which forms part of the intended housing land supply, and by association the trajectory. Without this, and without being consulted on (as others have been prior to this) we question whether this allocation is “sound” (i.e. its allocation is considered to be “unsound”).
Despite the absence of site-specific assessment criteria, as the RLDP preferred strategy states a key objective guiding site selection is that the Plan will “provide for vital and vibrant rural communities whilst protecting the countryside through the delivery of growth in sustainable locations related to the settlement hierarchy alongside the provision of supporting infrastructure” (Objective 7 ‘Fostering Diverse Vibrant and Connected Communities’), it is reasonable to assume that the Council considers ‘Land West of Maendy Road’ to be a ‘sustainable’ location.
Given this, we have reviewed the key services in proximity to the site. The following services were identified:
• In terms of public transport, there are two bus stops located approximately 0.2 miles (4-minute walk) from the site (‘Land West of Maendy Road’), with the 321 providing services between Llantwit Major and Talbot Green.
• The site is also located 0.2 miles (4-minute walk) from The Farmers Arms Pub and 0.2 miles (4-minute walk) from The Hare and Hounds Inn.
• The site is located 0.2 miles (5-minute walk) from Aberthin Village Hall.
Aberthin is in close proximity (1.2 miles/14-minute walk) to the key settlement of Cowbridge - which is identified as a sustainable location, and is ranked 4th place for services and facilities within the Vale of Glamorgan. The following key services are found in Cowbridge, and are therefore in close proximity to ‘Land West of Maendy Road’:
• Cowbridge Comprehensive Schools;
• Cowbridge Health Centre; and
• Cowbridge Town Centre for various Retail Services.
Considering this, there is no material difference between ‘Land West of Maendy Road’ and ‘Land at Ystradowen’ in sustainability terms. Given that Ystradowen is located only 2.7 miles from Cowbridge (9- minute bus journey), the candidate site at ’Land at Ystradowen’ is no less sustainable than the site at Aberthin. The following key services are within Ystradowen and therefore in close proximity to the promoted site:
• In terms of public transport, there are two bus stops located approximately 400m (7-minute walk) from the site (‘Ty Mawr Close’), with the ‘321 Nat Group Service’ providing services between Llantwit Major and Talbot Green. The 321 service is the same bus service that serves ‘Land West of Maendy Road’ / Aberthin.
• The site is also located 300m (3-minute walk) and 600m (10-minute walk) from Sports Pitches/Playing Fields such as ‘Ystradowen Children’s Park’, and the 3/4G Sports Pitch at ‘Ystradowen Petanque Club’.
• Furthermore, the site is located 480m (7-minute walk) from the ‘Murco – Tudor Garage’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
Accordingly, it can be considered therefore that if the proposed allocated site ‘Land West of Maendy Road, Aberthin’ is considered sustainable and by association suitable to be an Affordable Housing Led Allocation, ‘Land at Ystradowen’ is equally suitable to be an Affordable Housing Led Allocation.
Furthermore, to reinforce the above position and to illustrate and evidence the site’s sustainability, the following has been taken from the Officer’s Reports associated with the applications for the site that directly adjoins the western boundary of the promoted site 430 - ‘Land off Sandy Lane, Ystradowen’ (Housing Allocation 48). An aerial view extract is outlined below to give spatial context:
Reference is made in the Final Report of app ref. 2013/00856/OUT which states that “Ystradowen is considered a sustainable settlement for further housing development”, due to “the sustainable nature of the settlement”.
Furthermore, the Final Report of app ref. 2023/00948/FUL states:
• “Notwithstanding this, the site is located in close proximity to local services and there is a bus stop located nearby. Whilst the comments relating to the reliance and frequency of the bus services have been considered, there still remains a bus service in the area.”
• “Firstly, as aforementioned, many neighbouring comments refer to the site as unsustainable and have commented on the suitability of public transport and cycle routes etc. This has been addressed above.”
The above clearly evidences that the location has previously been endorsed as, and is currently still found to be, sustainable.
A further key consideration to note and one which does differentiate between the relative merits of the ‘Land at Maendy Road, Aberthin’ and ‘Land at Ystradowen’ is that the LDP Proposals Map demonstrates that ‘Land West of Maendy Road’ is within a Special Landscape Area - see overleaf:
Vale of Glamorgan Proposals Map (Land West of Maendy Road outlined in red)
Under Policy MG17 ‘Special Landscape Areas’ it is considered that development in SLA could pose an “unacceptable harm to the important landscape of the area”. Accordingly, this development and proposed allocation could therefore cause “unacceptable harm to the important landscape of the area”.
‘Land at Ystradowen’ by contrast does not sit within a SLA (see below). This site would therefore not pose any potential concern in this respect as it would ultimately not cause any “unacceptable harm to the important landscape of the area”.
Vale of Glamorgan Proposals Map (Land at Ystradowen in red)
This is a significant factor to consider. ‘Land West of Maendy Road, Aberthin’ causing “unacceptable harm to the important landscape of the area” will lead to this proposed allocation being at risk of not being delivered by virtue of detailed assessments of its impacts and acceptability at planning application stage holding that the landscape and visual impact of development of the site is unacceptable. As such 25 affordable units will be lost from the proposed affordable 122 units, and ultimately being lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is not delivered (as it is located in a SLA), and so a “small scale affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” is not provided for. This is clearly an issue. Given however ‘Land at Ystradowen’ does not sit within a SLA – and so not pose any potential concern or cause any “unacceptable harm to the important landscape of the area” – the allocation of this site would be more suitable and “safer” - as therefore would be no concerns over this proposed allocation being removed and/or not being delivered in this respect (as it is not located in a SLA). This would ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”, are provided for. As such the proposed housing trajectory would be maintained.
Land North of West Winds Business Park, Fferm Goch
The below sets out the candidate site stage two assessment of ‘Land to north and west of Westwinds Business Park’:
Candidate Site Stage 2 Assessment (Site Ref. 398)
As can be seen above, the site was not considered suitable for further consideration, with the site scoring negatively (red) in respect to a number of key factors. These include the following:
• Access to Retail;
• Access to Health Services;
• Sustainable Transport- Public Transport;
• Access/ Proximity to services and facilities conclusion;
• Climate Change; and
• Health and Wellbeing.
Given the fact the site scores red in ‘Sustainable Transport – Public Transport’, this shows the site is not served by public transport connections within 800m, as outlined in the key below:
Additionally, Policy SP7 (Sustainable Transport) of the Vale of Glamorgan Preferred Strategy states “New development must support an enhanced transport network that increases the proportion of journeys being undertaken by sustainable travel modes”. Additionally Objective 8 (Promoting Active and Sustainable Travel Choices) states “new development is directed to locations that are or can be accessible by a choice of modes of transport, including walking, cycling, and public transport.”
It is well known that residents of affordable housing are statistically less likely to own private vehicles, making access to reliable and frequent public transport essential for ensuring equitable mobility. The provision of public transport infrastructure in close proximity to such developments is therefore a critical component in supporting access to employment, education, healthcare, and other key services, while also promoting sustainable travel patterns and social inclusion.
The site also scores red in respect to Access/Proximity to services, showing the site is greater than 1200m away from key services, as seen in the key below:
In respect of the above, Preferred Strategy 6.40 states the need “To ensure that new development takes place in locations that have the best access to a wide range of services, facilities, and employment opportunities, whilst minimising the need to travel, the distribution of growth is guided by the following settlement hierarchy”. To further highlight the importance of both sustainable transport and proximity to services, the preferred strategy also states the need to “Facilitate the development of adaptable, accessible, well-connected communities that have a strong sense of identity, offer a sustainable range of services and facilities and are equipped with adequate infrastructure”. In addition, Promoting Active and Sustainable Travel Choices outlines to “Promote and encourage the use of sustainable methods of travel, particularly active modes of transport, whilst simultaneously reducing the need to travel”.
In light of the above, this site does not align with the aims and targets set out in the Preferred Strategy, as it fails to meet several key development goals set out. It should therefore not be considered suitable to be allocated for future developments. Its inclusion is therefore unsound.
Should this view be concurred with, 22 affordable units will be lost from the proposed affordable 122 units, and ultimately will be lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is removed and/or not delivered as its inclusion is unsound as it does not align with the aims and targets set out in the Preferred Strategy - as it fails to meet several key development goals set out. A “small scale affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” will therefore not be provided for. This is clearly an issue.
When comparing this with ‘Land at Ystradowen’, the following is set out:
Access to Services and Facilities
This criterion has been assessed firstly on the location of the site proposal in terms of whether it is located within, adjacent to, or outside a settlement, and secondly the ease of pedestrian and cycle access to key services listed below.
With reference to the above:
• In terms of public transport, there are two bus stops located approximately 400m (7-minute walk) from the site (‘Ty Mawr Close’), with the ‘321 Nat Group Service’ providing services between Llantwit Major and Talbot Green.
• The site is also located 300m (3-minute walk) and 600m (10-minute walk) from Sports Pitches/Playing Fields such as ‘Ystradowen Children’s Park’, and the 3/4G Sports Pitch at ‘Ystradowen Petanque Club’.
• Furthermore, the site is located 480m (7-minute walk) from the ‘Murco – Tudor Garage’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
These services and facilities are therefore well within the best category (i.e. categorised/scored as ‘green’) - within 800m of site (10-minute walk). Accordingly, the site therefore has good access to services and facilities.
Furthermore, the settlement of Ystradowen has been ranked highly in the VoG Sustainable Settlements Appraisal, scoring a total of 14 points according to the distance to key services and facilities available. This places Ystradowen 26th out of a total of 87 settlements. As a result, this would be deemed a suitable area to accommodate growth.
As stated above the key settlement of Cowbridge is located in close proximity being only 2.7 miles to the south and a 9- minute bus journey. Cowbridge is identified as a sustainable location, and is ranked 4th place for services and facilities within the Vale of Glamorgan. The following key services are found in Cowbridge, and are therefore in close proximity to ‘Land West of Maendy Road’:
• Cowbridge Comprehensive Schools;
• Cowbridge Health Centre; and
• Cowbridge Town Centre for various Retail Services.
Furthermore, it is important to note that the above criteria does not take into account the important role and proximity of the Principal Settlement and Strategic Growth Area (as defined in the RCTCBC LDP) of Talbot Green / Pontyclun / Llantrisant which is 2.8 miles to the north (14-minute bus journey). Ystradowen would also naturally align, and function, in association with this Principal Settlement and Strategic Growth Area (of Talbot Green / Pontyclun / Llantrisant). These areas comprise for example the following key services:
• Cowbridge and ‘Y Pant’ Comprehensive Schools;
• Cowbridge Health Centre and Old School Surgery; and
• Cowbridge Town Centre, and Talbot Green / Pontyclun / Llantrisant (Strategic Growth Area), for various Retail Services.
Given the above, ‘Land at Ystradowen’ does/should align with the aims and targets set out in the Preferred Strategy as it meets several of the key development goals set out. Its inclusion should therefore, in our view, be considered “sound” and therefore suitable to be allocated for future developments. The site should properly and appropriately be allocated in lieu of ‘Land to north and west of Westwinds Business Park’ – the inclusion of which is “unsound”. ‘Land at Ystradowen’ would therefore ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”, are provided for. As such the proposed housing trajectory would be maintained.
Land to the East of Colwinston, Colwinston
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below:
As outlined above, the site was rejected and considered not suitable for further consideration. In fact, and unlike ‘Land at Heol Fain, Wick’ and ‘Land to north and west of Westwinds Business Park’ it was stated that this site “could not be considered as a suitable affordable housing led development site”. Despite this, this site is identified to be allocated as an Affordable Housing Led Allocation. As such, the inclusion of this site is “unsound”.
It is known that Colwinston has been subject to significant housing allocations in the settlement as part of previous plans. To evidence this, 25% of the 64 units (i.e. 16 units) were approved on the site allocation ref. MG2(41) and PP ref. 2014/00242/FUL. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Colwinston, further provision ought to be made in comparable (previously unprovided for) locations, such as Ystradowen.
Credentials of this site subject to this submission
There has been a significant change in the position and circumstances since the promoted site herein was assessed at Candidate Site Stage and the Assessment undertaken. The Stage 2 Assessment of the site concluded the following: ‘Whilst adjoining the existing LDP settlement boundary this is by virtue of an existing adopted plan LDP allocation this is currently under review. Notwithstanding this the site would represent unacceptable intrusion in to the open countryside.’
The assessment/conclusion implies that as this site (‘Land off Sandy Lane, Ystradowen’) has not been built out and is “currently under review”, it suggests that ‘Land at Ystradowen’ (430) does not adjoin the existing LDP settlement boundary. Given recent developments however associated with the implementation of the planning permission ref. 2023/00948/FUL (post approval on 9th December 2024) and the site being currently being “built out” and work commencing on site, the site no longer adjoins “the existing LDP settlement boundary … by virtue of an existing adopted plan LDP allocation … currently under review”. Accordingly, and given this, the ‘Land at Ystradowen’ site boundary therefore directly adjoins/is adjoining the LDP settlement boundary and the site promoted herein.
The following specific photo evidences ‘Land off Sandy Lane, Ystradowen’ (Housing Allocation 48) is being built out the western boundary of the promoted Site ID 430. This therefore clearly highlights that the site’s boundary is representing the existing settlement limit in the existing development plan. Accordingly, the ‘Land at Ystradowen’ site boundary therefore directly adjoins/is adjoining the existing LDP settlement boundary.
Summary of These Representations
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised above in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 7151
Derbyniwyd: 11/03/2026
Respondent ID: 1182
Ymatebydd: Peter Stone Properties Ltd
Asiant : Geraint John Planning Ltd
The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
ANNEX 1
Preface
This Annex sets out the detailed case in support of these representations, and by association the case for allocation of the site.
The representations are structured into the following sections:
1. Response to the Deposit Plan;
2. Comments on specific policies; and
3. A summary of the suitability of the site for development.
SECTION 1. Response to the Deposit Plan
Distribution of Growth
We object to the distribution of growth within the Deposit Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain the majority of housing growth in the Vale over the Plan period, or rather the over-reliance on this defined area, and the associated absence of growth in other parts of the Plan area.
As outlined in our previous representations, the allocation of housing and the location of strategic growth neglects the Rural Vale, and in our view, overprovides in the Strategic Growth Area. For example, with limited housing stock and average house sales at over £800,000 over the last 12 months, there is a clear and established need for new homes in the Bonvilston area, particularly at an affordable level. This is reinforced by the Local Housing Market Assessment that identified a need for over 1,114 new affordable homes per annum over the next five years throughout the county, and 196 units per annum thereafter (average of 502 units per annum over 15 years). Further to this, it is widely known that the rural Vale comprises the majority of the county’s ageing population, which, as a demographic, has and will continue to grow rapidly over the Plan period. This is evident in the ‘Population Change’ chart below – which is taken from the Deposit Plan:
VofG Deposit Plan: Figure 4 Population Change 2011 to 2021
It is clearly the case that younger populations are migrating to other Authorities, where access to housing is typically cheaper and more affordable, whilst more older populations are significantly migrating into the Authority. This trend will result in an extremely unbalanced demographic, given that the working-age population have sought housing elsewhere.
Without a suitable supply of affordable housing delivered over the Plan period, this trend will only worsen. Accordingly, it is not considered that the RLDP takes into account the lack of supply of affordable homes within the rural Vale, as well as increased housing to support the growing ageing population within these areas.
Para 3.19 of the Deposit Plan clearly outlines that affordable housing is required in the short term, in order to meet pressing needs. Specifically, it outlines the following: “There is significant pressure on temporary accommodation in the Vale, for a variety of reasons including increased homelessness presentations… The need for sufficient permanent affordable housing to assist in moving people out of temporary accommodation is critical and the planning system has a vital role in assisting in new affordable housing delivery.”
Accordingly, the distribution of growth within the Authority must be proportionate, to ensure that populations / areas are not left behind where they must seek access to housing elsewhere.
The RLDP Sustainable Growth Strategy sets out 6 objectives. Objective 4 states: “Allowing for small scale affordable housing led development in settlements outside the Strategic Growth Area at a scale proportionate to the size of settlement.” (Page 66)
Para 5.25 states “Therefore, a key part of the strategy is to allow for affordable housing led developments within sustainable primary and minor rural settlements outside of the Strategic Growth Area, at a scale that is appropriate to the size of the community it is serving. An ‘affordable housing led’ scheme is one where a minimum of 50% of the dwellings would need to be affordable, although this could increase to a maximum of 100% if the site is brought forward by a social landlord”.
In terms of the definition / explanation of what the affordable housing-led development sites are seeking to achieve, paragraph 6.132 of the Deposit Plan outlines the following:
“Accordingly, to ensure that new developments respond to the high demand for smaller properties, as identified in the LHMA, priority will be given to affordable homes that are small to medium-sized, typically comprising one to three bedrooms. Representations received from the local community through the RLDP process also highlighted a desire for new housing developments to offer opportunities for accessing smaller market homes. This is particularly relevant in the rural Vale, where housing choices are more limited. Providing smaller, more affordable market homes may assist first-time buyers and enable older residents to downsize to more manageable properties within their local area. Affordable housing-led sites will therefore need to demonstrate that an appropriate range of both affordable and market dwellings has been provided.”
Despite the acknowledgement within this strategic objective, we do not consider that the RLDP goes far enough to meet this objective, nor are its provisions and allocations adequate.
It is considered that this objective is undermined by the allocations set out by the RLDP (not least the absence of allocations in the rural Vale). Notwithstanding the Vision’s clear acknowledgement of the benefit of the growth of the rural Vale, these areas have not been supported through the plan due to the lack of growth which has been attributed to these areas in terms of further housing, employment and sustainable transport. All growth options have been selected on the basis of being in either a Key Settlement, Service Centre Settlement or Primary Settlement, all of which are already sustainable areas served by rail. As a result, it is not clear how this objective can be achieved, without the allocation of further sites within the Minor Rural Settlements, such as Bonvilston. The Vale is characteristically ‘rural’, and as such, there needs to be a stronger emphasis on supporting and delivering new development in order to bolster the rural economy. This includes enabling opportunities to provide employment and business premises within / near to rural settlements, as well as focusing housing growth in these areas to reduce travel time, and promote the use of sustainable transport.
It is considered that the current Strategy does not provide adequately for all residents across the Vale, only those within the Strategic Growth Area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan. This brings into question the “soundness” of the Plan.
The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north (as defined in the RCTCBC LDP). The Minor Rural Settlements to the west are more likely to be supported by job opportunities and employment in Bridgend than further east in Barry or Cardiff. Similarly, those in the north align with, and function in association with, the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north. These settlements are served by existing bus services that provide sustainable modes of travel to key employment locations in and around Bridgend. This is acknowledged in Paragraph 3.3 of the Strategy which states “The greatest number of residents who travel outside of the Vale for work purposes travel to Cardiff followed by Bridgend and Rhondda Cynon Taf, whilst a smaller proportion commute into the Vale from these neighbouring authorities”. The Demographic Evidence (Feb 2023) estimates the Vale as being a net importer of workers from RCT and Caerphilly (Para 3.6) - as shown in Figure 10 in the Preferred Strategy.
The current Strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas - given that Growth has been apportioned in only the Key Service Centre and Primary Settlements. It is considered that this will fail to support and facilitate the current (and any future) employment coming into the Vale, nor will it support any employment which is located outside of the Vale to the West and North. The Growth Option is too heavily reliant on access to railway stations as the key and sole sustainable transport method, whereas access to bus services should also be appropriately assessed and focused on in terms of promoting sustainable development. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural. The delivery and soundness of the Plan is therefore questioned and we continue to object to the spatial growth strategy as set out in the Deposit Plan.
Housing Supply
RLDP Allocations - Key Sites
As set out in representations made throughout the Plan preparation process, we consider that the Plan is too reliant on the delivery of ‘key sites’ to meet the housing need over the Plan period. Specifically, the Plan makes provision for 2,278 units in these Key Sites, which equates to circa 65% of RLDP allocations in the housing supply. The 5 key sites that are allocated in the Deposit Plan are as follows:
• Land at North West Barry – 376no. units;
• North of Dinas Powys – 250no. units;
• Land at Readers Way, Rhoose – 520no. units;
• Land at Church Farm, St Athan – 532no. units; and
• Land to the West of St Athan – 600no. units.
We object to the current housing supply to allocate 2,278no. (65%) of units across strategic sites, as this makes for a risky and unrobust strategy for delivering housing, and in turn, meeting the identified housing need over the Plan period.
As stated in previous representations, there is concern that the proposed timing and phasing of the proposed Key Sites is unrealistic and unrobust, and in turn, undermines the soundness of the Plan, given the heavy reliance on Key Sites delivering new homes across the Plan period. Whilst it is not disputed that the sites would have gone through rigorous assessment to inform their proposed allocation, the timescales for securing planning permission (with all associated conditions discharged) is considered to be unachievable. This is particularly the case for the following timescales that are set out in the Housing Trajectory that underpin the Plan:
• “Time period of pre-application discussions/PAC consultation” – 4 months
• “Time between submission of planning application and determination” – 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” – 4 months
It is considered that the above timescales are fundamentally unrobust, and result in a distorted position of housing sites over the RLDP Plan period. It is not considered that these reflect or are informed by the timescales that are currently being incurred for planning applications submitted for major housing sites across Wales. It is rather the case that such applications would typically be determined 1-2 years following submission, given that there are a wide range of stakeholders involved in the determination of major planning applications – which often adds to the delays associated with the determination of such applications.
It is equally the case that the assumptions in the trajectory are solely based on expected timescales for processing formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission.
It is assumed that these timescales have not considered that such major developments can be subject to the need to undertaking and submitting an Environmental Impact Assessment (EIA), which adds another layer to the determination of any planning application – given the additional considerations that form part of this process. As such, any site subject to EIA would very likely result in further delays extending beyond the timescales set out in the trajectory. Equally, as set out above, the preparation of an application subject to an EIA requires even more detail and assessment, which only further adds to the preparation stage (which has not been factored into as part of the trajectory). Accordingly, it is not considered that the trajectory contains any contingency if any site is required to undertake EIA as part of their application.
For the reasons stated above, it is unlikely that the sites will yield in full, particularly those sites which are expected to deliver housing right up to the final year of the Plan period (‘Land at Readers Way’ and ‘Land to the West of St Athan’). These sites do not allow for any ‘slippage’ should any delays arise through the development management process (which for the reasons set out above, will very likely be the case), and as such, a gap in housing delivery will be brought about as a result of these sites not yielding in full.
Given the proposed ambitious timescales set out for the delivery of the Key Sites, it is considered the housing trajectory is unrobust, and in turn, undermines the soundness of the Plan as a result. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to fully yield given that such sites are subject to less assessment and consideration compared to strategic sites. This would make for a more robust strategy, where a greater number of small to medium sites can deliver housing in the short and medium term of the Plan period, whereas the strategic sites represent a more longer-term strategy to deliver housing – which would then spill into the next Plan period.
Accordingly, we object to the Deposit Plan in its current form, where there is an overreliance on housing need to be met through the delivery of the Key Sites, which we consider to be unrobust, and undermine the integrity and soundness of the Plan. The current strategy of the Plan is at significant risk of not delivering the level of housing expected based on the sites allocated, as least as swifty as identified in the housing trajectory. Should no change be made to the Plan to address the above issues, then it is extremely likely that the Plan would ‘fail’ in meeting the identified housing need.
Windfall Sites
It is noted that the RLDP is made up of the following:
• Existing land supply (3,838 units)
• Windfall sites (1,303 units)
• Allocated sites (3,521 units)
Para 6.69 states that “Analysis of historical delivery of housing indicates that on average small windfall sites (sites of less than 10 dwellings) have provided some 53 dwelling completions per year, and large windfall sites (10 dwellings or greater) contributed on average 80 dwellings per year. Overall, it is projected that windfall sites could contribute a further 1,303 dwellings over the remainder of the plan”.
As set out in our previous representations to the Housing Trajectory, we would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan – which is discussed in greater detail later in this submission. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
St Athan Train Station
The RLDP Sustainable Growth Strategy comprises six key elements, of which the following is set out in respect to the allocation of new housing growth in the Authority:
“3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.”
The strategy outlines that a feasibility study for a station in St Athan had been undertaken in 2022, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ and 80no. units attributed to ‘Former Stadium Site, adjacent to Burley Place’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,263no. homes to be delivered in St Athan over the Plan period.
It is now the case, however, that the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales – as confirmed in the ‘Today, Tomorrow, Together: A vision for rail across Wales and Borders’ (February 2026) recently published by Transport For Wales. This paper acknowledges that a new railway station at St Athan would represent a longer term opportunity, and therefore, will not be delivered in the short term / within the Plan period of the emerging Plan. Equally the Council have not provided any evidence to contradict this, and therefore, it is very unlikely that any new train station will be delivered in St Athan over the Plan period. This brings about significant questions regarding the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,263no. homes (36% of the Plan’s new housing allocations) are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
In terms of the expected delivery of the Key Sites in St Athan, it is noted that the trajectory identifies that for the majority of the Plan period, both sites will be delivering 80no. dwellings per annum on each site (equating to 160no units in total). Whilst these are two separate sites, we seriously question the realistic prospects of the significant number of
homes being built simultaneously on two sites in proximity to one another – given the considerable logistical issues that would be brought about.
Accordingly, it remains that there are serious questions regarding the suitability and acceptability of the proposed allocations at St Athan, which do not accord with the strategy adopted for the RLDP – to focus housing growth on settlements that are supported by railway stations. Moreover, the scale of development proposed at St Athan is also not considered to be proportionate, with a significant number of homes delivered in a location not served by a railway station.
Rolled forward LDP Sites
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current Plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application
submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ’soundness’, and risks rendering the Plan unrobust.
Housing Delivery Rate Assumptions
As set out in our previous representations to the Housing Trajectory consultation, we have considerable concerns in relation to the proposed delivery of the sites identified in the trajectory – which we do not consider are robust or reasonable.
Appendix 1 of the Deposit Plan sets out the development trajectory bar chart – which illustrates the proposed delivery of housing, on a per annum basis, over the Plan period.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
It is our view that the trajectory makes for an unrealistic and unrobust delivery rate of housing, which does not reflect the pattern of housing completions in the Vale of Glamorgan. We therefore have concerns regarding the soundness of the trajectory, not least that there remain significant uncertainties as to the delivery of the Key Sites (as discussed earlier in these representations).
Firstly, the graph / trajectory illustrates a large ‘spike’ in terms of housing delivery in the year 2027-28, which is considered to be a marked and pronounced step change in the rate of delivery. This envisages / relies on a significantly higher rate of delivery than previous years in the Vale of Glamorgan (2021 through 2021 – as depicted by the green columns). It is considered that this level of delivery is unlikely to materialise, not least given prevailing market
circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions from 2021 - 2025 has been approx. 400 - 500 units, however, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100% relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
It is also the case that the anticipated delivery of housing fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2025.
Accordingly, we consider that the housing trajectory, as proposed, is entirely manufactured and unreflective of the past completion rates, as well as the recent published completion rates provided by Welsh Government recently in August 2025. As set out in our previous representations, it has been evidenced that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1: ‘New House Building: April 2024 to March 2025’
As identified in the graph above, in 2024-25, 4,631 new dwellings were completed, which represents 3% fewer than the previous year. This figure represented the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed) The New Housing Pipeline Report Quarter 3, 2025 Report (December 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 7% during the third quarter of 2025, extending the decline seen during the first half of the year. At 45,075, the number of units approved was 34% down on the third quarter of 2024 and the lowest quarterly total since 2012 Q2. At 146,798, the overall number of units approved during the first nine months of 2025 was 25% lower than a year ago.
HBF Graph Illustrating Residential Approvals (2006-2025)
The above graph clearly shows a pronounced downward trend in the number of residential planning approvals over the period, particuarly with a sharp decrease seen since 2020. Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
More recently, the Welsh Government has released its new estimates of housing need (Estimates of Additional Hosing Need: 2025-based – February 2026). The estimates show how many new homes need to be built over the next twenty years to address existing unmet need as well as newly arising need. The figures set out that around 8,700no. new homes a year are needed over the next Senedd term up to 2030 to meet new housing need. Additionally, there is an unmet need for 9,400 affordable homes.
Overall, this represents more than double 2024/25 levels of supply, where just 4,638 new homes were built.
HBF: Estimates of Housing Need
HBF: Actual Delivery vs Estimates of Need
The above graphs unequivocally evidence that historical rates of delivery of housing in Wales has remained low, and moreover, significant numbers of housing need to be allocated in order to meet the estimate of need. It is not
considered that the housing trajectory, in its current form, is robust to meet the housing need over the Plan period, given the uncertainties of the Key Sites, and the level of housing delivery that has been identified for the Plan.
Affordable Housing-Led Sites
HG4 - Rural Affordable Housing Led Sites
Policy HG4 of the Deposit Plan identifies four sites to be allocated as affordable housing-led sites, totalling approximately 122 dwellings within the plan period. Given the target levels of achieving 3,070 affordable dwellings over the course of the Plan period (up to 2036), it is not considered that this policy goes far enough to address the target and level of affordable housing need.
It is noted that the number of units identified for each site relate to the ‘total’ number of units delivered, as opposed to the affordable housing provision. Accordingly, it can be assumed that circa 50% of each allocation will comprise affordable units (given each site is affordable-led), which would equate to a total provision of circa 61no. units. The contribution from the affordable housing-led sites would only equate to 2% of the total need (3,070no. units). Even when coupled with the affordable housing provision from open market sites and 100% exception sites, the total delivery of affordable housing will still be nowhere near enough to meet the overall affordable housing need over the Plan period. Accordingly, it is considered that inadequate provision has been made for such sites – not least given that 3 of the 4 allocated affordable housing-led sites are located west of Cowbridge.
Insofar as to the sites chosen and allocated are concerned, it is clear from reviewing the Stage 1 and Stage 2 Candidate Site Assessment that the allocated sites HG4(1) – (4) were not considered acceptable due to being outside the strategic growth areas, and were considered to be unacceptable intrusions into the open countryside. After being resubmitted as affordable housing-led sites, the sites were allocated, some with a smaller area in order to accommodate less dwellings in total.
The sustainable credentials of the sites allocated is not disputed, and it is acknowledged that these minor rural settlements have the ability to accommodate further growth, in the form of affordable-led housing allocations. However, it is considered that Land South of A48, Bonvilston (Site ID: 435 / 3857) should also form an allocation as part of this policy, given its high sustainability credentials and its appropriate location to accommodate a suitable level of development. Please refer to the previous representations made to the Housing Trajectory Consultation (dated 17th October) for further, more detailed comments regarding the above sites.
The LHMA 2023 shows that there is a need for 77 affordable homes in the St Nicholas & Llancarfan housing market area (which Bonvilston is located within), and a need for 242 affordable homes in the Wenvoe housing market area. As such, there is an identified need for affordable housing in this area, something which the site could address through an allocation.
Securing further delivery of Affordable Units
As set out above, it can be assumed that the affordable housing-led allocated sites only provide 61no. affordable dwellings, which comprise 4no. allocated sites that are expected to deliver approximately between 20 – 50 dwellings (including both affordable and market housing). However, the RLDP sets a target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4% of the target provision and will only make provision for 2% of the targeted number. We would therefore object to the sites included
within Policy HG4 and would suggest that more sites should be allocated as part of the policy in order to secure delivery of a higher number of affordable housing units to meet the target.
Whilst it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, as set out above in these representations, there is serious concern regarding the deliverability of these sites, which would result in a significant gap of affordable housing delivered.
A greater number of affordable housing-led sites allocated would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in affordable housing need being unmet, with demand continuing to outstrip supply.
Previous representations to the Preferred Strategy (dated 14th February 2024) provided comment on the sustainability scoring of Bonvilston and the proposed site. As outlined within these representations, it is considered that the site (ID 435 / 3857) represents a sustainable, deliverable and acceptable site. This proposed allocation is situated in proximity to Cowbridge, Culverhouse Cross and Cardiff, which comprise all key services. Given that the site is located within 4 miles of both Cowbridge and St Nicholas, the site is within a maximum 20-minute bus journey of the following key services:
• Cowbridge Comprehensive School;
• St Nicholas Primary School;
• Cowbridge Health Centre; and
• Cowbridge town centre for various Retail Services.
Accordingly, the settlement of Bonvilston represents an acceptable location to allocate an affordable housing-led site, given the access to existing services and facilities that would serve future residents of the site.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of Bonvilston, support the surrounding settlements, and the Plan area as a whole. As such, the site should be considered further.
Comments on Specific Policies
HG5 - Affordable Housing Exception Sites
Given the unmet need and extant backlog of affordable housing, as identified within the LHMA (2023), it is noted that an Affordable Housing Exception Sites policy has been adopted in order to assist in the delivery of affordable housing. Policy HG5 sets out the specific criteria where proposals for 100% small scale affordable housing developments will be permitted outside settlement boundaries. The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
That said, it is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands. Therefore, the proposed amendments to Para 6.140 are outlined below in red:
6.140 “For the purposes of this policy, ‘small-scale’ will generally mean no more than around 10 dwellings on sites adjoining Minor Rural Settlements. In Primary Settlements outside the Strategic Growth Area, proposals for more than 10 dwellings may be acceptable where required to meet a specific need and where the number of dwellings is proportionate to the size of the settlement. In assessing the scale and extent of any proposed local needs housing, consideration should also be given to affordable housing already planned in the ward or nearby area, including sites
with existing planning permissions and those allocated in the RLDP. The size and type of affordable housing proposed should reflect the identified local need in the area.”
The above suggested wording would achieve a more flexible policy, which would allow for a variety of scaled applications to secure planning permission for solely 100% affordable housing across the Authority area. This greater flexibility would enable the policy to make a significant contribution towards meeting the affordable housing need – which, as set out earlier is in considerable need.
SECTION 3. Suitability of the site for development
The site promoter objects to the overall assessment of the site, in that it is not considered suitable for further development in the Plan. The promoted site has undergone extensive scrutiny and appraisal at a high level to ascertain the qualities of the site, in light of all identified material considerations which relate to the proposals.
The delivery of the site will yield much needed housing (including Affordable housing) and contribute to the overall supply in the new Plan period, whilst making effective use of a suitably located site for residential development.
Moreover, as set out in ‘Annex 2’ of our representations, the site has overcome the ‘constraints’ set out in the Candidate Site Assessment undertaken for the site, which demonstrates that the proposal is both acceptable and deliverable.
Deliverability of the Site
In summary, the site seeks to deliver the following key elements:
• In summary, the opportunity of the site seeks to deliver:
• Residential development comprising up to 25 dwellings, with at least 50% affordable housing in accordance with Policy SP2,
• Highways infrastructure within the site;
• Upgraded access to the site;
• Strong legible pedestrian and cycle connections throughout the site and with the existing settlement;
• Green Infrastructure; and
• Sustainable Drainage Systems (SuDS).
SUMMARY AND CONCLUSIONS
In summary, the site promoters:
• Object to the distribution of growth proposed for the Plan area, with a more balanced and equitable distribution of housing sites required in order to meet the identified housing need;
• Object to the level of growth identified for the Plan period;
• Object to the housing trajectory that underpins the delivery of housing within the Plan period – which is considered to be unrealistic and unrobust, leading to serious uncertainty regarding the “soundness” of the Plan;
• Object to the over-reliance on Key Sites and Rolled Forward Sites in making up the Plan’s housing land supply;
• Object to the scale and timing of delivery of sites in / around St Athan – all of which are predicated on railway station provision which will not be realised in the Plan period;
• Object to the under-provision of sites under Policy HG4 – Rural Affordable Housing-Led sites, not least given their extremely limited contribution to the targeted need for affordable housing;
• Object to the current wording of the HG5 Policy ‘Affordable Housing Exception Sites’ which requires greater flexibility to play an important role in delivery much-needed affordable homes across the Authority; and
• Object the Council’s assessment that the site is not considered suitable for development.
The site and proposals are consistent with the RLDP strategy, other Vale of Glamorgan strategies, and the requirements of Planning Policy Wales and Future Wales. It will make a significant contribution to the Vale’s identified housing requirement in the RLDP period and will provide for a wide range of uses that will support the wider community whilst embodying principles relating to placemaking and the well-being of future generations.
The site has no fundamental constraints and has the ability to deliver significant economic, social and environmental benefits for the benefit of future residents and the existing local community. The site is demonstrated to be viable, being able to deliver policy-compliant levels of affordable housing and given its location within a strong market area, will benefit from high delivery rates.
ANNEX 2
SECTION 4. A summary of the suitability of the site for development including a Response to the Candidate Site Assessment
This section of the overall representations to the Deposit Plan is to respond to, and address, the Council’s assessment of the site.
While the issues the Council have raised in their assessment of the site have been addressed and discussed within the representations made at the Preferred Strategy stage of the Plan, a similar ‘scoring’ exercise has been undertaken as part of the evidence base for the Deposit Plan. As such, it is still pertinent to consider and respond to the Council’s assessment of the site as part of these representations
The Detailed Site Assessment for Land South of the A48, Bonvilston (Site ID: 3857) sets out that the position of the site at the Deposit Stage is as follows:
“Notwithstanding the amendment from a market led to an affordable housing led scheme (original CS 435), the other reasons why the site was previously discounted still remain.
The development would have an adverse impact on the character and setting of the Bonvilston Conservation Area. Development of the site would require major highway mitigation works to enable safe vehicular access on to the A48.
The Predictive ALC Maps indicates that site is Grade 2 Best and Most Versatile Land. Development of the site would lead to the loss of BMV land. BMV land should only be developed if there is an overriding need for the development and either previously developed land or land is lower agricultural grades is unavailable. There is housing land available within the ward of St Nicholas and Llancarfan that can support the delivery of affordable housing.”
Conservation Area
In terms of the assertion that “The development would have an adverse impact on the character and setting of the Bonvilston Conservation Area, this is strongly disputed.
Whilst it is acknowledged that the site lies within the Bonvilston Conservation Area, the conclusion that it would be adversely affected is not considered to be accurate. Firstly, the site as it currently stands, consists of an open field. This does not match the conservation area which is characterised primarily by residential dwellings of varying densities, and as such, it is considered that development of the site with sensitively designed buildings would enhance as opposed to harming its surroundings.
Secondly, the large residential development to the north of the site, ‘Land at Sycamore Cross’ ref. 2015/00960/FUL encroaches on the Bonvilston Conservation area but was deemed acceptable by the LPA. Although not all of the site is within the Conservation Area, it’s encroachment and presence adjoining and surrounding a large proportion of the area is considerable and was deemed acceptable by Officers in 2017. Given this, a development at the Land South of the A48 should be deemed acceptable, as it follows the same principles albeit at a much smaller scale.
Highways
As for the statement that “Development of the site would require major highway mitigation works to enable safe vehicular access on to the A48”, this is also strongly disputed.
The site is located immediately adjacent to the adopted highway where it is proposed to upgrade and enhance the existing gated access point. Due to the existing access point, it is not considered that ‘major’ highway mitigation works would be needed, rather this would be enhanced and improved as part of the proposed development. Furthermore, given the nature of the road, with long views extending in both directions, it is anticipated that appropriate visibility
splays could be achieved to enable safe access and egress. As such, it is considered that the site would achieve appropriate highway access within the need for “major” highway mitigation works.
Agricultural Land Classification
The Detailed Site Assessment also sets out that “The Predictive ALC Maps indicates that site is Grade 2 Best and Most Versatile Land. Development of the site would lead to the loss of BMV land. BMV land should only be developed if there is an overriding need for the development and either previously developed land or land is lower agricultural grades is unavailable.” This is strongly disputed.
A review of the Agricultural Land Classification Predictive Map indicates that the site lies primarily within ‘Grade 2: Very good quality agricultural land’ but no Grade 1 land is present. Further assessment and tests to establish the quality would therefore be undertaken in due course to confirm the quality of the land. However, it is not considered that it would be suitable to farm in any event given the location immediately adjoining existing residential development and the fact that it is within private ownership. Overall, given that the site is relatively small with a gross area of 0.88 hectares, it is not considered that its development would result in a detrimental or significant loss of agricultural land – not least given that site is not capable of beneficial agricultural production due to its limited size.
Housing / Housing Land
Further to the above, it is also set out that “There is housing land available within the ward of St Nicholas and Llancarfan that can support the delivery of affordable housing”, however, this is not considered to be entirely accurate.
The LHMA 2023 shows that there is a need for 77 affordable homes in the St Nicholas & Llancarfan housing market area and a need for 242 affordable homes in the Wenvoe housing market area. This need has not been met through the allocations of sites within the RLDP, nor has it been met through outstanding commitments.
As outlined in Annex 1, it can be assumed that the affordable housing-led allocated sites will only provide for 61no. affordable dwellings within the Rural Vale, comprising 4no. sites that are expected to deliver approximately 20 – 50 dwellings (including both affordable and market housing). However, the RLDP sets a target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4% of the target provision and will only make provision for 2% of the targeted number. Therefore, more sites should be allocated in order to secure the delivery of a higher number of affordable housing units to meet the target.
As set out within Annex 1, it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, however, there is serious concern regarding the deliverability of these sites, which would result in a significant gap in the total affordable housing that is delivered. Therefore, allocating a greater number of affordable housing-led sites would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in the both the overall affordable housing need, and the need for the St Nicholas & Llancarfan housing market area, being unmet, with demand continuing to outstrip supply.
The LHMA 2023 sets out the existing stock and planned supply of affordable housing over the next 5 years (up until 2028). This assessment found that the housing market area of St Nicholas & Llancarfan has a committed supply of 4no. one beds, 11no. two beds, and 3no. three beds, with 2 no. three beds as expected re-lets. The assessment also identifies a committed supply of 39no. units for intermediate housing.
The LHMA also sets out the existing stock and planned supply for Wenvoe, identifying the committed supply of social rent homes to be 12no. one beds, 11no. two beds, and 5no. three beds, with 7no. one beds and 8no. two beds as expected re-lets. There is no committed supply for intermediate housing in Wenvoe.
It should be noted that the development of ‘Land East of Nicholas’ (Campbell Court and Cae Newydd), has now been completed, and as such, can not form part of the housing land available. The latest Pre-Application Response for the site subject to these representations (Land South of the A48, Bonvilston) accounted for the development of the site in
St Nicholas, stating that “even after the developments at St Nicholas and Culverhouse Cross, there was the need in the Wenvoe ward for 1 Bed 71, 2 Bed 49, 3 Bed 29, 4 Bed 7, 5 Bed 5, Total 161".
It should also be noted that there are existing commitments within the Bonvilston area (‘Land to the east of Bonvilston’), however, the deliverability of the existing commitment is seriously questioned. Application Ref. 2015/00960/FUL was approved in July 2017, with the Housing Land Supply and Housing Trajectory Report (December 2025) confirming that of the total 120 units permitted, only 40 had completed by 1st April 2025, with the remaining 80 units not started by this same date. Of the 80 units not started, 25 units are affordable homes.
It is well known that phase 1 of the development at ‘Land to the east of Bonvilston’ has faced difficulties which has led to the development remaining incomplete. This does of course put into question the overall deliverability of the site, and raises concerns about the units that were, and still are, required within the Bonvilston area.
The allocation of the site promoted herein would not only help in the short term in meeting the overall affordable housing target for the Plan, but would also assist in meeting the unmet needs of affordable housing within Bonvilston – not least given the serious concern regarding the deliverability of the committed supply of housing within the St Nicholas & Llancarfan housing market area.
For the reasons set out above, and in light of the information provided within the LHMA 2023 and the Housing Land Supply and Housing Trajectory Report (December 2025), it is evident that there is considerable need for affordable housing within Bonvilston, and accordingly, the housing market areas of St Nicholas & Llancarfan, and Wenvoe. There have not been any sites allocated to assist within meeting the local need, and more sites should be allocated in order to secure delivery of a higher number of affordable housing units to meet the overall target of the Plan.
The contention that “There is housing land available within the ward of St Nicholas and Llancarfan that can support the delivery of affordable housing” is therefore strongly disputed – not least given that there is a clear and evident need to allocate more affordable housing-led sites in order to meet the target set out in the Plan.
Interim Summary
In summary, it is considered that the site subject to these representations would not have an adverse impact on the character and setting of the Bonvilston Conservation Area, nor would major highway mitigation works be required to enable safe vehicular access on to the A48. Moreover, it is considered that the site’s classification as BMV Agricultural Land does not pose a fundamental constraint to development – as the site represents a relatively small parcel with a gross area of 0.88 hectares, which is not capable of beneficial agricultural production due to its limited size.
There is also a considerable need for the affordable housing in Bonvilston and the housing market area of St Nicholas & Llancarfan. The site promoted herein would assist in meeting these local needs and should be allocated accordingly.
Candidate Site Assessment
The Detailed Site Assessment undertaken by the LPA includes a summary and assessment of the ‘scoring’ system used at the Preferred Strategy stage. A comparison between the site assessments undertaken at both the Preferred Strategy stage and Deposit Plan stage is provided overleaf for reference.
Site Assessment at Preferred Strategy Stage Site Assessment at Deposit Plan Stage
As demonstrated above, there has only been one change to the scoring attributed to the site, this being a change from ‘red’ to ‘amber’ for ‘Developer Interest’. Detailed submissions were made on the previous assessment undertaken by the Council at Preferred Strategy stage, and as such, should be read in conjunction with these representations accordingly (see Appendix B).
Whilst detailed submissions were made on the previous assessment, it is considered pertinent for the scoring of the key criteria’s to be addressed as part of these representations. As such, these have also been discussed below.
Developer Interest
As set out above, the Detailed Site Assessment for ‘Developer Interest’ has changed from ‘red’ to ‘amber’. The assessment methodology for this section of the assessment has been extracted below for reference.
As set out above, ‘amber’ refers to there being no development interest identified at this stage, however, there is evidence to indicate that the site is being actively promoted by the owners.
The representations made to the Preferred Strategy (Appendix B) sets out that whilst the site does not yet have an agreement with a developer to take on the land, it is considered that this would be achieved should the site be allocated, and planning permission granted. Newydd Housing association have been engaged previously and had agreed to take the site forward as a 100% affordable scheme, albeit is also considered that they could take on the affordable units as part of a mixed tenure scheme.
In addition to Newydd, the site promoter has also received an offer from a private social housing provider who would be prepared to support the site as a mixed tenure scheme.
This position has not changed since the Preferred Strategy stage, and is considered that there is continued developer interest for the site. This is not considered to change at any point – not least given the discussions held between the owners of the site in questions and developers of interest.
Environmental and Physical Constraints
As set out at the Pre-Application Stage. the site underwent a Preliminary Ecological Appraisal in September 2022 which identified that whilst some precautionary measures were recommended in terms of protecting priority habitats and reptiles, the site is not fundamentally constrained from development on ecological terms. Given this, it is considered that further ecological surveys would be undertaken at the planning stage to inform any development proposals and ensure the safeguarding of the natural environment.
Access to Key Services (Retail, Primary Schools, and Health Services) and to Services and Facilities
As set out within the representations made to the Preferred Strategy, the site is located within a maximum of a 20-minute bus journey to a version of every key service listed, due to the proximity of the site to settlements such as Cowbridge, Culverhouse Cross and St Nicholas. Due to the availability of frequent bus services, and active travel links, these key services are readily available to access for any residents within Bonvilston without the need to travel by car.
To reiterate, the site ‘Land South of the A48, Bonvilston’ is situated in proximity to Cowbridge, Culverhouse Cross and Cardiff, which comprise all key services. Concluding this allocation as ‘unsustainable’ in regard to ‘availability of local facilities in and around settlements’ is not accurate. Given that the site is located within 4 miles of both Cowbridge and St Nicholas, the site is within a maximum 20-minute bus journey of the following key services:
• Cowbridge Comprehensive School;
• St Nicholas Primary School;
• Cowbridge Health Centre; and
• Cowbridge town centre for various Retail Services.
It should also be noted that Bonvilston contains a number of facilities within a short and level walking distance of the site, including the village shop and Café, as well as the Red Lion Public House.
Given the accessibility of the site to other settlements, and the fact that these are made accessible by bus and active travel routes, it is considered that the site should be concluded as sustainable in regard to access to key services.
Summary and Conclusion
As evidenced above, and within the representations made to the Preferred Strategy (Appendix B), there are no fundamental constraints at, or associated with the site, that would preclude the site coming forward for development in the RLDP period.
To conclude, the settlement, location, and site, are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of the Vale of Glamorgan.
Summary of These Representations
In short, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised below in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Preface
This Submission sets out the detailed case in support of these representations. The representations are structured as follows:
1. Procedural Consultation Matters;
2. Timing Assumptions underpinning the Trajectory;
3. Housing Delivery Rate Assumptions;;
4. Status & Standing of Sites included in the Trajectory;
5. Key Sites;
6. St Athan Train Station;
7. Geographic distribution of the ‘new’ sites / provision;
8. Detailed comments in respect to ‘new’ sites;
9. Conclusions Procedural Consultation Matters
Firstly, we do not consider that the consultation on the Housing Trajectory information has been procedurally undertaken appropriately or suitably.
Only 14 days have been afforded to parties to make representations on the information provided. This is despite new sites being introduced (at this late stage) i.e. Land South of Clive Road (identified in Table 4), as well as a number of affordable housing led housing sites being introduced (i.e. those outlined in Table 5). This does not provide an adequate process or timescale for objectors to scrutinise the published content, and to make comments on sites which have been presented for the first time at a late stage in the process.
As part of these representations, we will be making brief comment on the sites which have not been previously consulted upon, namely:
Other Housing Allocations
• Land south of Clive Road, St Athan;
Affordable Housing Led Sites
• Land at Heol Fain, Wick;
• Land west of Maendy Road, Aberthin;
• Land Noth of West Winds Business Park, Fferm Goch; and
• Land to the East of Colwinston.
It is considered necessary to comment on these sites, given that they form an important and critical part of the housing trajectory, and by association in the Council and Plan reaching their targets. Moreover, these sites have not been consulted on previously. Accordingly we consider it necessary to pass comment on these in order to ensure that the consultation is fair and robust.
As well as limited time given to comment on the information contained within the Housing Trajectory, the LPA have failed to set up a Housing Stakeholder group to agree and discuss the trajectory information and data – with the cover email to the consultation (dated 3rd October 2025) stating “it is considered that it would be the best use of stakeholder time to conduct this engagement via email, particularly as many of the forecasts have been developed in consultation with site promoters including developers and their agents”.
We submit that the stakeholder consultation has not been a transparent nor robust consultation process, given that the Development Plans Manual states at Para 5.66 “A housing trajectory must be prepared to support the Deposit Plan. In order to generate a housing trajectory and associated phasing tables it will be necessary for LPAs to engage with stakeholders through a Housing Stakeholder Group. This will ensure that the timing and phasing of sites is robust and based on up to date information”. Given that this has not taken place, we would raise fundamental concerns that the consultation of the trajectory has not adequately taken place as per the relevant guidance. Afterall, the guidance stresses that a Group should be formed as a necessity. Accordingly, there has not been an adequate process and opportunity to review and comment on the information published, including in respect to the other sites have been introduced at this late stage.
Timing Assumptions underpinning the Trajectory
The assumed and factored in timescales of the various stages of bringing forward sites i.e. the pre-application stage, the planning application process, and the discharge of condition process outlined in the trajectory are considered to be fundamentally inaccurate, and result in a distorted position of the delivery of housing sites over the RLDP Plan period. The assumptions are far too ambitious, and without evidence / are not comparable with the timescales being incurred in processing such stages at the Development Management stage(s).
Specifically, we raise objection to the following timescales which are considered to be extremely ambitious and unrealistic:
• “Time period of pre-application discussions/PAC consultation” = 4 months
• “Time between submission of planning application and determination” = 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” = 4 months
In our experience, having submitted a significant number of major and other applications for housing and other forms of development in the last 1-2 years to the Council (and elsewhere in Wales and England), it is extremely unlikely that major applications can be submitted, and planning permissions granted, within the timeframes assumed by the trajectory. A wide range of stakeholders are also involved in the determination of major planning applications, which often adds to the delays associated with the determination of such applications. We would therefore consider that a time period of “6 months” given to all major applications in the housing trajectory is not feasible, and distorts the trajectory timescales for the remaining Plan period.
The assumptions in the trajectory are also solely based on expected timescales for the processing of formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission (i.e. pre-application enquiry submissions / planning application / discharge of condition details etc). When factored in these will elongate the timescales for bringing forward schemes considerably.
Moreover, it is common practice for larger housing sites and major applications to have a range of pre-commencement conditions attached to a permission once granted. Again, we would raise concerns with the timescales indicated in the trajectory related to this part of the planning process. It is highly unusual and questionable that any technical work required by these conditions (usually relating to drainage and highways matters) would be instructed, completed and submitted within 2 months, and for these to then be signed off / approved in a further 2 months. There are also other technical matters and necessary approvals falling outside of, and over and above, the planning system, such as SAB, s.106, s.38 and s.278 agreements, timescales for which have not been accounted for – and all of which are rarely completed within “4 months” as indicated.
It is therefore highly doubtful that the timescales legislated for in the trajectory for the various stages pre-construction are achievable – with no information about these proposed timescales outlined within the supporting text of the Housing Trajectory. We would therefore raise considerable concerns and objections to these as they stand without full evidence to fully show how these have been calculated, and without there being considerable (and necessary) adjustment to the timescales indicated and factored in.
We would therefore object to the timescales indicated in the ‘Timing and Phasing of Sites’ table, given that the delivery start dates will be pushed back further into the Plan period. Accordingly, and as a result, the Plan is at risk of not delivering the level of housing expected based on the sites allocated, at least as swiftly as is set out in the trajectory.
Housing Delivery Rate Assumptions
We would also raise considerable doubt over the proposed delivery of the sites identified in the Housing Trajectory - which we do not consider are robust or reasonable.
The development trajectory bar chart set out in the consultation material (extracted below) anticipates and legislates for a number of critical events and circumstances – all of which are considered to be unrobust and unsound.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
Firstly, a large ‘spike’ (material increase) in housing delivery is factored in to take place in 2027 – 2028. This is a marked and pronounced step change in the rate of delivery, and envisages / relies on a significantly higher rate of delivery than previous years in The Vale of Glamorgan (2021 through 2025 - as depicted by the green columns). This is considered extremely unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions in The Vale of Glamorgan from 2021 - 2025 has been approx. 400 - 500 units. However, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100%relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
The anticipated delivery of housing also fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the
period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2015.
To summarise, we consider the defined position to be wholly manufactured and unreflective of the past completion rates, as well as the recently published completion rates provided by Welsh Government recently in August 2025. In the Welsh Government Statistics Document ‘’New House Building: April 2024 to March 2025’, information on the number of new dwellings started is provided, where building has commenced and those completed for April 2024 to March 2025. Figure 1 provides a graph showing starts in the last 10 years, and it is clear that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1:.‘New House Building: April 2024 to March 2025’
In 2024-25, 4,631 new dwellings were completed, 3% fewer than in the previous year. This was the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed). The New Housing Pipeline Report Quarter 2, 2025 Report (September, 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 6% during the second quarter of 2025, continuing the decline of approval during the first three months of the year. Wales saw one of the largest declines in the UK in approvals with a decline of 29%.
Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
The Home Building Sector Skills Plan (Aug 2025) published by the HBF also identified the following issues with the workforce to bring forward built development in Wales:
• “A shortfall in numbers entering roles from the education system;
• An ageing workforce: 25% of the home building workforce is aged over 50, meaning the sector is facing an impending retirement cliff edge;
• Challenges attracting a wider talent pipeline into the sector;
• A lack of understanding of critical future skills needed, and direction from the Future Homes Standard; and
• Output within the sector fluctuating with demand and economic pressures, leading to additional pressures in recruitment and training”.
It is not considered that in the next 1-2 years that any of these issues can or will be substantially corrected – at least sufficiently so to allow for, and enable, the planned delivery rates of new housing completions to be as high as < > 1,000 homes in one year (and for four consecutive years at that).
We would therefore object to the proposed numbers of completion expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated.
Status & Standing of Sites included in the Trajectory
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ‘’soundness’’, and risks rendering the Plan unrobust.
On this basis, we would object to the Plan if the provision of housing is not adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply.
Key Sites
As set out in previous representations at Preferred Strategy stage, it is considered that the housing supply relies heavily on the delivery of the ‘key sites’ to deliver housing (and meet need) over the Plan period. The total number of housing units attributed to key sites amounts to 2,278, which equates to over 25% of the total provision in the Plan period.
As detailed above, we consider there to be concerns regarding the proposed ‘Timing and Phasing of Sites’ table included in the Housing Trajectory which we consider are not reflective or accurate and will therefore have the effect of delivery start dates being much later into the Plan period than anticipated. The result of this will be that the Plan will be at risk of not delivery the level of housing expected and needed. Moreover, the Housing Trajectory Graph presents an overly ambitious level of housing completions over the Plan period - which the Council consider will be markedly higher than the average levels experienced in the last five years. Again, for the reasons set out above, we consider that these rates of expected completions to have no evidence supporting them, and to be unachievable and unsound.
Insofar as to the removal of the previously proposed site ‘Land at North East Barry’, this site was expected to deliver 900no. units in the Plan period. Following its omission from the housing supply, other sites have been identified, which comprises the inclusion of a new key site (Land at North West Barry), 3no. non-strategic sites, and also affordable housing-led allocations. In terms of the quantum of development attributed to these new sites, this amounts to 659no. dwellings. This is some 250 units less than the 900no. homes that was previously attributed to ‘Land at North East Barry’. Whilst it is appreciated that the number of homes forming part of the existing supply (completions, units with planning permission etc.) have increased since Preferred Strategy stage, there will be a net loss in market housing provision and delivery.
This position is made worse and compounded as a result of accounting for the affordable-led sites in making up the housing supply.
As set out within the Preferred Strategy, these sites are expected to deliver at least 51% affordable housing. These units are not open market units, and will not / cannot contribute to the supply of such housing. These units will contribute to the provision of affordable housing, and will go some way to meeting the acute need for such housing (albeit will not eradicate / address in full the well known and accepted considerable requirement). Accordingly it is considered that these sites should be in addition to the housing supply, as opposed to forming part of the provision. In turn, there would need to be an increase in allocations for non-strategic sites, to ensure that there is sufficient market housing delivery over the Plan period.
Were such changes to be made and introduced, this would achieve and assist realise a more robust and sound housing supply, which will ensure that the identified housing need is met / addressed over the Plan period. Without these changes it is considered that the housing supply is not sufficient, and inevitably, housing need will not be met within the Plan.
St Athan Train Station
As set out in the Preferred Strategy (para A3.29), the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,183no. homes to be delivered in St Athan over the Plan period.
It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales. The focus in the first phase of such improvements across the region is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly,
it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that these sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,183no. homes are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
We therefore consider the Trajectory to be both unrobust and unsound, and therefore, we object to the Trajectory in its current form accordingly.
Geographic distribution of the ‘new’ sites / provision
As a general and overarching comment in respect to the additional sites now included within the Plan, and forming part of the trajectory, (and a matter expanded upon when critiquing each of these sites in the next section to this submission), it is clear and evident that these additional sites have been positioned to settlements that have already, and recently, been attributed significant growth in the preceding Plan and plan period.
Significant allocations (which have also contributed to significant levels of affordable housing) have been realised and built out in locations (such as Wick and Colwinston). Notwithstanding this, two of the additional sites are now proposed for these recently expanded settlements. Given that the purpose of the affordable housing led allocations is to meet unmet affordable housing need, it is questioned why such new allocations are attributed to settlements that have already seen open market and affordable housing provision, as compared to other comparable settlements that have not received any growth whatsoever over a considerable period of time.
It is considered accordingly that the geographic positioning of these allocations is at odds with their underlying purpose - to meet unmet affordable housing need in communities that have seen no provision
Detailed Comments in respect to ‘new’ sites
Other Housing Allocations
Land south of Clive Road, St Athan
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
As set out at the outset of these representations, and whilst we note the findings of the Candidate Sites Assessment at Preferred Strategy Stage (i.e. Suitable for further consideration), we do not consider that the consultation on this site has been undertaken procedurally appropriately or suitably. We therefore consider the consultation on this site is “unrobust” and “unsound”.
As set out previously, the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales, where the focus is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites – given their incompatibility with the core strategy of the RLDP.
Affordable Housing Led Allocations Land at Heol Fain, Wick
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
Candidate Site Stage 2 Assessment (Site Ref. 404)
The findings of the Candidate Site Assessment for this site are noted. We are assuming the reason this site is proposed to be allocated is a product of the site promoters/developers heading the findings stated below, and changing the form of development to be in accord with this:
“A market housing led scheme would not be acceptable, but the site could be reconsidered as a small scale affordable housing led development subject to need and viability at a maximum of 50 dwellings. In accordance with the Settlement Appraisal Review, it is considered that Wick could potentially accommodate limited affordable housing led growth.”
Whilst no clear deficiency exists in respect to the site, it is known that Wick has been subject to significant growth and expansion in recent years – not least by virtue of significant housing allocations in the settlement as part of previous plans.
To evidence this, 35% of the 124 units approved on the ‘Rectory Field, St Brides Road’ site (i.e. circa 43 units as per site allocation ref. MG(47) and PP ref. 2014/01424/FUL) were approved as Affordable Housing units. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Wick, further provision ought to be made in comparable (previously unprovided for) locations, such as Ogmore By Sea.
Land West of Maendy Road, Aberthin
‘Land West of Maendy Road’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however as far as we know from our review, there is no assessment and critique of this site. This site has not been included in the ‘Candidate Assessment at Preferred Strategy Stage’ (October 2023). As such, with an absence of publicly available information, it is not clear how the Council has judged this site against the criteria. This raises questions accordingly in respect to the “soundness” of a site which forms part of the intended housing land supply, and by association the trajectory. Without this, and without being consulted on (as others have been prior to this) we question whether this allocation is “sound” (i.e. its allocation is considered to be “unsound”).
Land North of West Winds Business Park, Fferm Goch
The below sets out the candidate site stage two assessment of ‘Land to north and west of Westwinds Business Park’:
Candidate Site Stage 2 Assessment (Site Ref. 398)
As can be seen above the site was not considered suitable for further consideration with the site scoring negatively (red) in a number of key factors. These include the following:
• Access to Retail;
• Access to Health Services;
• Sustainable Transport- Public Transport;
• Access/ Proximity to services and facilities conclusion;
• Climate Change; and
• Health and Wellbeing.
Given the fact the site scores red in ‘Sustainable Transport – Public Transport’, this shows the site is not served by public transport connections within 800m, as outlined in the key below:
Additionally, Policy SP7 (Sustainable Transport) of the Vale of Glamorgan Preferred Strategy states “New development must support an enhanced transport network that increases the proportion of journeys being undertaken by sustainable travel modes”. Additionally Objective 8 (Promoting Active and Sustainable Travel Choices) states “new development is directed to locations that are or can be accessible by a choice of modes of transport, including walking, cycling, and public transport.”
It is well known residents of affordable housing are statistically less likely to own private vehicles, making access to reliable and frequent public transport essential for ensuring equitable mobility. The provision of public transport infrastructure in close proximity to such developments is therefore a critical component in supporting access to employment, education, healthcare, and other key services, while also promoting sustainable travel patterns and social inclusion.
The site also scores red in Access/Proximity to services, showing the site is greater than 1200m away from key services, as seen in the key below:
In respect of the above, Preferred Strategy 6.40 states the need “To ensure that new development takes place in locations that have the best access to a wide range of services, facilities, and employment opportunities, whilst minimising the need to travel, the distribution of growth is guided by the following settlement hierarchy”. To further highlight the importance of both sustainable transport and proximity to services, the preferred strategy also states the need to “Facilitate the development of adaptable, accessible, well-connected communities that have a strong sense of identity, offer a sustainable range of services and facilities and are equipped with adequate infrastructure”. In addition, Promoting Active and Sustainable Travel Choices outlines to “Promote and encourage the use of sustainable methods of travel, particularly active modes of transport, whilst simultaneously reducing the need to travel”.
In light of the above, this site does not align with the aims and targets set out in the Preferred Strategy as it fails to meet several key development goals set out. It should therefore not be considered suitable to be allocated for future developments. Its inclusion is therefore unsound.
Should this view be concurred with, 22 affordable units will be lost from the proposed affordable 122 units, and ultimately will be lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is removed and/or not delivered as its inclusion is unsound as it does not align with the aims and targets set out in the Preferred Strategy - as it fails to meet several key development goals set out. A “small scale
affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” will therefore not be provided for. This is clearly an issue.
Land to the East of Colwinston, Colwinston
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below:
As outlined above the site was rejected and considered not suitable for further consideration. In fact, and unlike ‘Land at Heol Fain, Wick’ and ‘Land to north and west of Westwinds Business Park’ it was stated that this site “could not be considered as a suitable affordable housing led development site”. Despite this, this site has been outlined as an Affordable Housing Led Allocation. As such, the inclusion of this site is “unsound”.
It is known that Colwinston has been subject to significant housing allocations in the settlement as part of previous plans. To evidence this, 25% of the 64 units (i.e. 16 units) were approved on the site allocation ref. MG2(41) and PP ref.
2014/00242/FUL. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Colwinston, further provision ought to be made in comparable (previously unprovided for) locations, such as Land South of A48, Bonvilston.
Summary of These Representations
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised above in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 7152
Derbyniwyd: 11/03/2026
Respondent ID: 1182
Ymatebydd: Peter Stone Properties Ltd
Asiant : Geraint John Planning Ltd
It is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands.
Amend supporting text.
ANNEX 1
Preface
This Annex sets out the detailed case in support of these representations, and by association the case for allocation of the site.
The representations are structured into the following sections:
1. Response to the Deposit Plan;
2. Comments on specific policies; and
3. A summary of the suitability of the site for development.
SECTION 1. Response to the Deposit Plan
Distribution of Growth
We object to the distribution of growth within the Deposit Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain the majority of housing growth in the Vale over the Plan period, or rather the over-reliance on this defined area, and the associated absence of growth in other parts of the Plan area.
As outlined in our previous representations, the allocation of housing and the location of strategic growth neglects the Rural Vale, and in our view, overprovides in the Strategic Growth Area. For example, with limited housing stock and average house sales at over £800,000 over the last 12 months, there is a clear and established need for new homes in the Bonvilston area, particularly at an affordable level. This is reinforced by the Local Housing Market Assessment that identified a need for over 1,114 new affordable homes per annum over the next five years throughout the county, and 196 units per annum thereafter (average of 502 units per annum over 15 years). Further to this, it is widely known that the rural Vale comprises the majority of the county’s ageing population, which, as a demographic, has and will continue to grow rapidly over the Plan period. This is evident in the ‘Population Change’ chart below – which is taken from the Deposit Plan:
VofG Deposit Plan: Figure 4 Population Change 2011 to 2021
It is clearly the case that younger populations are migrating to other Authorities, where access to housing is typically cheaper and more affordable, whilst more older populations are significantly migrating into the Authority. This trend will result in an extremely unbalanced demographic, given that the working-age population have sought housing elsewhere.
Without a suitable supply of affordable housing delivered over the Plan period, this trend will only worsen. Accordingly, it is not considered that the RLDP takes into account the lack of supply of affordable homes within the rural Vale, as well as increased housing to support the growing ageing population within these areas.
Para 3.19 of the Deposit Plan clearly outlines that affordable housing is required in the short term, in order to meet pressing needs. Specifically, it outlines the following: “There is significant pressure on temporary accommodation in the Vale, for a variety of reasons including increased homelessness presentations… The need for sufficient permanent affordable housing to assist in moving people out of temporary accommodation is critical and the planning system has a vital role in assisting in new affordable housing delivery.”
Accordingly, the distribution of growth within the Authority must be proportionate, to ensure that populations / areas are not left behind where they must seek access to housing elsewhere.
The RLDP Sustainable Growth Strategy sets out 6 objectives. Objective 4 states: “Allowing for small scale affordable housing led development in settlements outside the Strategic Growth Area at a scale proportionate to the size of settlement.” (Page 66)
Para 5.25 states “Therefore, a key part of the strategy is to allow for affordable housing led developments within sustainable primary and minor rural settlements outside of the Strategic Growth Area, at a scale that is appropriate to the size of the community it is serving. An ‘affordable housing led’ scheme is one where a minimum of 50% of the dwellings would need to be affordable, although this could increase to a maximum of 100% if the site is brought forward by a social landlord”.
In terms of the definition / explanation of what the affordable housing-led development sites are seeking to achieve, paragraph 6.132 of the Deposit Plan outlines the following:
“Accordingly, to ensure that new developments respond to the high demand for smaller properties, as identified in the LHMA, priority will be given to affordable homes that are small to medium-sized, typically comprising one to three bedrooms. Representations received from the local community through the RLDP process also highlighted a desire for new housing developments to offer opportunities for accessing smaller market homes. This is particularly relevant in the rural Vale, where housing choices are more limited. Providing smaller, more affordable market homes may assist first-time buyers and enable older residents to downsize to more manageable properties within their local area. Affordable housing-led sites will therefore need to demonstrate that an appropriate range of both affordable and market dwellings has been provided.”
Despite the acknowledgement within this strategic objective, we do not consider that the RLDP goes far enough to meet this objective, nor are its provisions and allocations adequate.
It is considered that this objective is undermined by the allocations set out by the RLDP (not least the absence of allocations in the rural Vale). Notwithstanding the Vision’s clear acknowledgement of the benefit of the growth of the rural Vale, these areas have not been supported through the plan due to the lack of growth which has been attributed to these areas in terms of further housing, employment and sustainable transport. All growth options have been selected on the basis of being in either a Key Settlement, Service Centre Settlement or Primary Settlement, all of which are already sustainable areas served by rail. As a result, it is not clear how this objective can be achieved, without the allocation of further sites within the Minor Rural Settlements, such as Bonvilston. The Vale is characteristically ‘rural’, and as such, there needs to be a stronger emphasis on supporting and delivering new development in order to bolster the rural economy. This includes enabling opportunities to provide employment and business premises within / near to rural settlements, as well as focusing housing growth in these areas to reduce travel time, and promote the use of sustainable transport.
It is considered that the current Strategy does not provide adequately for all residents across the Vale, only those within the Strategic Growth Area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan. This brings into question the “soundness” of the Plan.
The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north (as defined in the RCTCBC LDP). The Minor Rural Settlements to the west are more likely to be supported by job opportunities and employment in Bridgend than further east in Barry or Cardiff. Similarly, those in the north align with, and function in association with, the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north. These settlements are served by existing bus services that provide sustainable modes of travel to key employment locations in and around Bridgend. This is acknowledged in Paragraph 3.3 of the Strategy which states “The greatest number of residents who travel outside of the Vale for work purposes travel to Cardiff followed by Bridgend and Rhondda Cynon Taf, whilst a smaller proportion commute into the Vale from these neighbouring authorities”. The Demographic Evidence (Feb 2023) estimates the Vale as being a net importer of workers from RCT and Caerphilly (Para 3.6) - as shown in Figure 10 in the Preferred Strategy.
The current Strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas - given that Growth has been apportioned in only the Key Service Centre and Primary Settlements. It is considered that this will fail to support and facilitate the current (and any future) employment coming into the Vale, nor will it support any employment which is located outside of the Vale to the West and North. The Growth Option is too heavily reliant on access to railway stations as the key and sole sustainable transport method, whereas access to bus services should also be appropriately assessed and focused on in terms of promoting sustainable development. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural. The delivery and soundness of the Plan is therefore questioned and we continue to object to the spatial growth strategy as set out in the Deposit Plan.
Housing Supply
RLDP Allocations - Key Sites
As set out in representations made throughout the Plan preparation process, we consider that the Plan is too reliant on the delivery of ‘key sites’ to meet the housing need over the Plan period. Specifically, the Plan makes provision for 2,278 units in these Key Sites, which equates to circa 65% of RLDP allocations in the housing supply. The 5 key sites that are allocated in the Deposit Plan are as follows:
• Land at North West Barry – 376no. units;
• North of Dinas Powys – 250no. units;
• Land at Readers Way, Rhoose – 520no. units;
• Land at Church Farm, St Athan – 532no. units; and
• Land to the West of St Athan – 600no. units.
We object to the current housing supply to allocate 2,278no. (65%) of units across strategic sites, as this makes for a risky and unrobust strategy for delivering housing, and in turn, meeting the identified housing need over the Plan period.
As stated in previous representations, there is concern that the proposed timing and phasing of the proposed Key Sites is unrealistic and unrobust, and in turn, undermines the soundness of the Plan, given the heavy reliance on Key Sites delivering new homes across the Plan period. Whilst it is not disputed that the sites would have gone through rigorous assessment to inform their proposed allocation, the timescales for securing planning permission (with all associated conditions discharged) is considered to be unachievable. This is particularly the case for the following timescales that are set out in the Housing Trajectory that underpin the Plan:
• “Time period of pre-application discussions/PAC consultation” – 4 months
• “Time between submission of planning application and determination” – 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” – 4 months
It is considered that the above timescales are fundamentally unrobust, and result in a distorted position of housing sites over the RLDP Plan period. It is not considered that these reflect or are informed by the timescales that are currently being incurred for planning applications submitted for major housing sites across Wales. It is rather the case that such applications would typically be determined 1-2 years following submission, given that there are a wide range of stakeholders involved in the determination of major planning applications – which often adds to the delays associated with the determination of such applications.
It is equally the case that the assumptions in the trajectory are solely based on expected timescales for processing formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission.
It is assumed that these timescales have not considered that such major developments can be subject to the need to undertaking and submitting an Environmental Impact Assessment (EIA), which adds another layer to the determination of any planning application – given the additional considerations that form part of this process. As such, any site subject to EIA would very likely result in further delays extending beyond the timescales set out in the trajectory. Equally, as set out above, the preparation of an application subject to an EIA requires even more detail and assessment, which only further adds to the preparation stage (which has not been factored into as part of the trajectory). Accordingly, it is not considered that the trajectory contains any contingency if any site is required to undertake EIA as part of their application.
For the reasons stated above, it is unlikely that the sites will yield in full, particularly those sites which are expected to deliver housing right up to the final year of the Plan period (‘Land at Readers Way’ and ‘Land to the West of St Athan’). These sites do not allow for any ‘slippage’ should any delays arise through the development management process (which for the reasons set out above, will very likely be the case), and as such, a gap in housing delivery will be brought about as a result of these sites not yielding in full.
Given the proposed ambitious timescales set out for the delivery of the Key Sites, it is considered the housing trajectory is unrobust, and in turn, undermines the soundness of the Plan as a result. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to fully yield given that such sites are subject to less assessment and consideration compared to strategic sites. This would make for a more robust strategy, where a greater number of small to medium sites can deliver housing in the short and medium term of the Plan period, whereas the strategic sites represent a more longer-term strategy to deliver housing – which would then spill into the next Plan period.
Accordingly, we object to the Deposit Plan in its current form, where there is an overreliance on housing need to be met through the delivery of the Key Sites, which we consider to be unrobust, and undermine the integrity and soundness of the Plan. The current strategy of the Plan is at significant risk of not delivering the level of housing expected based on the sites allocated, as least as swifty as identified in the housing trajectory. Should no change be made to the Plan to address the above issues, then it is extremely likely that the Plan would ‘fail’ in meeting the identified housing need.
Windfall Sites
It is noted that the RLDP is made up of the following:
• Existing land supply (3,838 units)
• Windfall sites (1,303 units)
• Allocated sites (3,521 units)
Para 6.69 states that “Analysis of historical delivery of housing indicates that on average small windfall sites (sites of less than 10 dwellings) have provided some 53 dwelling completions per year, and large windfall sites (10 dwellings or greater) contributed on average 80 dwellings per year. Overall, it is projected that windfall sites could contribute a further 1,303 dwellings over the remainder of the plan”.
As set out in our previous representations to the Housing Trajectory, we would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan – which is discussed in greater detail later in this submission. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
St Athan Train Station
The RLDP Sustainable Growth Strategy comprises six key elements, of which the following is set out in respect to the allocation of new housing growth in the Authority:
“3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.”
The strategy outlines that a feasibility study for a station in St Athan had been undertaken in 2022, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ and 80no. units attributed to ‘Former Stadium Site, adjacent to Burley Place’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,263no. homes to be delivered in St Athan over the Plan period.
It is now the case, however, that the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales – as confirmed in the ‘Today, Tomorrow, Together: A vision for rail across Wales and Borders’ (February 2026) recently published by Transport For Wales. This paper acknowledges that a new railway station at St Athan would represent a longer term opportunity, and therefore, will not be delivered in the short term / within the Plan period of the emerging Plan. Equally the Council have not provided any evidence to contradict this, and therefore, it is very unlikely that any new train station will be delivered in St Athan over the Plan period. This brings about significant questions regarding the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,263no. homes (36% of the Plan’s new housing allocations) are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
In terms of the expected delivery of the Key Sites in St Athan, it is noted that the trajectory identifies that for the majority of the Plan period, both sites will be delivering 80no. dwellings per annum on each site (equating to 160no units in total). Whilst these are two separate sites, we seriously question the realistic prospects of the significant number of
homes being built simultaneously on two sites in proximity to one another – given the considerable logistical issues that would be brought about.
Accordingly, it remains that there are serious questions regarding the suitability and acceptability of the proposed allocations at St Athan, which do not accord with the strategy adopted for the RLDP – to focus housing growth on settlements that are supported by railway stations. Moreover, the scale of development proposed at St Athan is also not considered to be proportionate, with a significant number of homes delivered in a location not served by a railway station.
Rolled forward LDP Sites
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current Plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application
submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ’soundness’, and risks rendering the Plan unrobust.
Housing Delivery Rate Assumptions
As set out in our previous representations to the Housing Trajectory consultation, we have considerable concerns in relation to the proposed delivery of the sites identified in the trajectory – which we do not consider are robust or reasonable.
Appendix 1 of the Deposit Plan sets out the development trajectory bar chart – which illustrates the proposed delivery of housing, on a per annum basis, over the Plan period.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
It is our view that the trajectory makes for an unrealistic and unrobust delivery rate of housing, which does not reflect the pattern of housing completions in the Vale of Glamorgan. We therefore have concerns regarding the soundness of the trajectory, not least that there remain significant uncertainties as to the delivery of the Key Sites (as discussed earlier in these representations).
Firstly, the graph / trajectory illustrates a large ‘spike’ in terms of housing delivery in the year 2027-28, which is considered to be a marked and pronounced step change in the rate of delivery. This envisages / relies on a significantly higher rate of delivery than previous years in the Vale of Glamorgan (2021 through 2021 – as depicted by the green columns). It is considered that this level of delivery is unlikely to materialise, not least given prevailing market
circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions from 2021 - 2025 has been approx. 400 - 500 units, however, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100% relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
It is also the case that the anticipated delivery of housing fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2025.
Accordingly, we consider that the housing trajectory, as proposed, is entirely manufactured and unreflective of the past completion rates, as well as the recent published completion rates provided by Welsh Government recently in August 2025. As set out in our previous representations, it has been evidenced that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1: ‘New House Building: April 2024 to March 2025’
As identified in the graph above, in 2024-25, 4,631 new dwellings were completed, which represents 3% fewer than the previous year. This figure represented the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed) The New Housing Pipeline Report Quarter 3, 2025 Report (December 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 7% during the third quarter of 2025, extending the decline seen during the first half of the year. At 45,075, the number of units approved was 34% down on the third quarter of 2024 and the lowest quarterly total since 2012 Q2. At 146,798, the overall number of units approved during the first nine months of 2025 was 25% lower than a year ago.
HBF Graph Illustrating Residential Approvals (2006-2025)
The above graph clearly shows a pronounced downward trend in the number of residential planning approvals over the period, particuarly with a sharp decrease seen since 2020. Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
More recently, the Welsh Government has released its new estimates of housing need (Estimates of Additional Hosing Need: 2025-based – February 2026). The estimates show how many new homes need to be built over the next twenty years to address existing unmet need as well as newly arising need. The figures set out that around 8,700no. new homes a year are needed over the next Senedd term up to 2030 to meet new housing need. Additionally, there is an unmet need for 9,400 affordable homes.
Overall, this represents more than double 2024/25 levels of supply, where just 4,638 new homes were built.
HBF: Estimates of Housing Need
HBF: Actual Delivery vs Estimates of Need
The above graphs unequivocally evidence that historical rates of delivery of housing in Wales has remained low, and moreover, significant numbers of housing need to be allocated in order to meet the estimate of need. It is not
considered that the housing trajectory, in its current form, is robust to meet the housing need over the Plan period, given the uncertainties of the Key Sites, and the level of housing delivery that has been identified for the Plan.
Affordable Housing-Led Sites
HG4 - Rural Affordable Housing Led Sites
Policy HG4 of the Deposit Plan identifies four sites to be allocated as affordable housing-led sites, totalling approximately 122 dwellings within the plan period. Given the target levels of achieving 3,070 affordable dwellings over the course of the Plan period (up to 2036), it is not considered that this policy goes far enough to address the target and level of affordable housing need.
It is noted that the number of units identified for each site relate to the ‘total’ number of units delivered, as opposed to the affordable housing provision. Accordingly, it can be assumed that circa 50% of each allocation will comprise affordable units (given each site is affordable-led), which would equate to a total provision of circa 61no. units. The contribution from the affordable housing-led sites would only equate to 2% of the total need (3,070no. units). Even when coupled with the affordable housing provision from open market sites and 100% exception sites, the total delivery of affordable housing will still be nowhere near enough to meet the overall affordable housing need over the Plan period. Accordingly, it is considered that inadequate provision has been made for such sites – not least given that 3 of the 4 allocated affordable housing-led sites are located west of Cowbridge.
Insofar as to the sites chosen and allocated are concerned, it is clear from reviewing the Stage 1 and Stage 2 Candidate Site Assessment that the allocated sites HG4(1) – (4) were not considered acceptable due to being outside the strategic growth areas, and were considered to be unacceptable intrusions into the open countryside. After being resubmitted as affordable housing-led sites, the sites were allocated, some with a smaller area in order to accommodate less dwellings in total.
The sustainable credentials of the sites allocated is not disputed, and it is acknowledged that these minor rural settlements have the ability to accommodate further growth, in the form of affordable-led housing allocations. However, it is considered that Land South of A48, Bonvilston (Site ID: 435 / 3857) should also form an allocation as part of this policy, given its high sustainability credentials and its appropriate location to accommodate a suitable level of development. Please refer to the previous representations made to the Housing Trajectory Consultation (dated 17th October) for further, more detailed comments regarding the above sites.
The LHMA 2023 shows that there is a need for 77 affordable homes in the St Nicholas & Llancarfan housing market area (which Bonvilston is located within), and a need for 242 affordable homes in the Wenvoe housing market area. As such, there is an identified need for affordable housing in this area, something which the site could address through an allocation.
Securing further delivery of Affordable Units
As set out above, it can be assumed that the affordable housing-led allocated sites only provide 61no. affordable dwellings, which comprise 4no. allocated sites that are expected to deliver approximately between 20 – 50 dwellings (including both affordable and market housing). However, the RLDP sets a target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4% of the target provision and will only make provision for 2% of the targeted number. We would therefore object to the sites included
within Policy HG4 and would suggest that more sites should be allocated as part of the policy in order to secure delivery of a higher number of affordable housing units to meet the target.
Whilst it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, as set out above in these representations, there is serious concern regarding the deliverability of these sites, which would result in a significant gap of affordable housing delivered.
A greater number of affordable housing-led sites allocated would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in affordable housing need being unmet, with demand continuing to outstrip supply.
Previous representations to the Preferred Strategy (dated 14th February 2024) provided comment on the sustainability scoring of Bonvilston and the proposed site. As outlined within these representations, it is considered that the site (ID 435 / 3857) represents a sustainable, deliverable and acceptable site. This proposed allocation is situated in proximity to Cowbridge, Culverhouse Cross and Cardiff, which comprise all key services. Given that the site is located within 4 miles of both Cowbridge and St Nicholas, the site is within a maximum 20-minute bus journey of the following key services:
• Cowbridge Comprehensive School;
• St Nicholas Primary School;
• Cowbridge Health Centre; and
• Cowbridge town centre for various Retail Services.
Accordingly, the settlement of Bonvilston represents an acceptable location to allocate an affordable housing-led site, given the access to existing services and facilities that would serve future residents of the site.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of Bonvilston, support the surrounding settlements, and the Plan area as a whole. As such, the site should be considered further.
Comments on Specific Policies
HG5 - Affordable Housing Exception Sites
Given the unmet need and extant backlog of affordable housing, as identified within the LHMA (2023), it is noted that an Affordable Housing Exception Sites policy has been adopted in order to assist in the delivery of affordable housing. Policy HG5 sets out the specific criteria where proposals for 100% small scale affordable housing developments will be permitted outside settlement boundaries. The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
That said, it is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands. Therefore, the proposed amendments to Para 6.140 are outlined below in red:
6.140 “For the purposes of this policy, ‘small-scale’ will generally mean no more than around 10 dwellings on sites adjoining Minor Rural Settlements. In Primary Settlements outside the Strategic Growth Area, proposals for more than 10 dwellings may be acceptable where required to meet a specific need and where the number of dwellings is proportionate to the size of the settlement. In assessing the scale and extent of any proposed local needs housing, consideration should also be given to affordable housing already planned in the ward or nearby area, including sites
with existing planning permissions and those allocated in the RLDP. The size and type of affordable housing proposed should reflect the identified local need in the area.”
The above suggested wording would achieve a more flexible policy, which would allow for a variety of scaled applications to secure planning permission for solely 100% affordable housing across the Authority area. This greater flexibility would enable the policy to make a significant contribution towards meeting the affordable housing need – which, as set out earlier is in considerable need.
SECTION 3. Suitability of the site for development
The site promoter objects to the overall assessment of the site, in that it is not considered suitable for further development in the Plan. The promoted site has undergone extensive scrutiny and appraisal at a high level to ascertain the qualities of the site, in light of all identified material considerations which relate to the proposals.
The delivery of the site will yield much needed housing (including Affordable housing) and contribute to the overall supply in the new Plan period, whilst making effective use of a suitably located site for residential development.
Moreover, as set out in ‘Annex 2’ of our representations, the site has overcome the ‘constraints’ set out in the Candidate Site Assessment undertaken for the site, which demonstrates that the proposal is both acceptable and deliverable.
Deliverability of the Site
In summary, the site seeks to deliver the following key elements:
• In summary, the opportunity of the site seeks to deliver:
• Residential development comprising up to 25 dwellings, with at least 50% affordable housing in accordance with Policy SP2,
• Highways infrastructure within the site;
• Upgraded access to the site;
• Strong legible pedestrian and cycle connections throughout the site and with the existing settlement;
• Green Infrastructure; and
• Sustainable Drainage Systems (SuDS).
SUMMARY AND CONCLUSIONS
In summary, the site promoters:
• Object to the distribution of growth proposed for the Plan area, with a more balanced and equitable distribution of housing sites required in order to meet the identified housing need;
• Object to the level of growth identified for the Plan period;
• Object to the housing trajectory that underpins the delivery of housing within the Plan period – which is considered to be unrealistic and unrobust, leading to serious uncertainty regarding the “soundness” of the Plan;
• Object to the over-reliance on Key Sites and Rolled Forward Sites in making up the Plan’s housing land supply;
• Object to the scale and timing of delivery of sites in / around St Athan – all of which are predicated on railway station provision which will not be realised in the Plan period;
• Object to the under-provision of sites under Policy HG4 – Rural Affordable Housing-Led sites, not least given their extremely limited contribution to the targeted need for affordable housing;
• Object to the current wording of the HG5 Policy ‘Affordable Housing Exception Sites’ which requires greater flexibility to play an important role in delivery much-needed affordable homes across the Authority; and
• Object the Council’s assessment that the site is not considered suitable for development.
The site and proposals are consistent with the RLDP strategy, other Vale of Glamorgan strategies, and the requirements of Planning Policy Wales and Future Wales. It will make a significant contribution to the Vale’s identified housing requirement in the RLDP period and will provide for a wide range of uses that will support the wider community whilst embodying principles relating to placemaking and the well-being of future generations.
The site has no fundamental constraints and has the ability to deliver significant economic, social and environmental benefits for the benefit of future residents and the existing local community. The site is demonstrated to be viable, being able to deliver policy-compliant levels of affordable housing and given its location within a strong market area, will benefit from high delivery rates.
ANNEX 2
SECTION 4. A summary of the suitability of the site for development including a Response to the Candidate Site Assessment
This section of the overall representations to the Deposit Plan is to respond to, and address, the Council’s assessment of the site.
While the issues the Council have raised in their assessment of the site have been addressed and discussed within the representations made at the Preferred Strategy stage of the Plan, a similar ‘scoring’ exercise has been undertaken as part of the evidence base for the Deposit Plan. As such, it is still pertinent to consider and respond to the Council’s assessment of the site as part of these representations
The Detailed Site Assessment for Land South of the A48, Bonvilston (Site ID: 3857) sets out that the position of the site at the Deposit Stage is as follows:
“Notwithstanding the amendment from a market led to an affordable housing led scheme (original CS 435), the other reasons why the site was previously discounted still remain.
The development would have an adverse impact on the character and setting of the Bonvilston Conservation Area. Development of the site would require major highway mitigation works to enable safe vehicular access on to the A48.
The Predictive ALC Maps indicates that site is Grade 2 Best and Most Versatile Land. Development of the site would lead to the loss of BMV land. BMV land should only be developed if there is an overriding need for the development and either previously developed land or land is lower agricultural grades is unavailable. There is housing land available within the ward of St Nicholas and Llancarfan that can support the delivery of affordable housing.”
Conservation Area
In terms of the assertion that “The development would have an adverse impact on the character and setting of the Bonvilston Conservation Area, this is strongly disputed.
Whilst it is acknowledged that the site lies within the Bonvilston Conservation Area, the conclusion that it would be adversely affected is not considered to be accurate. Firstly, the site as it currently stands, consists of an open field. This does not match the conservation area which is characterised primarily by residential dwellings of varying densities, and as such, it is considered that development of the site with sensitively designed buildings would enhance as opposed to harming its surroundings.
Secondly, the large residential development to the north of the site, ‘Land at Sycamore Cross’ ref. 2015/00960/FUL encroaches on the Bonvilston Conservation area but was deemed acceptable by the LPA. Although not all of the site is within the Conservation Area, it’s encroachment and presence adjoining and surrounding a large proportion of the area is considerable and was deemed acceptable by Officers in 2017. Given this, a development at the Land South of the A48 should be deemed acceptable, as it follows the same principles albeit at a much smaller scale.
Highways
As for the statement that “Development of the site would require major highway mitigation works to enable safe vehicular access on to the A48”, this is also strongly disputed.
The site is located immediately adjacent to the adopted highway where it is proposed to upgrade and enhance the existing gated access point. Due to the existing access point, it is not considered that ‘major’ highway mitigation works would be needed, rather this would be enhanced and improved as part of the proposed development. Furthermore, given the nature of the road, with long views extending in both directions, it is anticipated that appropriate visibility
splays could be achieved to enable safe access and egress. As such, it is considered that the site would achieve appropriate highway access within the need for “major” highway mitigation works.
Agricultural Land Classification
The Detailed Site Assessment also sets out that “The Predictive ALC Maps indicates that site is Grade 2 Best and Most Versatile Land. Development of the site would lead to the loss of BMV land. BMV land should only be developed if there is an overriding need for the development and either previously developed land or land is lower agricultural grades is unavailable.” This is strongly disputed.
A review of the Agricultural Land Classification Predictive Map indicates that the site lies primarily within ‘Grade 2: Very good quality agricultural land’ but no Grade 1 land is present. Further assessment and tests to establish the quality would therefore be undertaken in due course to confirm the quality of the land. However, it is not considered that it would be suitable to farm in any event given the location immediately adjoining existing residential development and the fact that it is within private ownership. Overall, given that the site is relatively small with a gross area of 0.88 hectares, it is not considered that its development would result in a detrimental or significant loss of agricultural land – not least given that site is not capable of beneficial agricultural production due to its limited size.
Housing / Housing Land
Further to the above, it is also set out that “There is housing land available within the ward of St Nicholas and Llancarfan that can support the delivery of affordable housing”, however, this is not considered to be entirely accurate.
The LHMA 2023 shows that there is a need for 77 affordable homes in the St Nicholas & Llancarfan housing market area and a need for 242 affordable homes in the Wenvoe housing market area. This need has not been met through the allocations of sites within the RLDP, nor has it been met through outstanding commitments.
As outlined in Annex 1, it can be assumed that the affordable housing-led allocated sites will only provide for 61no. affordable dwellings within the Rural Vale, comprising 4no. sites that are expected to deliver approximately 20 – 50 dwellings (including both affordable and market housing). However, the RLDP sets a target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4% of the target provision and will only make provision for 2% of the targeted number. Therefore, more sites should be allocated in order to secure the delivery of a higher number of affordable housing units to meet the target.
As set out within Annex 1, it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, however, there is serious concern regarding the deliverability of these sites, which would result in a significant gap in the total affordable housing that is delivered. Therefore, allocating a greater number of affordable housing-led sites would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in the both the overall affordable housing need, and the need for the St Nicholas & Llancarfan housing market area, being unmet, with demand continuing to outstrip supply.
The LHMA 2023 sets out the existing stock and planned supply of affordable housing over the next 5 years (up until 2028). This assessment found that the housing market area of St Nicholas & Llancarfan has a committed supply of 4no. one beds, 11no. two beds, and 3no. three beds, with 2 no. three beds as expected re-lets. The assessment also identifies a committed supply of 39no. units for intermediate housing.
The LHMA also sets out the existing stock and planned supply for Wenvoe, identifying the committed supply of social rent homes to be 12no. one beds, 11no. two beds, and 5no. three beds, with 7no. one beds and 8no. two beds as expected re-lets. There is no committed supply for intermediate housing in Wenvoe.
It should be noted that the development of ‘Land East of Nicholas’ (Campbell Court and Cae Newydd), has now been completed, and as such, can not form part of the housing land available. The latest Pre-Application Response for the site subject to these representations (Land South of the A48, Bonvilston) accounted for the development of the site in
St Nicholas, stating that “even after the developments at St Nicholas and Culverhouse Cross, there was the need in the Wenvoe ward for 1 Bed 71, 2 Bed 49, 3 Bed 29, 4 Bed 7, 5 Bed 5, Total 161".
It should also be noted that there are existing commitments within the Bonvilston area (‘Land to the east of Bonvilston’), however, the deliverability of the existing commitment is seriously questioned. Application Ref. 2015/00960/FUL was approved in July 2017, with the Housing Land Supply and Housing Trajectory Report (December 2025) confirming that of the total 120 units permitted, only 40 had completed by 1st April 2025, with the remaining 80 units not started by this same date. Of the 80 units not started, 25 units are affordable homes.
It is well known that phase 1 of the development at ‘Land to the east of Bonvilston’ has faced difficulties which has led to the development remaining incomplete. This does of course put into question the overall deliverability of the site, and raises concerns about the units that were, and still are, required within the Bonvilston area.
The allocation of the site promoted herein would not only help in the short term in meeting the overall affordable housing target for the Plan, but would also assist in meeting the unmet needs of affordable housing within Bonvilston – not least given the serious concern regarding the deliverability of the committed supply of housing within the St Nicholas & Llancarfan housing market area.
For the reasons set out above, and in light of the information provided within the LHMA 2023 and the Housing Land Supply and Housing Trajectory Report (December 2025), it is evident that there is considerable need for affordable housing within Bonvilston, and accordingly, the housing market areas of St Nicholas & Llancarfan, and Wenvoe. There have not been any sites allocated to assist within meeting the local need, and more sites should be allocated in order to secure delivery of a higher number of affordable housing units to meet the overall target of the Plan.
The contention that “There is housing land available within the ward of St Nicholas and Llancarfan that can support the delivery of affordable housing” is therefore strongly disputed – not least given that there is a clear and evident need to allocate more affordable housing-led sites in order to meet the target set out in the Plan.
Interim Summary
In summary, it is considered that the site subject to these representations would not have an adverse impact on the character and setting of the Bonvilston Conservation Area, nor would major highway mitigation works be required to enable safe vehicular access on to the A48. Moreover, it is considered that the site’s classification as BMV Agricultural Land does not pose a fundamental constraint to development – as the site represents a relatively small parcel with a gross area of 0.88 hectares, which is not capable of beneficial agricultural production due to its limited size.
There is also a considerable need for the affordable housing in Bonvilston and the housing market area of St Nicholas & Llancarfan. The site promoted herein would assist in meeting these local needs and should be allocated accordingly.
Candidate Site Assessment
The Detailed Site Assessment undertaken by the LPA includes a summary and assessment of the ‘scoring’ system used at the Preferred Strategy stage. A comparison between the site assessments undertaken at both the Preferred Strategy stage and Deposit Plan stage is provided overleaf for reference.
Site Assessment at Preferred Strategy Stage Site Assessment at Deposit Plan Stage
As demonstrated above, there has only been one change to the scoring attributed to the site, this being a change from ‘red’ to ‘amber’ for ‘Developer Interest’. Detailed submissions were made on the previous assessment undertaken by the Council at Preferred Strategy stage, and as such, should be read in conjunction with these representations accordingly (see Appendix B).
Whilst detailed submissions were made on the previous assessment, it is considered pertinent for the scoring of the key criteria’s to be addressed as part of these representations. As such, these have also been discussed below.
Developer Interest
As set out above, the Detailed Site Assessment for ‘Developer Interest’ has changed from ‘red’ to ‘amber’. The assessment methodology for this section of the assessment has been extracted below for reference.
As set out above, ‘amber’ refers to there being no development interest identified at this stage, however, there is evidence to indicate that the site is being actively promoted by the owners.
The representations made to the Preferred Strategy (Appendix B) sets out that whilst the site does not yet have an agreement with a developer to take on the land, it is considered that this would be achieved should the site be allocated, and planning permission granted. Newydd Housing association have been engaged previously and had agreed to take the site forward as a 100% affordable scheme, albeit is also considered that they could take on the affordable units as part of a mixed tenure scheme.
In addition to Newydd, the site promoter has also received an offer from a private social housing provider who would be prepared to support the site as a mixed tenure scheme.
This position has not changed since the Preferred Strategy stage, and is considered that there is continued developer interest for the site. This is not considered to change at any point – not least given the discussions held between the owners of the site in questions and developers of interest.
Environmental and Physical Constraints
As set out at the Pre-Application Stage. the site underwent a Preliminary Ecological Appraisal in September 2022 which identified that whilst some precautionary measures were recommended in terms of protecting priority habitats and reptiles, the site is not fundamentally constrained from development on ecological terms. Given this, it is considered that further ecological surveys would be undertaken at the planning stage to inform any development proposals and ensure the safeguarding of the natural environment.
Access to Key Services (Retail, Primary Schools, and Health Services) and to Services and Facilities
As set out within the representations made to the Preferred Strategy, the site is located within a maximum of a 20-minute bus journey to a version of every key service listed, due to the proximity of the site to settlements such as Cowbridge, Culverhouse Cross and St Nicholas. Due to the availability of frequent bus services, and active travel links, these key services are readily available to access for any residents within Bonvilston without the need to travel by car.
To reiterate, the site ‘Land South of the A48, Bonvilston’ is situated in proximity to Cowbridge, Culverhouse Cross and Cardiff, which comprise all key services. Concluding this allocation as ‘unsustainable’ in regard to ‘availability of local facilities in and around settlements’ is not accurate. Given that the site is located within 4 miles of both Cowbridge and St Nicholas, the site is within a maximum 20-minute bus journey of the following key services:
• Cowbridge Comprehensive School;
• St Nicholas Primary School;
• Cowbridge Health Centre; and
• Cowbridge town centre for various Retail Services.
It should also be noted that Bonvilston contains a number of facilities within a short and level walking distance of the site, including the village shop and Café, as well as the Red Lion Public House.
Given the accessibility of the site to other settlements, and the fact that these are made accessible by bus and active travel routes, it is considered that the site should be concluded as sustainable in regard to access to key services.
Summary and Conclusion
As evidenced above, and within the representations made to the Preferred Strategy (Appendix B), there are no fundamental constraints at, or associated with the site, that would preclude the site coming forward for development in the RLDP period.
To conclude, the settlement, location, and site, are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of the Vale of Glamorgan.
Summary of These Representations
In short, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised below in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Preface
This Submission sets out the detailed case in support of these representations. The representations are structured as follows:
1. Procedural Consultation Matters;
2. Timing Assumptions underpinning the Trajectory;
3. Housing Delivery Rate Assumptions;;
4. Status & Standing of Sites included in the Trajectory;
5. Key Sites;
6. St Athan Train Station;
7. Geographic distribution of the ‘new’ sites / provision;
8. Detailed comments in respect to ‘new’ sites;
9. Conclusions Procedural Consultation Matters
Firstly, we do not consider that the consultation on the Housing Trajectory information has been procedurally undertaken appropriately or suitably.
Only 14 days have been afforded to parties to make representations on the information provided. This is despite new sites being introduced (at this late stage) i.e. Land South of Clive Road (identified in Table 4), as well as a number of affordable housing led housing sites being introduced (i.e. those outlined in Table 5). This does not provide an adequate process or timescale for objectors to scrutinise the published content, and to make comments on sites which have been presented for the first time at a late stage in the process.
As part of these representations, we will be making brief comment on the sites which have not been previously consulted upon, namely:
Other Housing Allocations
• Land south of Clive Road, St Athan;
Affordable Housing Led Sites
• Land at Heol Fain, Wick;
• Land west of Maendy Road, Aberthin;
• Land Noth of West Winds Business Park, Fferm Goch; and
• Land to the East of Colwinston.
It is considered necessary to comment on these sites, given that they form an important and critical part of the housing trajectory, and by association in the Council and Plan reaching their targets. Moreover, these sites have not been consulted on previously. Accordingly we consider it necessary to pass comment on these in order to ensure that the consultation is fair and robust.
As well as limited time given to comment on the information contained within the Housing Trajectory, the LPA have failed to set up a Housing Stakeholder group to agree and discuss the trajectory information and data – with the cover email to the consultation (dated 3rd October 2025) stating “it is considered that it would be the best use of stakeholder time to conduct this engagement via email, particularly as many of the forecasts have been developed in consultation with site promoters including developers and their agents”.
We submit that the stakeholder consultation has not been a transparent nor robust consultation process, given that the Development Plans Manual states at Para 5.66 “A housing trajectory must be prepared to support the Deposit Plan. In order to generate a housing trajectory and associated phasing tables it will be necessary for LPAs to engage with stakeholders through a Housing Stakeholder Group. This will ensure that the timing and phasing of sites is robust and based on up to date information”. Given that this has not taken place, we would raise fundamental concerns that the consultation of the trajectory has not adequately taken place as per the relevant guidance. Afterall, the guidance stresses that a Group should be formed as a necessity. Accordingly, there has not been an adequate process and opportunity to review and comment on the information published, including in respect to the other sites have been introduced at this late stage.
Timing Assumptions underpinning the Trajectory
The assumed and factored in timescales of the various stages of bringing forward sites i.e. the pre-application stage, the planning application process, and the discharge of condition process outlined in the trajectory are considered to be fundamentally inaccurate, and result in a distorted position of the delivery of housing sites over the RLDP Plan period. The assumptions are far too ambitious, and without evidence / are not comparable with the timescales being incurred in processing such stages at the Development Management stage(s).
Specifically, we raise objection to the following timescales which are considered to be extremely ambitious and unrealistic:
• “Time period of pre-application discussions/PAC consultation” = 4 months
• “Time between submission of planning application and determination” = 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” = 4 months
In our experience, having submitted a significant number of major and other applications for housing and other forms of development in the last 1-2 years to the Council (and elsewhere in Wales and England), it is extremely unlikely that major applications can be submitted, and planning permissions granted, within the timeframes assumed by the trajectory. A wide range of stakeholders are also involved in the determination of major planning applications, which often adds to the delays associated with the determination of such applications. We would therefore consider that a time period of “6 months” given to all major applications in the housing trajectory is not feasible, and distorts the trajectory timescales for the remaining Plan period.
The assumptions in the trajectory are also solely based on expected timescales for the processing of formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission (i.e. pre-application enquiry submissions / planning application / discharge of condition details etc). When factored in these will elongate the timescales for bringing forward schemes considerably.
Moreover, it is common practice for larger housing sites and major applications to have a range of pre-commencement conditions attached to a permission once granted. Again, we would raise concerns with the timescales indicated in the trajectory related to this part of the planning process. It is highly unusual and questionable that any technical work required by these conditions (usually relating to drainage and highways matters) would be instructed, completed and submitted within 2 months, and for these to then be signed off / approved in a further 2 months. There are also other technical matters and necessary approvals falling outside of, and over and above, the planning system, such as SAB, s.106, s.38 and s.278 agreements, timescales for which have not been accounted for – and all of which are rarely completed within “4 months” as indicated.
It is therefore highly doubtful that the timescales legislated for in the trajectory for the various stages pre-construction are achievable – with no information about these proposed timescales outlined within the supporting text of the Housing Trajectory. We would therefore raise considerable concerns and objections to these as they stand without full evidence to fully show how these have been calculated, and without there being considerable (and necessary) adjustment to the timescales indicated and factored in.
We would therefore object to the timescales indicated in the ‘Timing and Phasing of Sites’ table, given that the delivery start dates will be pushed back further into the Plan period. Accordingly, and as a result, the Plan is at risk of not delivering the level of housing expected based on the sites allocated, at least as swiftly as is set out in the trajectory.
Housing Delivery Rate Assumptions
We would also raise considerable doubt over the proposed delivery of the sites identified in the Housing Trajectory - which we do not consider are robust or reasonable.
The development trajectory bar chart set out in the consultation material (extracted below) anticipates and legislates for a number of critical events and circumstances – all of which are considered to be unrobust and unsound.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
Firstly, a large ‘spike’ (material increase) in housing delivery is factored in to take place in 2027 – 2028. This is a marked and pronounced step change in the rate of delivery, and envisages / relies on a significantly higher rate of delivery than previous years in The Vale of Glamorgan (2021 through 2025 - as depicted by the green columns). This is considered extremely unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions in The Vale of Glamorgan from 2021 - 2025 has been approx. 400 - 500 units. However, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100%relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
The anticipated delivery of housing also fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the
period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2015.
To summarise, we consider the defined position to be wholly manufactured and unreflective of the past completion rates, as well as the recently published completion rates provided by Welsh Government recently in August 2025. In the Welsh Government Statistics Document ‘’New House Building: April 2024 to March 2025’, information on the number of new dwellings started is provided, where building has commenced and those completed for April 2024 to March 2025. Figure 1 provides a graph showing starts in the last 10 years, and it is clear that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1:.‘New House Building: April 2024 to March 2025’
In 2024-25, 4,631 new dwellings were completed, 3% fewer than in the previous year. This was the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed). The New Housing Pipeline Report Quarter 2, 2025 Report (September, 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 6% during the second quarter of 2025, continuing the decline of approval during the first three months of the year. Wales saw one of the largest declines in the UK in approvals with a decline of 29%.
Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
The Home Building Sector Skills Plan (Aug 2025) published by the HBF also identified the following issues with the workforce to bring forward built development in Wales:
• “A shortfall in numbers entering roles from the education system;
• An ageing workforce: 25% of the home building workforce is aged over 50, meaning the sector is facing an impending retirement cliff edge;
• Challenges attracting a wider talent pipeline into the sector;
• A lack of understanding of critical future skills needed, and direction from the Future Homes Standard; and
• Output within the sector fluctuating with demand and economic pressures, leading to additional pressures in recruitment and training”.
It is not considered that in the next 1-2 years that any of these issues can or will be substantially corrected – at least sufficiently so to allow for, and enable, the planned delivery rates of new housing completions to be as high as < > 1,000 homes in one year (and for four consecutive years at that).
We would therefore object to the proposed numbers of completion expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated.
Status & Standing of Sites included in the Trajectory
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ‘’soundness’’, and risks rendering the Plan unrobust.
On this basis, we would object to the Plan if the provision of housing is not adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply.
Key Sites
As set out in previous representations at Preferred Strategy stage, it is considered that the housing supply relies heavily on the delivery of the ‘key sites’ to deliver housing (and meet need) over the Plan period. The total number of housing units attributed to key sites amounts to 2,278, which equates to over 25% of the total provision in the Plan period.
As detailed above, we consider there to be concerns regarding the proposed ‘Timing and Phasing of Sites’ table included in the Housing Trajectory which we consider are not reflective or accurate and will therefore have the effect of delivery start dates being much later into the Plan period than anticipated. The result of this will be that the Plan will be at risk of not delivery the level of housing expected and needed. Moreover, the Housing Trajectory Graph presents an overly ambitious level of housing completions over the Plan period - which the Council consider will be markedly higher than the average levels experienced in the last five years. Again, for the reasons set out above, we consider that these rates of expected completions to have no evidence supporting them, and to be unachievable and unsound.
Insofar as to the removal of the previously proposed site ‘Land at North East Barry’, this site was expected to deliver 900no. units in the Plan period. Following its omission from the housing supply, other sites have been identified, which comprises the inclusion of a new key site (Land at North West Barry), 3no. non-strategic sites, and also affordable housing-led allocations. In terms of the quantum of development attributed to these new sites, this amounts to 659no. dwellings. This is some 250 units less than the 900no. homes that was previously attributed to ‘Land at North East Barry’. Whilst it is appreciated that the number of homes forming part of the existing supply (completions, units with planning permission etc.) have increased since Preferred Strategy stage, there will be a net loss in market housing provision and delivery.
This position is made worse and compounded as a result of accounting for the affordable-led sites in making up the housing supply.
As set out within the Preferred Strategy, these sites are expected to deliver at least 51% affordable housing. These units are not open market units, and will not / cannot contribute to the supply of such housing. These units will contribute to the provision of affordable housing, and will go some way to meeting the acute need for such housing (albeit will not eradicate / address in full the well known and accepted considerable requirement). Accordingly it is considered that these sites should be in addition to the housing supply, as opposed to forming part of the provision. In turn, there would need to be an increase in allocations for non-strategic sites, to ensure that there is sufficient market housing delivery over the Plan period.
Were such changes to be made and introduced, this would achieve and assist realise a more robust and sound housing supply, which will ensure that the identified housing need is met / addressed over the Plan period. Without these changes it is considered that the housing supply is not sufficient, and inevitably, housing need will not be met within the Plan.
St Athan Train Station
As set out in the Preferred Strategy (para A3.29), the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,183no. homes to be delivered in St Athan over the Plan period.
It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales. The focus in the first phase of such improvements across the region is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly,
it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that these sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,183no. homes are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
We therefore consider the Trajectory to be both unrobust and unsound, and therefore, we object to the Trajectory in its current form accordingly.
Geographic distribution of the ‘new’ sites / provision
As a general and overarching comment in respect to the additional sites now included within the Plan, and forming part of the trajectory, (and a matter expanded upon when critiquing each of these sites in the next section to this submission), it is clear and evident that these additional sites have been positioned to settlements that have already, and recently, been attributed significant growth in the preceding Plan and plan period.
Significant allocations (which have also contributed to significant levels of affordable housing) have been realised and built out in locations (such as Wick and Colwinston). Notwithstanding this, two of the additional sites are now proposed for these recently expanded settlements. Given that the purpose of the affordable housing led allocations is to meet unmet affordable housing need, it is questioned why such new allocations are attributed to settlements that have already seen open market and affordable housing provision, as compared to other comparable settlements that have not received any growth whatsoever over a considerable period of time.
It is considered accordingly that the geographic positioning of these allocations is at odds with their underlying purpose - to meet unmet affordable housing need in communities that have seen no provision
Detailed Comments in respect to ‘new’ sites
Other Housing Allocations
Land south of Clive Road, St Athan
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
As set out at the outset of these representations, and whilst we note the findings of the Candidate Sites Assessment at Preferred Strategy Stage (i.e. Suitable for further consideration), we do not consider that the consultation on this site has been undertaken procedurally appropriately or suitably. We therefore consider the consultation on this site is “unrobust” and “unsound”.
As set out previously, the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales, where the focus is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites – given their incompatibility with the core strategy of the RLDP.
Affordable Housing Led Allocations Land at Heol Fain, Wick
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
Candidate Site Stage 2 Assessment (Site Ref. 404)
The findings of the Candidate Site Assessment for this site are noted. We are assuming the reason this site is proposed to be allocated is a product of the site promoters/developers heading the findings stated below, and changing the form of development to be in accord with this:
“A market housing led scheme would not be acceptable, but the site could be reconsidered as a small scale affordable housing led development subject to need and viability at a maximum of 50 dwellings. In accordance with the Settlement Appraisal Review, it is considered that Wick could potentially accommodate limited affordable housing led growth.”
Whilst no clear deficiency exists in respect to the site, it is known that Wick has been subject to significant growth and expansion in recent years – not least by virtue of significant housing allocations in the settlement as part of previous plans.
To evidence this, 35% of the 124 units approved on the ‘Rectory Field, St Brides Road’ site (i.e. circa 43 units as per site allocation ref. MG(47) and PP ref. 2014/01424/FUL) were approved as Affordable Housing units. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Wick, further provision ought to be made in comparable (previously unprovided for) locations, such as Ogmore By Sea.
Land West of Maendy Road, Aberthin
‘Land West of Maendy Road’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however as far as we know from our review, there is no assessment and critique of this site. This site has not been included in the ‘Candidate Assessment at Preferred Strategy Stage’ (October 2023). As such, with an absence of publicly available information, it is not clear how the Council has judged this site against the criteria. This raises questions accordingly in respect to the “soundness” of a site which forms part of the intended housing land supply, and by association the trajectory. Without this, and without being consulted on (as others have been prior to this) we question whether this allocation is “sound” (i.e. its allocation is considered to be “unsound”).
Land North of West Winds Business Park, Fferm Goch
The below sets out the candidate site stage two assessment of ‘Land to north and west of Westwinds Business Park’:
Candidate Site Stage 2 Assessment (Site Ref. 398)
As can be seen above the site was not considered suitable for further consideration with the site scoring negatively (red) in a number of key factors. These include the following:
• Access to Retail;
• Access to Health Services;
• Sustainable Transport- Public Transport;
• Access/ Proximity to services and facilities conclusion;
• Climate Change; and
• Health and Wellbeing.
Given the fact the site scores red in ‘Sustainable Transport – Public Transport’, this shows the site is not served by public transport connections within 800m, as outlined in the key below:
Additionally, Policy SP7 (Sustainable Transport) of the Vale of Glamorgan Preferred Strategy states “New development must support an enhanced transport network that increases the proportion of journeys being undertaken by sustainable travel modes”. Additionally Objective 8 (Promoting Active and Sustainable Travel Choices) states “new development is directed to locations that are or can be accessible by a choice of modes of transport, including walking, cycling, and public transport.”
It is well known residents of affordable housing are statistically less likely to own private vehicles, making access to reliable and frequent public transport essential for ensuring equitable mobility. The provision of public transport infrastructure in close proximity to such developments is therefore a critical component in supporting access to employment, education, healthcare, and other key services, while also promoting sustainable travel patterns and social inclusion.
The site also scores red in Access/Proximity to services, showing the site is greater than 1200m away from key services, as seen in the key below:
In respect of the above, Preferred Strategy 6.40 states the need “To ensure that new development takes place in locations that have the best access to a wide range of services, facilities, and employment opportunities, whilst minimising the need to travel, the distribution of growth is guided by the following settlement hierarchy”. To further highlight the importance of both sustainable transport and proximity to services, the preferred strategy also states the need to “Facilitate the development of adaptable, accessible, well-connected communities that have a strong sense of identity, offer a sustainable range of services and facilities and are equipped with adequate infrastructure”. In addition, Promoting Active and Sustainable Travel Choices outlines to “Promote and encourage the use of sustainable methods of travel, particularly active modes of transport, whilst simultaneously reducing the need to travel”.
In light of the above, this site does not align with the aims and targets set out in the Preferred Strategy as it fails to meet several key development goals set out. It should therefore not be considered suitable to be allocated for future developments. Its inclusion is therefore unsound.
Should this view be concurred with, 22 affordable units will be lost from the proposed affordable 122 units, and ultimately will be lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is removed and/or not delivered as its inclusion is unsound as it does not align with the aims and targets set out in the Preferred Strategy - as it fails to meet several key development goals set out. A “small scale
affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” will therefore not be provided for. This is clearly an issue.
Land to the East of Colwinston, Colwinston
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below:
As outlined above the site was rejected and considered not suitable for further consideration. In fact, and unlike ‘Land at Heol Fain, Wick’ and ‘Land to north and west of Westwinds Business Park’ it was stated that this site “could not be considered as a suitable affordable housing led development site”. Despite this, this site has been outlined as an Affordable Housing Led Allocation. As such, the inclusion of this site is “unsound”.
It is known that Colwinston has been subject to significant housing allocations in the settlement as part of previous plans. To evidence this, 25% of the 64 units (i.e. 16 units) were approved on the site allocation ref. MG2(41) and PP ref.
2014/00242/FUL. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Colwinston, further provision ought to be made in comparable (previously unprovided for) locations, such as Land South of A48, Bonvilston.
Summary of These Representations
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised above in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 7170
Derbyniwyd: 11/04/2026
Respondent ID: 2373
Ymatebydd: Wig Fach Property Company Ltd
Asiant : Geraint John Planning Ltd
The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
ANNEX 1
Preface
This Annex sets out the detailed case in support of these representations, and by association the case for allocation of the site.
The representations are structured into the following sections:
1. Response to the Deposit Plan;
2. Comments on specific policies; and
3. A summary of the suitability of the site for development.
SECTION 1. Response to the Deposit Plan
Distribution of Growth
We object to the distribution of growth within the Deposit Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain the majority of housing growth in the Vale over the Plan period, or rather the over-reliance on this defined area, and the associated absence of growth in other parts of the Plan area.
As outlined in our previous representations, the allocation of housing and the location of strategic growth neglects the Rural Vale, and in our view, overprovides in the Strategic Growth Area. For example, with limited housing stock and average house sales at over £500,000 over the last 12 months, there is a clear and established need for new homes in the Ogmore By Sea area, particularly at an affordable level. This is reinforced by the Local Housing Market Assessment that identified a need for over 1,114 new affordable homes per annum over the next five years throughout the county, and 196 units per annum thereafter (average of 502 units per annum over 15 years). Further to this, it is widely known that the rural Vale comprises the majority of the county’s ageing population, which, as a demographic, has and will continue to grow rapidly over the Plan period. This is evident in the ‘Population Change’ chart below – which is taken from the Deposit Plan:
VofG Deposit Plan: Figure 4 Population Change 2011 to 2021
It is clearly the case that younger populations are migrating to other Authorities, where access to housing is typically cheaper and more affordable, whilst more older populations are significantly migrating into the Authority. This trend will result in an extremely unbalanced demographic, given that the working-age population have sought housing elsewhere.
Without a suitable supply of affordable housing delivered over the Plan period, this trend will only worsen. Accordingly, it is not considered that the RLDP takes into account the lack of supply of affordable homes within the rural Vale, as well as increased housing to support the growing ageing population within these areas.
Para 3.19 of the Deposit Plan clearly outlines that affordable housing is required in the short term, in order to meet pressing needs. Specifically, it outlines the following: “There is significant pressure on temporary accommodation in the Vale, for a variety of reasons including increased homelessness presentations… The need for sufficient permanent affordable housing to assist in moving people out of temporary accommodation is critical and the planning system has a vital role in assisting in new affordable housing delivery.”
Accordingly, the distribution of growth within the Authority must be proportionate, to ensure that populations / areas are not left behind where they must seek access to housing elsewhere.
The RLDP Sustainable Growth Strategy sets out 6 objectives. Objective 4 states: “Allowing for small scale affordable housing led development in settlements outside the Strategic Growth Area at a scale proportionate to the size of settlement.” (Page 66)
Para 5.25 states “Therefore, a key part of the strategy is to allow for affordable housing led developments within sustainable primary and minor rural settlements outside of the Strategic Growth Area, at a scale that is appropriate to the size of the community it is serving. An ‘affordable housing led’ scheme is one where a minimum of 50% of the dwellings would need to be affordable, although this could increase to a maximum of 100% if the site is brought forward by a social landlord”.
In terms of the definition / explanation of what the affordable housing-led development sites are seeking to achieve, paragraph 6.132 of the Deposit Plan outlines the following:
“Accordingly, to ensure that new developments respond to the high demand for smaller properties, as identified in the LHMA, priority will be given to affordable homes that are small to medium-sized, typically comprising one to three bedrooms. Representations received from the local community through the RLDP process also highlighted a desire for new housing developments to offer opportunities for accessing smaller market homes. This is particularly relevant in the rural Vale, where housing choices are more limited. Providing smaller, more affordable market homes may assist first-time buyers and enable older residents to downsize to more manageable properties within their local area. Affordable housing-led sites will therefore need to demonstrate that an appropriate range of both affordable and market dwellings has been provided.”
Despite the acknowledgement within this strategic objective, we do not consider that the RLDP goes far enough to meet this objective, nor are its provisions and allocations adequate.
It is considered that this objective is undermined by the allocations set out by the RLDP (not least the absence of allocations in the rural Vale). Notwithstanding the Vision’s clear acknowledgement of the benefit of the growth of the rural Vale, these areas have not been supported through the plan due to the lack of growth which has been attributed to these areas in terms of further housing, employment and sustainable transport. All growth options have been selected on the basis of being in either Key Settlement, Service Centre settlement or Primary Settlements, all of which are already sustainable areas served by rail. As a result, it is not clear how this objective can be achieved, without the allocation of further sites within the Minor Rural Settlements, such as Ogmore By Sea. The Vale is characteristically ‘rural’, and as such, there needs to be a stronger emphasis on supporting and delivering new development in order to bolster the rural economy. This includes enabling opportunities to provide employment and business premises within
/ near to rural settlements, as well as focusing housing growth in these areas to reduce travel time, and use of sustainable transport.
It is considered that the current Strategy does not provide adequately for all residents across the Vale, only those within the Strategic Growth Area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan. This brings into question the “soundness” of the Plan.
The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north (as defined in the RCTCBC LDP). The Minor Rural Settlements to the west are more likely to be supported by job opportunities and employment in Bridgend than further east in Barry or Cardiff. Similarly, those in the north align with, and function in association with, the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north. These settlements are served by existing bus services that provide sustainable modes of travel to key employment locations in and around Bridgend. This is acknowledged in Paragraph 3.3 of the Strategy which states “The greatest number of residents who travel outside of the Vale for work purposes travel to Cardiff followed by Bridgend and Rhondda Cynon Taf, whilst a smaller proportion commute into the Vale from these neighbouring authorities”. The Demographic Evidence (Feb 2023) estimates the Vale as being a net importer of workers from RCT and Caerphilly (Para 3.6) - as shown in Figure 10 in the Preferred Strategy.
The current Strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas - given that Growth has been apportioned in only the Key Service Centre and Primary Settlements. It is considered that this will fail to support and facilitate the current (and any future) employment coming into the Vale, nor will it support any employment which is located outside of the Vale to the West and North. The Growth Option is too heavily reliant on access to railway stations as the key and sole sustainable transport method, whereas access to bus services should also be appropriately assessed and focused on in terms of promoting sustainable development. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural. The delivery and soundness of the Plan is therefore questioned and we continue to object to the spatial growth strategy as set out in the Deposit Plan.
Housing Supply
RLDP Allocations - Key Sites
As set out in representations made throughout the Plan preparation process, we consider that the Plan is too reliant on the delivery of ‘key sites’ to meet the housing need over the Plan period. Specifically, the Plan makes provision for 2,278 units in these Key Sites, which equates to circa 65% of RLDP allocations in the housing supply. The 5 key sites that are allocated in the Deposit Plan are as follows:
• Land at North West Barry – 376no. units;
• North of Dinas Powys – 250no. units;
• Land at Readers Way, Rhoose – 520no. units;
• Land at Church Farm, St Athan – 532no. units; and
• Land to the West of St Athan – 600no. units.
We object to the current housing supply to allocate 2,278no. (65%) of units across strategic sites, as this makes for a risky and unrobust strategy for delivering housing, and in turn, meeting the identified housing need over the Plan period.
As stated in previous representations, there is concern that the proposed timing and phasing of the proposed Key Sites is unrealistic and unrobust, and in turn, undermines the soundness of the Plan, given the heavy reliance on Key Sites delivering new homes across the Plan period. Whilst it is not disputed that the sites would have gone through rigorous assessment to inform their proposed allocation, the timescales for securing planning permission (with all associated conditions discharged) is considered to be unachievable. This is particularly the case for the following timescales that are set out in the Housing Trajectory that underpin the Plan:
• “Time period of pre-application discussions/PAC consultation” – 4 months
• “Time between submission of planning application and determination” – 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” – 4 months
It is considered that the above timescales are fundamentally unrobust, and result in a distorted position of housing sites over the RLDP Plan period. It is not considered that these reflect or are informed by the timescales that are currently being incurred for planning applications submitted for major housing sites across Wales. It is rather the case that such applications would typically be determined 1-2 years following submission, given that there are a wide range of stakeholders involved in the determination of major planning applications – which often adds to the delays associated with the determination of such applications.
It is equally the case that the assumptions in the trajectory are solely based on expected timescales for processing formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission.
It is assumed that these timescales have not considered that such major developments can be subject to the need to undertaking and submitting an Environmental Impact Assessment (EIA), which adds another layer to the determination of any planning application – given the additional considerations that form part of this process. As such, any site subject to EIA would very likely result in further delays extending beyond the timescales set out in the trajectory. Equally, as set out above, the preparation of an application subject to an EIA requires even more detail and assessment, which only further adds to the preparation stage (which has not been factored into as part of the trajectory). Accordingly, it is not considered that the trajectory contains any contingency if any site is required to undertake EIA as part of their application.
For the reasons stated above, it is unlikely that the sites will yield in full, particularly those sites which are expected to deliver housing right up to the final year of the Plan period (‘Land at Readers Way’ and ‘Land to the West of St Athan’). These sites do not allow for any ‘slippage’ should any delays arise through the development management process (which for the reasons set out above, will very likely be the case), and as such, a gap in housing delivery will be brought about as a result of these sites not yielding in full.
Given the proposed ambitious timescales set out for the delivery of the Key Sites, it is considered the housing trajectory is unrobust, and in turn, undermines the soundness of the Plan as a result. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to fully yield given that such sites are subject to less assessment and consideration compared to strategic sites. This would make for a more robust strategy, where a greater number of small to medium sites can deliver housing in the short and medium term of the Plan period, whereas the strategic sites represent a more longer-term strategy to deliver housing – which would then spill into the next Plan period.
Accordingly, we object to the Deposit Plan in its current form, where there is an overreliance on housing need to be met through the delivery of the Key Sites, which we consider to be unrobust, and undermine the integrity and soundness of the Plan. The current strategy of the Plan is at significant risk of not delivering the level of housing expected based on the sites allocated, as least as swifty as identified in the housing trajectory. Should no change be made to the Plan to address the above issues, then it is extremely likely that the Plan would ‘fail’ in meeting the identified housing need.
Windfall Sites
It is noted that the RLDP is made up of the following:
• Existing land supply (3,838 units)
• Windfall sites (1,303 units)
• Allocated sites (3,521 units)
Para 6.69 states that “Analysis of historical delivery of housing indicates that on average small windfall sites (sites of less than 10 dwellings) have provided some 53 dwelling completions per year, and large windfall sites (10 dwellings or greater) contributed on average 80 dwellings per year. Overall, it is projected that windfall sites could contribute a further 1,303 dwellings over the remainder of the plan”.
As set out in our previous representations to the Housing Trajectory, we would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan – which is discussed in greater detail later in this submission. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
St Athan Train Station
The RLDP Sustainable Growth Strategy comprises six key elements, of which the following is set out in respect to the allocation of new housing growth in the Authority:
“3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.”
The strategy outlines that a feasibility study for a station in St Athan had been undertaken in 2022, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ and 80no. units attributed to ‘Former Stadium Site, adjacent to Burley Place’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,263no. homes to be delivered in St Athan over the Plan period.
It is now the case, however, that the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales – as confirmed in the ‘Today, Tomorrow, Together: A vision for rail across Wales and Borders’ (February 2026) recently published by Transport For Wales. This paper acknowledges that a new railway station at St Athan would represent a longer term opportunity, and therefore, will not be delivered in the short term / within the Plan period of the emerging Plan. Equally the Council have not provided any evidence to contradict this, and therefore, it is very unlikely that any new train station will be delivered in St Athan over the Plan period. This brings about significant questions regarding the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,263no. homes (36% of the Plan’s new housing allocations) are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
In terms of the expected delivery of the Key Sites in St Athan, it is noted that the trajectory identifies that for the majority of the Plan period, both sites will be delivering 80no. dwellings per annum on each site (equating to 160no units in total). Whilst these are two separate sites, we seriously question the realistic prospects of the significant number of
homes being built simultaneously on two sites in proximity to one another – given the considerable logistical issues that would be brought about.
Accordingly, it remains that there are serious questions regarding the suitability and acceptability of the proposed allocations at St Athan, which do not accord with the strategy adopted for the RLDP – to focus housing growth on settlements that are supported by railway stations. Moreover, the scale of development proposed at St Athan is also not considered to be proportionate, with a significant number of homes delivered in a location not served by a railway station.
Rolled forward LDP Sites
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current Plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application
submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ’soundness’, and risks rendering the Plan unrobust.
Housing Delivery Rate Assumptions
As set out in our previous representations to the Housing Trajectory consultation, we have considerable concerns in relation to the proposed delivery of the sites identified in the trajectory – which we do not consider are robust or reasonable.
Appendix 1 of the Deposit Plan sets out the development trajectory bar chart – which illustrates the proposed delivery of housing, on a per annum basis, over the Plan period.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
It is our view that the trajectory makes for an unrealistic and unrobust delivery rate of housing, which does not reflect the pattern of housing completions in the Vale of Glamorgan. We therefore have concerns regarding the soundness of the trajectory, not least that there remain significant uncertainties as to the delivery of the Key Sites (as discussed earlier in these representations).
Firstly, the graph / trajectory illustrates a large ‘spike’ in terms of housing delivery in the year 2027-28, which is considered to be a marked and pronounced step change in the rate of delivery. This envisages / relies on a significantly higher rate of delivery than previous years in the Vale of Glamorgan (2021 through 2021 – as depicted by the green columns). It is considered that this level of delivery is unlikely to materialise, not least given prevailing market
circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions from 2021 - 2025 has been approx. 400 - 500 units, however, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100% relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
It is also the case that the anticipated delivery of housing fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2025.
Accordingly, we consider that the housing trajectory, as proposed, is entirely manufactured and unreflective of the past completion rates, as well as the recent published completion rates provided by Welsh Government recently in August 2025. As set out in our previous representations, it has been evidenced that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1: ‘New House Building: April 2024 to March 2025’
As identified in the graph above, in 2024-25, 4,631 new dwellings were completed, which represents 3% fewer than the previous year. This figure represented the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed) The New Housing Pipeline Report Quarter 3, 2025 Report (December 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 7% during the third quarter of 2025, extending the decline seen during the first half of the year. At 45,075, the number of units approved was 34% down on the third quarter of 2024 and the lowest quarterly total since 2012 Q2. At 146,798, the overall number of units approved during the first nine months of 2025 was 25% lower than a year ago.
HBF Graph Illustrating Residential Approvals (2006-2025)
The above graph clearly shows a pronounced downward trend in the number of residential planning approvals over the period, particuarly with a sharp decrease seen since 2020. Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
More recently, the Welsh Government has released its new estimates of housing need (Estimates of Additional Hosing Need: 2025-based – February 2026). The estimates show how many new homes need to be built over the next twenty years to address existing unmet need as well as newly arising need. The figures set out that around 8,700no. new homes a year are needed over the next Senedd term up to 2030 to meet new housing need. Additionally, there is an unmet need for 9,400 affordable homes.
Overall, this represents more than double 2024/25 levels of supply, where just 4,638 new homes were built.
HBF: Estimates of Housing Need
HBF: Actual Delivery vs Estimates of Need
The above graphs unequivocally evidence that historical rates of delivery of housing in Wales has remained low, and moreover, significant numbers of housing need to be allocated in order to meet the estimate of need. It is not
considered that the housing trajectory, in its current form, is robust to meet the housing need over the Plan period, given the uncertainties of the Key Sites, and the level of housing delivery that has been identified for the Plan.
Affordable Housing-Led Sites
HG4 - Rural Affordable Housing Led Sites
Policy HG4 of the Deposit Plan identifies four sites to be allocated as affordable housing-led sites, totalling approximately 122 dwellings within the plan period. Given the target levels of achieving 3,070 affordable dwellings over the course of the Plan period (up to 2036), it is not considered that this policy goes far enough to address the target and level of affordable housing need.
It is noted that the number of units identified for each site relate to the ‘total’ number of units delivered, as opposed to the affordable housing provision. Accordingly, it can be assumed that circa 50% of each allocation will comprise affordable units (given each site is affordable-led), which would equate to a total provision of circa 61no. units. The contribution from the affordable housing-led sites would only equate to 2% of the total need (3,070no. units). Even when coupled with the affordable housing provision from open market sites and 100% exception sites, the total delivery of affordable housing will still be nowhere near enough to meet the overall affordable housing need over the Plan period. Accordingly, it is considered that inadequate provision has been made for such sites.
Insofar as to the sites chosen and allocated are concerned, it is clear from reviewing the Stage 1 and Stage 2 Candidate Site Assessment that the allocated sites HG4(1) – (4) were not considered acceptable due to being outside the strategic growth areas, and were considered to be unacceptable intrusions into the open countryside. After being resubmitted as affordable housing-led sites, the sites were allocated, some with a smaller area in order to accommodate less dwellings in total.
The sustainable credentials of the sites allocated is not disputed, and it is acknowledged that these minor rural settlements have the ability to accommodate further growth, in the form of affordable-led housing allocations. However, it is considered that the should also form an allocation as part of this policy, given its high sustainability credentials and its appropriate location to accommodate a suitable level of development. Please refer to the previous representations made to the Housing Trajectory Consultation (dated 17th October) for further, more detailed comments regarding the above sites.
The LHMA 2023 shows that there is a need for 124 affordable homes in the St Brides Major local housing market area (which Ogmore is located within). As such, there is an identified need for affordable housing in this area, something which the site could address through an allocation.
It is questionable whether Wick has the capacity to accommodate 50 new dwellings, given the sustainability and rural nature of the area. As a result, it is suggested that the number of homes allocated in Wick is reduced and that a further allocation in St Brides Major is secured, in order to facilitate supporting the delivery of affordable housing through the housing market area, rather than in one minor rural settlement. The sustainability of Ogmore has been assessed, both by the Council through the Sustainability Appraisal and again, through our assessment of the site.
Securing further delivery of Affordable Units
As set out above, the affordable housing-led allocated sites only provide 122no. affordable dwellings, which comprise 4no. allocated sites that are expected to deliver approximately between 20 – 50 dwellings. However, the RLDP sets a
target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4 % of the target provision and will only make provision for 2% of the targeted number. We would therefore object to the sites included within Policy HG4 and would suggest that more sites should be allocated as part of the policy in order to secure delivery of a higher number of affordable housing units to mere the target.
Whilst it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, as set out above in these representations, there is serious concern regarding the deliverability of these sites, which would result in a significant gap of affordable housing delivered.
A greater number of affordable housing-led sites allocated would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in affordable housing need being unmet, with demand continuing to outstrip supply.
Previous representations to the Preferred Strategy (dated 14th February 2024) provided comment on the sustainability scoring of Ogmore and the proposed site. As outlined within these representations, it is considered that the site (ID xxx) represents a sustainable, deliverable and acceptable site. The site is within a maximum of a 22- minute bus journey to a every key service listed, due to the proximity of the site to settlements such as Bridgend. Due to the availability of frequent bus services, and active travel links, these key services are readily available to access for any residents within Ogmore By Sea without the need to travel by car. The site is located within 5 miles of Bridgend, and within a maximum 22-minute bus journey of the following services:
• St Brides Primary School;
• Brynteg Comprehensive School;
• Bridgend College;
• Riversdale Surgery; and
• Bridgend town centre for various Retail Services
Moreover, Ogmore has benefitted from the recent development of the Ogmore By Sea Village Hall, which provides space for community activities and events to take place. The hall also includes a coffee shop (Welsh Coffee Company), which only adds further to the daily services provision available within the settlement. Access to the hall and coffee shop is directly provided for pedestrians from the Main Road, which allows for direct access from the site.
Accordingly, the settlement of Ogmore represents an acceptable location to allocate an affordable housing-led site, given the access to existing services and facilities that would serve future residents of the site.
It is acknowledged that the site also lies within the Glamorgan Heritage Coast and this point is addressed further below.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of Ogmore By Sea, support the surrounding settlements, and the Plan area as a whole. As such, the site should be considered further.
Comments on Specific Policies
HG5 - Affordable Housing Exception Sites
Given the unmet need and extant backlog of affordable housing, as identified within the LHMA (2023), it is noted that an Affordable Housing Exception Sites policy has been adopted in order to assist in the delivery of affordable housing. Policy HG5 sets out the specific criteria where proposals for 100% small scale affordable housing developments will be permitted outside settlement boundaries. The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
That said, it is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands. Therefore, the proposed amendments to Para 6.140 are outlined below in red:
6.140 “For the purposes of this policy, ‘small-scale’ will generally mean no more than around 10 dwellings on sites adjoining Minor Rural Settlements. In Primary Settlements outside the Strategic Growth Area, proposals for more than 10 dwellings may be acceptable where required to meet a specific need and where the number of dwellings is proportionate to the size of the settlement. In assessing the scale and extent of any proposed local needs housing, consideration should also be given to affordable housing already planned in the ward or nearby area, including sites with existing planning permissions and those allocated in the RLDP. The size and type of affordable housing proposed should reflect the identified local need in the area.”
The above suggested wording would achieve a more flexible policy, which would allow for a variety of scaled applications to secure planning permission for solely 100% affordable housing across the Authority area. This greater flexibility would enable the policy to make a significant contribution towards meeting the affordable housing need – which, as set out earlier is in considerable need.
Policy DNP3 – Glamorgan Heritage Coast
Given that the site is located in the Glamorgan Heritage Coast, it is noted that the following policy is of relevance to any future development on the site. Criteria 4 of Policy DNP3 states:
“The special environmental qualities of the Glamorgan Heritage Coast will be conserved and enhanced. New development will be restricted to:
4. Other appropriate and sustainable development that accords with National Policy.”
It is also noted that supporting Para 6.422 “In seeking to protect the Glamorgan Heritage Coast, the Council acknowledges that there are some built up areas within the boundary, including the Minor Rural Settlement of Ogmore. In addition, the Vale of Glamorgan rail line crosses part of the Heritage Coast designation in the location where a new station at St Athan is proposed. Whilst being mindful of the need to protect the special qualities of the Glamorgan Heritage Coast, the Council accepts that development within these areas is appropriate, subject to relevant policies of the Plan”(GJP emphasis).
We would offer general support for this policy, and consider this to provide flexibility which allows for certain forms of development. However, we would suggest that the policy wording should be amended to reflect that ‘housing’ should be supported in the Glamorgan Heritage Coast, providing that the policy exceptions are met. Therefore, the following amendment is proposed as part of the policy should be changed to include “small scale housing” or something similar. The proposed amendments to Policy DNP3 are outlined below in red:
“The special environmental qualities of the Glamorgan Heritage Coast will be conserved and enhanced. New development will be restricted to:
4. Other appropriate and sustainable development, including small-scale housing proposals that accords with National Policy.”
Again, this would ensure that suitable housing developments can be delivered in the Plan period, to meet the housing needs of the Vale of Glamorgan – particularly in respect of affordable housing.
SECTION 3. Suitability of the site for development
The site promoter objects to the overall assessment of the site, in that it is not considered suitable for further development in the Plan. The promoted site has undergone extensive scrutiny and appraisal at a high level to ascertain the qualities of the site, in light of all identified material considerations which relate to the proposals.
The delivery of the site will yield much needed housing (including Affordable housing) and contribute to the overall supply in the new Plan period, whilst making effective use of a suitably located site for residential development.
Moreover, as set out in ‘Annex 2’ of our representations, the site has overcome the ‘constraints’ set out in the Candidate Site Assessment undertaken for the site, which demonstrates that the proposal is both acceptable and deliverable.
SUMMARY AND CONCLUSIONS
In summary, the site promoters:
• Object to the distribution of growth proposed for the Plan area, with a more balanced and equitable distribution of housing sites required in order to meet the identified housing need;
• Object to the level of growth identified for the Plan period;
• Object to the housing trajectory that underpins the delivery of housing within the Plan period – which is considered to be unrealistic and unrobust, leading to serious uncertainty regarding the “soundness” of the Plan;
• Object to the over-reliance on Key Sites and Rolled Forward Sites in making up the Plan’s housing land supply;
• Object to the scale and timing of delivery of sites in / around St Athan – all of which are predicated on railway station provision which will not be realised in the Plan period;
• Object to the under-provision of sites under Policy HG4 – Rural Affordable Housing-Led sites, not least given their extremely limited contribution to the targeted need for affordable housing;
• Object to Policy DNP3 – Glamorgan Heritage Coast, given the lack of recognition for the potential for small-scale housing proposals;
• Object to the current wording of the HG5 Policy ‘Affordable Housing Exception Sites’ which requires greater flexibility to play an important role in delivery much-needed affordable homes across the Authority; and
• Object the Council’s assessment that the site is not considered suitable for development.
The site and proposals are consistent with the RLDP strategy, other Vale of Glamorgan strategies, and the requirements of Planning Policy Wales and Future Wales. It will make a significant contribution to the Vale’s identified housing requirement in the RLDP period and will provide for a wide range of uses that will support the wider community whilst embodying principles relating to placemaking and the well-being of future generations.
The site has no fundamental constraints and has the ability to deliver significant economic, social and environmental benefits for the benefit of future residents and the existing local community. The site is demonstrated to be viable, being able to deliver policy-compliant levels of affordable housing and given its location within a strong market area, will benefit from high delivery rates.
ANNEX 2
SECTION 4. A summary of the suitability of the site for development including a Response to the Candidate Site Assessment
This section of the overall representations to the Deposit Plan is to respond to, and address, the Council’s assessment of the site.
While the issues the Council have raised in their assessment of the site have been addressed and discussed within the representations made at the Preferred Strategy stage of the Plan, a similar ‘scoring’ exercise has been undertaken as part of the evidence base for the Deposit Plan. As such, it is still pertinent to consider and respond to the Council’s assessment of the site as part of these representations
The Detailed Site Assessment for Land at Hazelwood, Ogmore By Sea (Site ID: 3855) sets out that the position of the site at the Deposit Stage is as follows:
“The original site as ruled out as the development would represent unacceptable intrusion in to the open countryside. Whilst the site has now been identified for an affordable housing led development, the original reason for ruling it out still remains.”
In terms of the assertion that “the development would represent an unacceptable intrusion into to the open countryside”, this is strongly disputed, in that the development of the site would represent a natural rounding off of the existing settlement boundary. An extract of the site relative to the settlement boundary is provided below, which clearly shows that the development of the site would not extend beyond the existing settlement pattern that exists in Ogmore.
Site Outlined in Red and Settlement Shaded in Blue
As clearly demonstrated in the above mapping, the site would extend no further eastwards than the existing housing area to the south of the site. Equally, the site would not be extending any further north than the existing settlement pattern in Ogmore. This position is further supported by the wider aerial view of the site provided overleaf:
Wider Aerial View of Site Outlined in Red and Settlement Shaded in Blue
In summary, it is considered that the proposed allocation of the site represents a logical rounding off of the existing settlement, as depicted in the mapping provided above – where the site follows the existing envelope of the settlement. The site does not extend any further eastwards than the established built form located immediately to the south; indeed, it sits comfortably within the same development line.
As such, it cannot be considered that the site represents an ‘intrusion’ into the countryside, as the site would be visually and functionally related to the settlement. It therefore follows that the site would be read as part of the settlement, and not the wider rural landscape.
Candidate Site Assessment
The Detailed Site Assessment undertaken by the LPA includes a summary and assessment of the ‘scoring’ system used at the Preferred Strategy stage. A comparison between the site assessments undertaken at both the Preferred Strategy stage and Deposit Plan stage is provided overleaf for reference.
Site Assessment at Preferred Strategy Stage Site Assessment at Deposit Plan Stage
As demonstrated above, there are no changes to the scoring attributed to the site. Detailed submissions were made on the previous assessment undertaken by the Council at Preferred Strategy stage, and as such, should be read in conjunction with this submission (see Appendix A).
Sustainability
Notwithstanding the above, it is considered that the site represents a more sustainable location than what was previously assessed at Preferred Strategy stage, in light of the Ogmore by Sea Hall development. The Hall acts as a community facility, whereby the space is available for hire by local community groups such as birthday parties, weddings, group meetings, and other such similar uses. Moreover, a café (Welsh Coffee Co) is located within the premises which sells both food and drink.
The hall and café are within walking distance to and from the site, where new access facilities have been implemented from Main Road directly to the building, to allow access for pedestrians and cyclists. This is illustrated in the image below:
Walking and Cycling Facilities
The Tusker Rock pub and post office are also located along Main Road, all of which are within walking distance to the site.
Accordingly, the site is well served by new amenities (i.e. community hall) that comprehensively improves the sustainability of the site / settlement, and in turn, improves the sustainability credentials of the site promotion. It therefore follows that the site represents an acceptable location for residential development, and the site should be looked upon favourably accordingly.
It is also the case, as set out in previous representations, that the site is within a maximum 22-minuted bus journey of the following services and facilities:
• St Brides Primary School;
• Brynteg Comprehensive School;
• Bridgend College;
• Riversdale Surgery; and
• Bridgend town centre.
As such, key services and facilities can be access by sustainable travel over and above the existing level of provision available in Ogmore By Sea (as discussed above).
Accordingly, the relevant ‘red’ scorings in the Council’s assessment should be updated to reflect the site’s suitability and sustainability to accommodate the proposed residential development of the site.
Glamorgan Heritage Coast
Insofar as to the position regarding the site’s location within the Glamorgan Heritage Coast, detailed submissions are made not only in the Preferred Strategy representations, but also in Annex 1 of this submission. In short, given the pressing need for such development (particuarly affordable housing) to come forward in the Plan period to meet ever-increasing needs, development of this nature should be considered more favourably – not least that, as outlined in this Annex, the site would not extend any further that the existing settlement boundary.
Accordingly, the site would be perceived to form part of the settlement of Ogmore By Sea, and not the wider landscape, and therefore, would not have any detrimental impact on the Heritage Coast in any respect. The scoring should be amended accordingly to reflect this position.
Climate Change
As outlined in previous representations, the development will incorporate climate change measures, such as EV charging points, PV panels, as well as adopting sustainable materials for construction whilst maximising the potential for the dwellings to be energy efficient. Accordingly, the development will be built to high sustainable standards, and therefore, the scoring of the site should be amended as a result.
Summary and Conclusion
It has been evidenced above that there are no fundamental constraints at, or associated with the site, that would preclude the site coming forward for development in the RLDP period.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of the Vale of Glamorgan.
Summary of These Representations
In short, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised below in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Preface
This Submission sets out the detailed case in support of these representations. The representations are structured as follows:
1. Procedural Consultation Matters;
2. Timing Assumptions underpinning the Trajectory;
3. Housing Delivery Rate Assumptions;;
4. Status & Standing of Sites included in the Trajectory;
5. Key Sites;
6. St Athan Train Station;
7. Geographic distribution of the ‘new’ sites / provision;
8. Detailed comments in respect to ‘new’ sites;
9. Conclusions Procedural Consultation Matters
Firstly, we do not consider that the consultation on the Housing Trajectory information has been procedurally undertaken appropriately or suitably.
Only 14 days have been afforded to parties to make representations on the information provided. This is despite new sites being introduced (at this late stage) i.e. Land South of Clive Road (identified in Table 4), as well as a number of affordable housing led housing sites being introduced (i.e. those outlined in Table 5). This does not provide an adequate process or timescale for objectors to scrutinise the published content, and to make comments on sites which have been presented for the first time at a late stage in the process.
As part of these representations, we will be making brief comment on the sites which have not been previously consulted upon, namely:
Other Housing Allocations
• Land south of Clive Road, St Athan;
Affordable Housing Led Sites
• Land at Heol Fain, Wick;
• Land west of Maendy Road, Aberthin;
• Land Noth of West Winds Business Park, Fferm Goch; and
• Land to the East of Colwinston;
It is considered necessary to comment on these sites, given that they form an important and critical part of the housing trajectory, and by association in the Council and Plan reaching their targets. Moreover, these sites have not been consulted on previously. Accordingly we consider it necessary to pass comment on these in order to ensure that the consultation is fair and robust.
As well as limited time given to comment on the information contained within the Housing Trajectory, the LPA have failed to set up a Housing Stakeholder group to agree and discuss the trajectory information and data – with the cover email to the consultation (dated 3rd October 2025) stating “it is considered that it would be the best use of stakeholder time to conduct this engagement via email, particularly as many of the forecasts have been developed in consultation with site promoters including developers and their agents”.
We submit that the stakeholder consultation has not been a transparent nor robust consultation process, given that the Development Plans Manual states at Para 5.66 “A housing trajectory must be prepared to support the Deposit Plan. In order to generate a housing trajectory and associated phasing tables it will be necessary for LPAs to engage with stakeholders through a Housing Stakeholder Group. This will ensure that the timing and phasing of sites is robust and based on up to date information”. Given that this has not taken place, we would raise fundamental concerns that the consultation of the trajectory has not adequately taken place as per the relevant guidance. Afterall, the guidance stresses that a Group should be formed as a necessity. Accordingly, there has not been an adequate process and opportunity to review and comment on the information published, including in respect to the other sites have been introduced at this late stage.
Timing Assumptions underpinning the Trajectory
The assumed and factored in timescales of the various stages of bringing forward sites i.e. the pre-application stage, the planning application process, and the discharge of condition process outlined in the trajectory are considered to be fundamentally inaccurate, and result in a distorted position of the delivery of housing sites over the RLDP Plan period. The assumptions are far too ambitious, and without evidence / are not comparable with the timescales being incurred in processing such stages at the Development Management stage(s).
Specifically, we raise objection to the following timescales which are considered to be extremely ambitious and unrealistic:
• “Time period of pre-application discussions/PAC consultation” = 4 months
• “Time between submission of planning application and determination” = 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” = 4 months
In our experience, having submitted a significant number of major and other applications for housing and other forms of development in the last 1-2 years to the Council (and elsewhere in Wales and England), it is extremely unlikely that major applications can be submitted, and planning permissions granted, within the timeframes assumed by the trajectory. A wide range of stakeholders are also involved in the determination of major planning applications, which often adds to the delays associated with the determination of such applications. We would therefore consider that a time period of “6 months” given to all major applications in the housing trajectory is not feasible, and distorts the trajectory timescales for the remaining Plan period.
The assumptions in the trajectory are also solely based on expected timescales for the processing of formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission (i.e. pre-application enquiry submissions / planning application / discharge of condition details etc). When factored in these will elongate the timescales for bringing forward schemes considerably.
Moreover, it is common practice for larger housing sites and major applications to have a range of pre-commencement conditions attached to a permission once granted. Again, we would raise concerns with the timescales indicated in the trajectory related to this part of the planning process. It is highly unusual and questionable that any technical work required by these conditions (usually relating to drainage and highways matters) would be instructed, completed and submitted within 2 months, and for these to then be signed off / approved in a further 2 months. There are also other technical matters and necessary approvals falling outside of, and over and above, the planning system, such as SAB, s.106, s.38 and s.278 agreements, timescales for which have not been accounted for – and all of which are rarely completed within “4 months” as indicated.
It is therefore highly doubtful that the timescales legislated for in the trajectory for the various stages pre-construction are achievable – with no information about these proposed timescales outlined within the supporting text of the Housing Trajectory. We would therefore raise considerable concerns and objections to these as they stand without full evidence to fully show how these have been calculated, and without there being considerable (and necessary) adjustment to the timescales indicated and factored in.
We would therefore object to the timescales indicated in the ‘Timing and Phasing of Sites’ table, given that the delivery start dates will be pushed back further into the Plan period. Accordingly, and as a result, the Plan is at risk of not delivering the level of housing expected based on the sites allocated, at least as swiftly as is set out in the trajectory.
Housing Delivery Rate Assumptions
We would also raise considerable doubt over the proposed delivery of the sites identified in the Housing Trajectory - which we do not consider are robust or reasonable.
The development trajectory bar chart set out in the consultation material (extracted below) anticipates and legislates for a number of critical events and circumstances – all of which are considered to be unrobust and unsound.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
Firstly, a large ‘spike’ (material increase) in housing delivery is factored in to take place in 2027 – 2028. This is a marked and pronounced step change in the rate of delivery, and envisages / relies on a significantly higher rate of delivery than previous years in The Vale of Glamorgan (2021 through 2025 - as depicted by the green columns). This is considered extremely unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions in The Vale of Glamorgan from 2021 - 2025 has been approx. 400 - 500 units. However, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100%relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
The anticipated delivery of housing also fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the
period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2015.
To summarise, we consider the defined position to be wholly manufactured and unreflective of the past completion rates, as well as the recently published completion rates provided by Welsh Government recently in August 2025. In the Welsh Government Statistics Document ‘’New House Building: April 2024 to March 2025’, information on the number of new dwellings started is provided, where building has commenced and those completed for April 2024 to March 2025. Figure 1 provides a graph showing starts in the last 10 years, and it is clear that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1:.‘New House Building: April 2024 to March 2025’
In 2024-25, 4,631 new dwellings were completed, 3% fewer than in the previous year. This was the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed). The New Housing Pipeline Report Quarter 2, 2025 Report (September, 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 6% during the second quarter of 2025, continuing the decline of approval during the first three months of the year. Wales saw one of the largest declines in the UK in approvals with a decline of 29%.
Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
The Home Building Sector Skills Plan (Aug 2025) published by the HBF also identified the following issues with the workforce to bring forward built development in Wales:
• “A shortfall in numbers entering roles from the education system;
• An ageing workforce: 25% of the home building workforce is aged over 50, meaning the sector is facing an impending retirement cliff edge;
• Challenges attracting a wider talent pipeline into the sector;
• A lack of understanding of critical future skills needed, and direction from the Future Homes Standard; and
• Output within the sector fluctuating with demand and economic pressures, leading to additional pressures in recruitment and training”.
It is not considered that in the next 1-2 years that any of these issues can or will be substantially corrected – at least sufficiently so to allow for, and enable, the planned delivery rates of new housing completions to be as high as < > 1,000 homes in one year (and for four consecutive years at that).
We would therefore object to the proposed numbers of completion expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated.
Status & Standing of Sites included in the Trajectory
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ‘’soundness’’, and risks rendering the Plan unrobust.
On this basis, we would object to the Plan if the provision of housing is not adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply.
Key Sites
As set out in previous representations at Preferred Strategy stage, it is considered that the housing supply relies heavily on the delivery of the ‘key sites’ to deliver housing (and meet need) over the Plan period. The total number of housing units attributed to key sites amounts to 2,278, which equates to over 25% of the total provision in the Plan period.
As detailed above, we consider there to be concerns regarding the proposed ‘Timing and Phasing of Sites’ table included in the Housing Trajectory which we consider are not reflective or accurate and will therefore have the effect of delivery start dates being much later into the Plan period than anticipated. The result of this will be that the Plan will be at risk of not delivery the level of housing expected and needed. Moreover, the Housing Trajectory Graph presents an overly ambitious level of housing completions over the Plan period - which the Council consider will be markedly higher than the average levels experienced in the last five years. Again, for the reasons set out above, we consider that these rates of expected completions to have no evidence supporting them, and to be unachievable and unsound.
Insofar as to the removal of the previously proposed site ‘Land at North East Barry’, this site was expected to deliver 900no. units in the Plan period. Following its omission from the housing supply, other sites have been identified, which comprises the inclusion of a new key site (Land at North West Barry), 3no. non-strategic sites, and also affordable housing-led allocations. In terms of the quantum of development attributed to these new sites, this amounts to 659no. dwellings. This is some 250 units less than the 900no. homes that was previously attributed to ‘Land at North East Barry’. Whilst it is appreciated that the number of homes forming part of the existing supply (completions, units with planning permission etc.) have increased since Preferred Strategy stage, there will be a net loss in market housing provision and delivery.
This position is made worse and compounded as a result of accounting for the affordable-led sites in making up the housing supply.
As set out within the Preferred Strategy, these sites are expected to deliver at least 51% affordable housing. These units are not open market units, and will not / cannot contribute to the supply of such housing. These units will contribute to the provision of affordable housing, and will go some way to meeting the acute need for such housing (albeit will not eradicate / address in full the well known and accepted considerable requirement). Accordingly it is considered that these sites should be in addition to the housing supply, as opposed to forming part of the provision. In turn, there would need to be an increase in allocations for non-strategic sites, to ensure that there is sufficient market housing delivery over the Plan period.
Were such changes to be made and introduced, this would achieve and assist realise a more robust and sound housing supply, which will ensure that the identified housing need is met / addressed over the Plan period. Without these changes it is considered that the housing supply is not sufficient, and inevitably, housing need will not be met within the Plan.
St Athan Train Station
As set out in the Preferred Strategy (para A3.29), the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,183no. homes to be delivered in St Athan over the Plan period.
It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales. The focus in the first phase of such improvements across the region is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly,
it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that these sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,183no. homes are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
We therefore consider the Trajectory to be both unrobust and unsound, and therefore, we object to the Trajectory in its current form accordingly.
Geographic distribution of the ‘new’ sites / provision
As a general and overarching comment in respect to the additional sites now included within the Plan, and forming part of the trajectory, (and a matter expanded upon when critiquing each of these sites in the next section to this submission), it is clear and evident that these additional sites have been positioned to settlements that have already, and recently, been attributed significant growth in the preceding Plan and plan period.
Significant allocations (which have also contributed to significant levels of affordable housing) have been realised and built out in locations (such as Wick and Colwinston). Notwithstanding this, two of the additional sites are now proposed for these recently expanded settlements. Given that the purpose of the affordable housing led allocations is to meet unmet affordable housing need, it is questioned why such new allocations are attributed to settlements that have already seen open market and affordable housing provision, as compared to other comparable settlements that have not received any growth whatsoever over a considerable period of time.
It is considered accordingly that the geographic positioning of these allocations is at odds with their underlying purpose - to meet unmet affordable housing need in communities that have seen no provision
Detailed Comments in respect to ‘new’ sites
Other Housing Allocations
Land south of Clive Road, St Athan
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
As set out at the outset of these representations, and whilst we note the findings of the Candidate Sites Assessment at Preferred Strategy Stage (i.e. Suitable for further consideration), we do not consider that the consultation on this site has been undertaken procedurally appropriately or suitably. We therefore consider the consultation on this site is “unrobust” and “unsound”.
As set out previously, the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales, where the focus is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites – given their incompatibility with the core strategy of the RLDP.
Affordable Housing Led Allocations Land at Heol Fain, Wick
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
Candidate Site Stage 2 Assessment (Site Ref. 404)
The findings of the Candidate Site Assessment for this site are noted. We are assuming the reason this site is proposed to be allocated is a product of the site promoters/developers heading the findings stated below, and changing the form of development to be in accord with this:
“A market housing led scheme would not be acceptable, but the site could be reconsidered as a small scale affordable housing led development subject to need and viability at a maximum of 50 dwellings. In accordance with the Settlement Appraisal Review, it is considered that Wick could potentially accommodate limited affordable housing led growth.”
Whilst no clear deficiency exists in respect to the site, it is known that Wick has been subject to significant growth and expansion in recent years – not least by virtue of significant housing allocations in the settlement as part of previous plans.
To evidence this, 35% of the 124 units approved on the ‘Rectory Field, St Brides Road’ site (i.e. circa 43 units as per site allocation ref. MG(47) and PP ref. 2014/01424/FUL) were approved as Affordable Housing units. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Wick, further provision ought to be made in comparable (previously unprovided for) locations, such as Ogmore By Sea.
Land West of Maendy Road, Aberthin
‘Land West of Maendy Road’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however as far as we know from our review, there is no assessment and critique of this site. This site has not been included in the ‘Candidate Assessment at Preferred Strategy Stage’ (October 2023). As such, with an absence of publicly available information, it is not clear how the Council has judged this site against the criteria. This raises questions accordingly in respect to the “soundness” of a site which forms part of the intended housing land supply, and by association the trajectory. Without this, and without being consulted on (as others have been prior to this) we question whether this allocation is “sound” (i.e. its allocation is considered to be “unsound”).
Land North of West Winds Business Park, Fferm Goch
The below sets out the candidate site stage two assessment of ‘Land to north and west of Westwinds Business Park’:
Candidate Site Stage 2 Assessment (Site Ref. 398)
As can be seen above, the site was not considered suitable for further consideration, with the site scoring negatively (red) in respect to a number of key factors. These include the following:
• Access to Retail;
• Access to Health Services;
• Sustainable Transport- Public Transport;
• Access/ Proximity to services and facilities conclusion;
• Climate Change; and
• Health and Wellbeing.
Given the fact the site scores red in ‘Sustainable Transport – Public Transport’, this shows the site is not served by public transport connections within 800m, as outlined in the key below:
Additionally, Policy SP7 (Sustainable Transport) of the Vale of Glamorgan Preferred Strategy states “New development must support an enhanced transport network that increases the proportion of journeys being undertaken by sustainable travel modes”. Additionally Objective 8 (Promoting Active and Sustainable Travel Choices) states “new development is directed to locations that are or can be accessible by a choice of modes of transport, including walking, cycling, and public transport.”
It is well known that residents of affordable housing are statistically less likely to own private vehicles, making access to reliable and frequent public transport essential for ensuring equitable mobility. The provision of public transport infrastructure in close proximity to such developments is therefore a critical component in supporting access to employment, education, healthcare, and other key services, while also promoting sustainable travel patterns and social inclusion.
The site also scores red in respect to Access/Proximity to services, showing the site is greater than 1200m away from key services, as seen in the key below:
In respect of the above, Preferred Strategy 6.40 states the need “To ensure that new development takes place in locations that have the best access to a wide range of services, facilities, and employment opportunities, whilst minimising the need to travel, the distribution of growth is guided by the following settlement hierarchy”. To further highlight the importance of both sustainable transport and proximity to services, the preferred strategy also states the need to “Facilitate the development of adaptable, accessible, well-connected communities that have a strong sense of identity, offer a sustainable range of services and facilities and are equipped with adequate infrastructure”. In addition, Promoting Active and Sustainable Travel Choices outlines to “Promote and encourage the use of sustainable methods of travel, particularly active modes of transport, whilst simultaneously reducing the need to travel”.
In light of the above, this site does not align with the aims and targets set out in the Preferred Strategy, as it fails to meet several key development goals set out. It should therefore not be considered suitable to be allocated for future developments. Its inclusion is therefore unsound.
Should this view be concurred with, 22 affordable units will be lost from the proposed affordable 122 units, and ultimately will be lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is removed and/or not delivered as its inclusion is unsound as it does not align with the aims and targets set out in the Preferred Strategy - as it fails to meet several key development goals set out. A “small scale
affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” will therefore not be provided for. This is clearly an issue.
When comparing this with ‘Land at Hazelwood, Ogmore By Sea, the following is set out:
Access to Services and Facilities
This criterion has been assessed firstly on the location of the site proposal in terms of whether it is located within, adjacent to, or outside a settlement, and secondly the ease of pedestrian and cycle access to key services listed below.
With reference to the above:
• In terms of public transport, there are two bus stops located approximately 200m (3-minute walk) from the site (‘Ogmore By Sea Post Office’), with the ‘303’ providing services between Llantwit Major and Bridgend.
• The site is located 200m (3-minute walk) from the ‘Ogmore By Sea Post Office’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
• The site is also located 50m (1-minute walk) from a children’s park.
These services and facilities are therefore well within the best category (i.e. categorised/scored as ‘green’) - within 800m of site (10-minute walk). Accordingly, the site therefore has good access to services and facilities. This
Furthermore, the settlement of Ogmore By Sea has been ranked higher than Llangan (which the site ‘Land to north and west of Westwinds Business Park’ is located within) in the VoG Sustainable Settlements Appraisal, and therefore, is considered to constitute a more sustainable location to accommodate residential growth. Most notably, Ogmore By Sea scores ‘13’ in respect to ‘Daily Facilities’ whereas Llangan only scores ‘3’, evidencing that residents in Ogmore have much better access to services within the locality as compared to Llangan.
Given the above, ‘Land at Hazelwood, Ogmore’ does/should align with the aims and targets set out in the Preferred Strategy as it meets several of the key development goals set out. Its inclusion should therefore, in our view, be considered “sound” and therefore suitable to be allocated for future developments. The site should properly and appropriately be allocated in lieu of ‘Land to north and west of Westwinds Business Park’ – the inclusion of which is “unsound”. ‘Land at Hazelwood, Ogmore’ would therefore ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help
sustain services and facilities within these rural communities”, are provided for. As such the proposed housing trajectory would be maintained.
Land to the East of Colwinston, Colwinston
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below:
As outlined above, the site was rejected and considered not suitable for further consideration. In fact, and unlike ‘Land at Heol Fain, Wick’ and ‘Land to north and west of Westwinds Business Park’ it was stated that this site “could not be considered as a suitable affordable housing led development site”. Despite this, this site is identified to be allocated as an Affordable Housing Led Allocation. As such, the inclusion of this site is “unsound”.
It is known that Colwinston has been subject to significant housing allocations in the settlement as part of previous plans. To evidence this, 25% of the 64 units (i.e. 16 units) were approved on the site allocation ref. MG2(41) and PP ref.
2014/00242/FUL. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Colwinston, further provision ought to be made in comparable (previously unprovided for) locations, such as Ogmore By Sea.
Summary of These Representations
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised above in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 7171
Derbyniwyd: 11/04/2026
Respondent ID: 2373
Ymatebydd: Wig Fach Property Company Ltd
Asiant : Geraint John Planning Ltd
It is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands.
Amend supporting text.
ANNEX 1
Preface
This Annex sets out the detailed case in support of these representations, and by association the case for allocation of the site.
The representations are structured into the following sections:
1. Response to the Deposit Plan;
2. Comments on specific policies; and
3. A summary of the suitability of the site for development.
SECTION 1. Response to the Deposit Plan
Distribution of Growth
We object to the distribution of growth within the Deposit Plan. Specifically, we object to the strategy that underpins the Deposit Plan, which seeks to introduce the proposed ‘Strategic Growth Area’ which is expected to contain the majority of housing growth in the Vale over the Plan period, or rather the over-reliance on this defined area, and the associated absence of growth in other parts of the Plan area.
As outlined in our previous representations, the allocation of housing and the location of strategic growth neglects the Rural Vale, and in our view, overprovides in the Strategic Growth Area. For example, with limited housing stock and average house sales at over £500,000 over the last 12 months, there is a clear and established need for new homes in the Ogmore By Sea area, particularly at an affordable level. This is reinforced by the Local Housing Market Assessment that identified a need for over 1,114 new affordable homes per annum over the next five years throughout the county, and 196 units per annum thereafter (average of 502 units per annum over 15 years). Further to this, it is widely known that the rural Vale comprises the majority of the county’s ageing population, which, as a demographic, has and will continue to grow rapidly over the Plan period. This is evident in the ‘Population Change’ chart below – which is taken from the Deposit Plan:
VofG Deposit Plan: Figure 4 Population Change 2011 to 2021
It is clearly the case that younger populations are migrating to other Authorities, where access to housing is typically cheaper and more affordable, whilst more older populations are significantly migrating into the Authority. This trend will result in an extremely unbalanced demographic, given that the working-age population have sought housing elsewhere.
Without a suitable supply of affordable housing delivered over the Plan period, this trend will only worsen. Accordingly, it is not considered that the RLDP takes into account the lack of supply of affordable homes within the rural Vale, as well as increased housing to support the growing ageing population within these areas.
Para 3.19 of the Deposit Plan clearly outlines that affordable housing is required in the short term, in order to meet pressing needs. Specifically, it outlines the following: “There is significant pressure on temporary accommodation in the Vale, for a variety of reasons including increased homelessness presentations… The need for sufficient permanent affordable housing to assist in moving people out of temporary accommodation is critical and the planning system has a vital role in assisting in new affordable housing delivery.”
Accordingly, the distribution of growth within the Authority must be proportionate, to ensure that populations / areas are not left behind where they must seek access to housing elsewhere.
The RLDP Sustainable Growth Strategy sets out 6 objectives. Objective 4 states: “Allowing for small scale affordable housing led development in settlements outside the Strategic Growth Area at a scale proportionate to the size of settlement.” (Page 66)
Para 5.25 states “Therefore, a key part of the strategy is to allow for affordable housing led developments within sustainable primary and minor rural settlements outside of the Strategic Growth Area, at a scale that is appropriate to the size of the community it is serving. An ‘affordable housing led’ scheme is one where a minimum of 50% of the dwellings would need to be affordable, although this could increase to a maximum of 100% if the site is brought forward by a social landlord”.
In terms of the definition / explanation of what the affordable housing-led development sites are seeking to achieve, paragraph 6.132 of the Deposit Plan outlines the following:
“Accordingly, to ensure that new developments respond to the high demand for smaller properties, as identified in the LHMA, priority will be given to affordable homes that are small to medium-sized, typically comprising one to three bedrooms. Representations received from the local community through the RLDP process also highlighted a desire for new housing developments to offer opportunities for accessing smaller market homes. This is particularly relevant in the rural Vale, where housing choices are more limited. Providing smaller, more affordable market homes may assist first-time buyers and enable older residents to downsize to more manageable properties within their local area. Affordable housing-led sites will therefore need to demonstrate that an appropriate range of both affordable and market dwellings has been provided.”
Despite the acknowledgement within this strategic objective, we do not consider that the RLDP goes far enough to meet this objective, nor are its provisions and allocations adequate.
It is considered that this objective is undermined by the allocations set out by the RLDP (not least the absence of allocations in the rural Vale). Notwithstanding the Vision’s clear acknowledgement of the benefit of the growth of the rural Vale, these areas have not been supported through the plan due to the lack of growth which has been attributed to these areas in terms of further housing, employment and sustainable transport. All growth options have been selected on the basis of being in either Key Settlement, Service Centre settlement or Primary Settlements, all of which are already sustainable areas served by rail. As a result, it is not clear how this objective can be achieved, without the allocation of further sites within the Minor Rural Settlements, such as Ogmore By Sea. The Vale is characteristically ‘rural’, and as such, there needs to be a stronger emphasis on supporting and delivering new development in order to bolster the rural economy. This includes enabling opportunities to provide employment and business premises within
/ near to rural settlements, as well as focusing housing growth in these areas to reduce travel time, and use of sustainable transport.
It is considered that the current Strategy does not provide adequately for all residents across the Vale, only those within the Strategic Growth Area. The underlying Vision and Objectives set out in the emerging Plan are accordingly wholly un-provided for by the detail of the Plan. This brings into question the “soundness” of the Plan.
The Strategic Growth Area does not take into account the important role and proximity of Bridgend to the West and/or the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north (as defined in the RCTCBC LDP). The Minor Rural Settlements to the west are more likely to be supported by job opportunities and employment in Bridgend than further east in Barry or Cardiff. Similarly, those in the north align with, and function in association with, the Principal Settlement and Strategic Growth Area of Talbot Green / Pontyclun / Llantrisant to the north. These settlements are served by existing bus services that provide sustainable modes of travel to key employment locations in and around Bridgend. This is acknowledged in Paragraph 3.3 of the Strategy which states “The greatest number of residents who travel outside of the Vale for work purposes travel to Cardiff followed by Bridgend and Rhondda Cynon Taf, whilst a smaller proportion commute into the Vale from these neighbouring authorities”. The Demographic Evidence (Feb 2023) estimates the Vale as being a net importer of workers from RCT and Caerphilly (Para 3.6) - as shown in Figure 10 in the Preferred Strategy.
The current Strategy does not support any improvement of sustainable travel or further investment in settlements linked more closely to these areas - given that Growth has been apportioned in only the Key Service Centre and Primary Settlements. It is considered that this will fail to support and facilitate the current (and any future) employment coming into the Vale, nor will it support any employment which is located outside of the Vale to the West and North. The Growth Option is too heavily reliant on access to railway stations as the key and sole sustainable transport method, whereas access to bus services should also be appropriately assessed and focused on in terms of promoting sustainable development. It is unreasonable to devise a strategy that hinges on directing growth to areas that are accessible to railway facilities, where it is recognised in the Plan that the Vale is inherently rural. The delivery and soundness of the Plan is therefore questioned and we continue to object to the spatial growth strategy as set out in the Deposit Plan.
Housing Supply
RLDP Allocations - Key Sites
As set out in representations made throughout the Plan preparation process, we consider that the Plan is too reliant on the delivery of ‘key sites’ to meet the housing need over the Plan period. Specifically, the Plan makes provision for 2,278 units in these Key Sites, which equates to circa 65% of RLDP allocations in the housing supply. The 5 key sites that are allocated in the Deposit Plan are as follows:
• Land at North West Barry – 376no. units;
• North of Dinas Powys – 250no. units;
• Land at Readers Way, Rhoose – 520no. units;
• Land at Church Farm, St Athan – 532no. units; and
• Land to the West of St Athan – 600no. units.
We object to the current housing supply to allocate 2,278no. (65%) of units across strategic sites, as this makes for a risky and unrobust strategy for delivering housing, and in turn, meeting the identified housing need over the Plan period.
As stated in previous representations, there is concern that the proposed timing and phasing of the proposed Key Sites is unrealistic and unrobust, and in turn, undermines the soundness of the Plan, given the heavy reliance on Key Sites delivering new homes across the Plan period. Whilst it is not disputed that the sites would have gone through rigorous assessment to inform their proposed allocation, the timescales for securing planning permission (with all associated conditions discharged) is considered to be unachievable. This is particularly the case for the following timescales that are set out in the Housing Trajectory that underpin the Plan:
• “Time period of pre-application discussions/PAC consultation” – 4 months
• “Time between submission of planning application and determination” – 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” – 4 months
It is considered that the above timescales are fundamentally unrobust, and result in a distorted position of housing sites over the RLDP Plan period. It is not considered that these reflect or are informed by the timescales that are currently being incurred for planning applications submitted for major housing sites across Wales. It is rather the case that such applications would typically be determined 1-2 years following submission, given that there are a wide range of stakeholders involved in the determination of major planning applications – which often adds to the delays associated with the determination of such applications.
It is equally the case that the assumptions in the trajectory are solely based on expected timescales for processing formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission.
It is assumed that these timescales have not considered that such major developments can be subject to the need to undertaking and submitting an Environmental Impact Assessment (EIA), which adds another layer to the determination of any planning application – given the additional considerations that form part of this process. As such, any site subject to EIA would very likely result in further delays extending beyond the timescales set out in the trajectory. Equally, as set out above, the preparation of an application subject to an EIA requires even more detail and assessment, which only further adds to the preparation stage (which has not been factored into as part of the trajectory). Accordingly, it is not considered that the trajectory contains any contingency if any site is required to undertake EIA as part of their application.
For the reasons stated above, it is unlikely that the sites will yield in full, particularly those sites which are expected to deliver housing right up to the final year of the Plan period (‘Land at Readers Way’ and ‘Land to the West of St Athan’). These sites do not allow for any ‘slippage’ should any delays arise through the development management process (which for the reasons set out above, will very likely be the case), and as such, a gap in housing delivery will be brought about as a result of these sites not yielding in full.
Given the proposed ambitious timescales set out for the delivery of the Key Sites, it is considered the housing trajectory is unrobust, and in turn, undermines the soundness of the Plan as a result. A change in strategy should be pursued whereby a greater proportion of small to medium sites are allocated for housing in the Plan period, which are more likely to fully yield given that such sites are subject to less assessment and consideration compared to strategic sites. This would make for a more robust strategy, where a greater number of small to medium sites can deliver housing in the short and medium term of the Plan period, whereas the strategic sites represent a more longer-term strategy to deliver housing – which would then spill into the next Plan period.
Accordingly, we object to the Deposit Plan in its current form, where there is an overreliance on housing need to be met through the delivery of the Key Sites, which we consider to be unrobust, and undermine the integrity and soundness of the Plan. The current strategy of the Plan is at significant risk of not delivering the level of housing expected based on the sites allocated, as least as swifty as identified in the housing trajectory. Should no change be made to the Plan to address the above issues, then it is extremely likely that the Plan would ‘fail’ in meeting the identified housing need.
Windfall Sites
It is noted that the RLDP is made up of the following:
• Existing land supply (3,838 units)
• Windfall sites (1,303 units)
• Allocated sites (3,521 units)
Para 6.69 states that “Analysis of historical delivery of housing indicates that on average small windfall sites (sites of less than 10 dwellings) have provided some 53 dwelling completions per year, and large windfall sites (10 dwellings or greater) contributed on average 80 dwellings per year. Overall, it is projected that windfall sites could contribute a further 1,303 dwellings over the remainder of the plan”.
As set out in our previous representations to the Housing Trajectory, we would object to the expected numbers of completions expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan – which is discussed in greater detail later in this submission. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated – including any windfall sites.
St Athan Train Station
The RLDP Sustainable Growth Strategy comprises six key elements, of which the following is set out in respect to the allocation of new housing growth in the Authority:
“3. Focusing development at locations that are well served by existing and proposed rail stations as part of the South Wales Metro and in areas with good bus links.”
The strategy outlines that a feasibility study for a station in St Athan had been undertaken in 2022, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ and 80no. units attributed to ‘Former Stadium Site, adjacent to Burley Place’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,263no. homes to be delivered in St Athan over the Plan period.
It is now the case, however, that the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales – as confirmed in the ‘Today, Tomorrow, Together: A vision for rail across Wales and Borders’ (February 2026) recently published by Transport For Wales. This paper acknowledges that a new railway station at St Athan would represent a longer term opportunity, and therefore, will not be delivered in the short term / within the Plan period of the emerging Plan. Equally the Council have not provided any evidence to contradict this, and therefore, it is very unlikely that any new train station will be delivered in St Athan over the Plan period. This brings about significant questions regarding the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,263no. homes (36% of the Plan’s new housing allocations) are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
In terms of the expected delivery of the Key Sites in St Athan, it is noted that the trajectory identifies that for the majority of the Plan period, both sites will be delivering 80no. dwellings per annum on each site (equating to 160no units in total). Whilst these are two separate sites, we seriously question the realistic prospects of the significant number of
homes being built simultaneously on two sites in proximity to one another – given the considerable logistical issues that would be brought about.
Accordingly, it remains that there are serious questions regarding the suitability and acceptability of the proposed allocations at St Athan, which do not accord with the strategy adopted for the RLDP – to focus housing growth on settlements that are supported by railway stations. Moreover, the scale of development proposed at St Athan is also not considered to be proportionate, with a significant number of homes delivered in a location not served by a railway station.
Rolled forward LDP Sites
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current Plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application
submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ’soundness’, and risks rendering the Plan unrobust.
Housing Delivery Rate Assumptions
As set out in our previous representations to the Housing Trajectory consultation, we have considerable concerns in relation to the proposed delivery of the sites identified in the trajectory – which we do not consider are robust or reasonable.
Appendix 1 of the Deposit Plan sets out the development trajectory bar chart – which illustrates the proposed delivery of housing, on a per annum basis, over the Plan period.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
It is our view that the trajectory makes for an unrealistic and unrobust delivery rate of housing, which does not reflect the pattern of housing completions in the Vale of Glamorgan. We therefore have concerns regarding the soundness of the trajectory, not least that there remain significant uncertainties as to the delivery of the Key Sites (as discussed earlier in these representations).
Firstly, the graph / trajectory illustrates a large ‘spike’ in terms of housing delivery in the year 2027-28, which is considered to be a marked and pronounced step change in the rate of delivery. This envisages / relies on a significantly higher rate of delivery than previous years in the Vale of Glamorgan (2021 through 2021 – as depicted by the green columns). It is considered that this level of delivery is unlikely to materialise, not least given prevailing market
circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions from 2021 - 2025 has been approx. 400 - 500 units, however, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100% relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
It is also the case that the anticipated delivery of housing fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2025.
Accordingly, we consider that the housing trajectory, as proposed, is entirely manufactured and unreflective of the past completion rates, as well as the recent published completion rates provided by Welsh Government recently in August 2025. As set out in our previous representations, it has been evidenced that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1: ‘New House Building: April 2024 to March 2025’
As identified in the graph above, in 2024-25, 4,631 new dwellings were completed, which represents 3% fewer than the previous year. This figure represented the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed) The New Housing Pipeline Report Quarter 3, 2025 Report (December 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 7% during the third quarter of 2025, extending the decline seen during the first half of the year. At 45,075, the number of units approved was 34% down on the third quarter of 2024 and the lowest quarterly total since 2012 Q2. At 146,798, the overall number of units approved during the first nine months of 2025 was 25% lower than a year ago.
HBF Graph Illustrating Residential Approvals (2006-2025)
The above graph clearly shows a pronounced downward trend in the number of residential planning approvals over the period, particuarly with a sharp decrease seen since 2020. Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
More recently, the Welsh Government has released its new estimates of housing need (Estimates of Additional Hosing Need: 2025-based – February 2026). The estimates show how many new homes need to be built over the next twenty years to address existing unmet need as well as newly arising need. The figures set out that around 8,700no. new homes a year are needed over the next Senedd term up to 2030 to meet new housing need. Additionally, there is an unmet need for 9,400 affordable homes.
Overall, this represents more than double 2024/25 levels of supply, where just 4,638 new homes were built.
HBF: Estimates of Housing Need
HBF: Actual Delivery vs Estimates of Need
The above graphs unequivocally evidence that historical rates of delivery of housing in Wales has remained low, and moreover, significant numbers of housing need to be allocated in order to meet the estimate of need. It is not
considered that the housing trajectory, in its current form, is robust to meet the housing need over the Plan period, given the uncertainties of the Key Sites, and the level of housing delivery that has been identified for the Plan.
Affordable Housing-Led Sites
HG4 - Rural Affordable Housing Led Sites
Policy HG4 of the Deposit Plan identifies four sites to be allocated as affordable housing-led sites, totalling approximately 122 dwellings within the plan period. Given the target levels of achieving 3,070 affordable dwellings over the course of the Plan period (up to 2036), it is not considered that this policy goes far enough to address the target and level of affordable housing need.
It is noted that the number of units identified for each site relate to the ‘total’ number of units delivered, as opposed to the affordable housing provision. Accordingly, it can be assumed that circa 50% of each allocation will comprise affordable units (given each site is affordable-led), which would equate to a total provision of circa 61no. units. The contribution from the affordable housing-led sites would only equate to 2% of the total need (3,070no. units). Even when coupled with the affordable housing provision from open market sites and 100% exception sites, the total delivery of affordable housing will still be nowhere near enough to meet the overall affordable housing need over the Plan period. Accordingly, it is considered that inadequate provision has been made for such sites.
Insofar as to the sites chosen and allocated are concerned, it is clear from reviewing the Stage 1 and Stage 2 Candidate Site Assessment that the allocated sites HG4(1) – (4) were not considered acceptable due to being outside the strategic growth areas, and were considered to be unacceptable intrusions into the open countryside. After being resubmitted as affordable housing-led sites, the sites were allocated, some with a smaller area in order to accommodate less dwellings in total.
The sustainable credentials of the sites allocated is not disputed, and it is acknowledged that these minor rural settlements have the ability to accommodate further growth, in the form of affordable-led housing allocations. However, it is considered that the should also form an allocation as part of this policy, given its high sustainability credentials and its appropriate location to accommodate a suitable level of development. Please refer to the previous representations made to the Housing Trajectory Consultation (dated 17th October) for further, more detailed comments regarding the above sites.
The LHMA 2023 shows that there is a need for 124 affordable homes in the St Brides Major local housing market area (which Ogmore is located within). As such, there is an identified need for affordable housing in this area, something which the site could address through an allocation.
It is questionable whether Wick has the capacity to accommodate 50 new dwellings, given the sustainability and rural nature of the area. As a result, it is suggested that the number of homes allocated in Wick is reduced and that a further allocation in St Brides Major is secured, in order to facilitate supporting the delivery of affordable housing through the housing market area, rather than in one minor rural settlement. The sustainability of Ogmore has been assessed, both by the Council through the Sustainability Appraisal and again, through our assessment of the site.
Securing further delivery of Affordable Units
As set out above, the affordable housing-led allocated sites only provide 122no. affordable dwellings, which comprise 4no. allocated sites that are expected to deliver approximately between 20 – 50 dwellings. However, the RLDP sets a
target of 3,070 affordable homes to be delivered in the Plan period. This means that affordable housing-led allocations make up less than 4 % of the target provision and will only make provision for 2% of the targeted number. We would therefore object to the sites included within Policy HG4 and would suggest that more sites should be allocated as part of the policy in order to secure delivery of a higher number of affordable housing units to mere the target.
Whilst it is acknowledged that the Key Sites will provide for a significant proportion of affordable housing, as set out above in these representations, there is serious concern regarding the deliverability of these sites, which would result in a significant gap of affordable housing delivered.
A greater number of affordable housing-led sites allocated would ensure there is sufficient contingency built into the Plan, to ensure that the overall affordable housing need is met over the Plan period. Failure to do so would result in affordable housing need being unmet, with demand continuing to outstrip supply.
Previous representations to the Preferred Strategy (dated 14th February 2024) provided comment on the sustainability scoring of Ogmore and the proposed site. As outlined within these representations, it is considered that the site (ID xxx) represents a sustainable, deliverable and acceptable site. The site is within a maximum of a 22- minute bus journey to a every key service listed, due to the proximity of the site to settlements such as Bridgend. Due to the availability of frequent bus services, and active travel links, these key services are readily available to access for any residents within Ogmore By Sea without the need to travel by car. The site is located within 5 miles of Bridgend, and within a maximum 22-minute bus journey of the following services:
• St Brides Primary School;
• Brynteg Comprehensive School;
• Bridgend College;
• Riversdale Surgery; and
• Bridgend town centre for various Retail Services
Moreover, Ogmore has benefitted from the recent development of the Ogmore By Sea Village Hall, which provides space for community activities and events to take place. The hall also includes a coffee shop (Welsh Coffee Company), which only adds further to the daily services provision available within the settlement. Access to the hall and coffee shop is directly provided for pedestrians from the Main Road, which allows for direct access from the site.
Accordingly, the settlement of Ogmore represents an acceptable location to allocate an affordable housing-led site, given the access to existing services and facilities that would serve future residents of the site.
It is acknowledged that the site also lies within the Glamorgan Heritage Coast and this point is addressed further below.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of Ogmore By Sea, support the surrounding settlements, and the Plan area as a whole. As such, the site should be considered further.
Comments on Specific Policies
HG5 - Affordable Housing Exception Sites
Given the unmet need and extant backlog of affordable housing, as identified within the LHMA (2023), it is noted that an Affordable Housing Exception Sites policy has been adopted in order to assist in the delivery of affordable housing. Policy HG5 sets out the specific criteria where proposals for 100% small scale affordable housing developments will be permitted outside settlement boundaries. The current policy wording for the Affordable Housing Site Exception Policy and the criteria listed out in the policy is generally supported.
That said, it is noted that a ‘cap’ of 10 dwellings (as referenced within supporting text Para 6.140) is set. This should be amended due to such a ‘cap’ limiting the flexibility of the policy, in particularly for sites coming forward as part of this policy in Minor Rural Settlements.
As such, we would suggest that supporting Para 6.140 should be amended in order to allow for further flexibility for sites in Minor Rural Settlements to come forward and to deliver affordable housing, given that the criteria set out in the policy would already protect and restrict the extent of any development as it stands. Therefore, the proposed amendments to Para 6.140 are outlined below in red:
6.140 “For the purposes of this policy, ‘small-scale’ will generally mean no more than around 10 dwellings on sites adjoining Minor Rural Settlements. In Primary Settlements outside the Strategic Growth Area, proposals for more than 10 dwellings may be acceptable where required to meet a specific need and where the number of dwellings is proportionate to the size of the settlement. In assessing the scale and extent of any proposed local needs housing, consideration should also be given to affordable housing already planned in the ward or nearby area, including sites with existing planning permissions and those allocated in the RLDP. The size and type of affordable housing proposed should reflect the identified local need in the area.”
The above suggested wording would achieve a more flexible policy, which would allow for a variety of scaled applications to secure planning permission for solely 100% affordable housing across the Authority area. This greater flexibility would enable the policy to make a significant contribution towards meeting the affordable housing need – which, as set out earlier is in considerable need.
Policy DNP3 – Glamorgan Heritage Coast
Given that the site is located in the Glamorgan Heritage Coast, it is noted that the following policy is of relevance to any future development on the site. Criteria 4 of Policy DNP3 states:
“The special environmental qualities of the Glamorgan Heritage Coast will be conserved and enhanced. New development will be restricted to:
4. Other appropriate and sustainable development that accords with National Policy.”
It is also noted that supporting Para 6.422 “In seeking to protect the Glamorgan Heritage Coast, the Council acknowledges that there are some built up areas within the boundary, including the Minor Rural Settlement of Ogmore. In addition, the Vale of Glamorgan rail line crosses part of the Heritage Coast designation in the location where a new station at St Athan is proposed. Whilst being mindful of the need to protect the special qualities of the Glamorgan Heritage Coast, the Council accepts that development within these areas is appropriate, subject to relevant policies of the Plan”(GJP emphasis).
We would offer general support for this policy, and consider this to provide flexibility which allows for certain forms of development. However, we would suggest that the policy wording should be amended to reflect that ‘housing’ should be supported in the Glamorgan Heritage Coast, providing that the policy exceptions are met. Therefore, the following amendment is proposed as part of the policy should be changed to include “small scale housing” or something similar. The proposed amendments to Policy DNP3 are outlined below in red:
“The special environmental qualities of the Glamorgan Heritage Coast will be conserved and enhanced. New development will be restricted to:
4. Other appropriate and sustainable development, including small-scale housing proposals that accords with National Policy.”
Again, this would ensure that suitable housing developments can be delivered in the Plan period, to meet the housing needs of the Vale of Glamorgan – particularly in respect of affordable housing.
SECTION 3. Suitability of the site for development
The site promoter objects to the overall assessment of the site, in that it is not considered suitable for further development in the Plan. The promoted site has undergone extensive scrutiny and appraisal at a high level to ascertain the qualities of the site, in light of all identified material considerations which relate to the proposals.
The delivery of the site will yield much needed housing (including Affordable housing) and contribute to the overall supply in the new Plan period, whilst making effective use of a suitably located site for residential development.
Moreover, as set out in ‘Annex 2’ of our representations, the site has overcome the ‘constraints’ set out in the Candidate Site Assessment undertaken for the site, which demonstrates that the proposal is both acceptable and deliverable.
SUMMARY AND CONCLUSIONS
In summary, the site promoters:
• Object to the distribution of growth proposed for the Plan area, with a more balanced and equitable distribution of housing sites required in order to meet the identified housing need;
• Object to the level of growth identified for the Plan period;
• Object to the housing trajectory that underpins the delivery of housing within the Plan period – which is considered to be unrealistic and unrobust, leading to serious uncertainty regarding the “soundness” of the Plan;
• Object to the over-reliance on Key Sites and Rolled Forward Sites in making up the Plan’s housing land supply;
• Object to the scale and timing of delivery of sites in / around St Athan – all of which are predicated on railway station provision which will not be realised in the Plan period;
• Object to the under-provision of sites under Policy HG4 – Rural Affordable Housing-Led sites, not least given their extremely limited contribution to the targeted need for affordable housing;
• Object to Policy DNP3 – Glamorgan Heritage Coast, given the lack of recognition for the potential for small-scale housing proposals;
• Object to the current wording of the HG5 Policy ‘Affordable Housing Exception Sites’ which requires greater flexibility to play an important role in delivery much-needed affordable homes across the Authority; and
• Object the Council’s assessment that the site is not considered suitable for development.
The site and proposals are consistent with the RLDP strategy, other Vale of Glamorgan strategies, and the requirements of Planning Policy Wales and Future Wales. It will make a significant contribution to the Vale’s identified housing requirement in the RLDP period and will provide for a wide range of uses that will support the wider community whilst embodying principles relating to placemaking and the well-being of future generations.
The site has no fundamental constraints and has the ability to deliver significant economic, social and environmental benefits for the benefit of future residents and the existing local community. The site is demonstrated to be viable, being able to deliver policy-compliant levels of affordable housing and given its location within a strong market area, will benefit from high delivery rates.
ANNEX 2
SECTION 4. A summary of the suitability of the site for development including a Response to the Candidate Site Assessment
This section of the overall representations to the Deposit Plan is to respond to, and address, the Council’s assessment of the site.
While the issues the Council have raised in their assessment of the site have been addressed and discussed within the representations made at the Preferred Strategy stage of the Plan, a similar ‘scoring’ exercise has been undertaken as part of the evidence base for the Deposit Plan. As such, it is still pertinent to consider and respond to the Council’s assessment of the site as part of these representations
The Detailed Site Assessment for Land at Hazelwood, Ogmore By Sea (Site ID: 3855) sets out that the position of the site at the Deposit Stage is as follows:
“The original site as ruled out as the development would represent unacceptable intrusion in to the open countryside. Whilst the site has now been identified for an affordable housing led development, the original reason for ruling it out still remains.”
In terms of the assertion that “the development would represent an unacceptable intrusion into to the open countryside”, this is strongly disputed, in that the development of the site would represent a natural rounding off of the existing settlement boundary. An extract of the site relative to the settlement boundary is provided below, which clearly shows that the development of the site would not extend beyond the existing settlement pattern that exists in Ogmore.
Site Outlined in Red and Settlement Shaded in Blue
As clearly demonstrated in the above mapping, the site would extend no further eastwards than the existing housing area to the south of the site. Equally, the site would not be extending any further north than the existing settlement pattern in Ogmore. This position is further supported by the wider aerial view of the site provided overleaf:
Wider Aerial View of Site Outlined in Red and Settlement Shaded in Blue
In summary, it is considered that the proposed allocation of the site represents a logical rounding off of the existing settlement, as depicted in the mapping provided above – where the site follows the existing envelope of the settlement. The site does not extend any further eastwards than the established built form located immediately to the south; indeed, it sits comfortably within the same development line.
As such, it cannot be considered that the site represents an ‘intrusion’ into the countryside, as the site would be visually and functionally related to the settlement. It therefore follows that the site would be read as part of the settlement, and not the wider rural landscape.
Candidate Site Assessment
The Detailed Site Assessment undertaken by the LPA includes a summary and assessment of the ‘scoring’ system used at the Preferred Strategy stage. A comparison between the site assessments undertaken at both the Preferred Strategy stage and Deposit Plan stage is provided overleaf for reference.
Site Assessment at Preferred Strategy Stage Site Assessment at Deposit Plan Stage
As demonstrated above, there are no changes to the scoring attributed to the site. Detailed submissions were made on the previous assessment undertaken by the Council at Preferred Strategy stage, and as such, should be read in conjunction with this submission (see Appendix A).
Sustainability
Notwithstanding the above, it is considered that the site represents a more sustainable location than what was previously assessed at Preferred Strategy stage, in light of the Ogmore by Sea Hall development. The Hall acts as a community facility, whereby the space is available for hire by local community groups such as birthday parties, weddings, group meetings, and other such similar uses. Moreover, a café (Welsh Coffee Co) is located within the premises which sells both food and drink.
The hall and café are within walking distance to and from the site, where new access facilities have been implemented from Main Road directly to the building, to allow access for pedestrians and cyclists. This is illustrated in the image below:
Walking and Cycling Facilities
The Tusker Rock pub and post office are also located along Main Road, all of which are within walking distance to the site.
Accordingly, the site is well served by new amenities (i.e. community hall) that comprehensively improves the sustainability of the site / settlement, and in turn, improves the sustainability credentials of the site promotion. It therefore follows that the site represents an acceptable location for residential development, and the site should be looked upon favourably accordingly.
It is also the case, as set out in previous representations, that the site is within a maximum 22-minuted bus journey of the following services and facilities:
• St Brides Primary School;
• Brynteg Comprehensive School;
• Bridgend College;
• Riversdale Surgery; and
• Bridgend town centre.
As such, key services and facilities can be access by sustainable travel over and above the existing level of provision available in Ogmore By Sea (as discussed above).
Accordingly, the relevant ‘red’ scorings in the Council’s assessment should be updated to reflect the site’s suitability and sustainability to accommodate the proposed residential development of the site.
Glamorgan Heritage Coast
Insofar as to the position regarding the site’s location within the Glamorgan Heritage Coast, detailed submissions are made not only in the Preferred Strategy representations, but also in Annex 1 of this submission. In short, given the pressing need for such development (particuarly affordable housing) to come forward in the Plan period to meet ever-increasing needs, development of this nature should be considered more favourably – not least that, as outlined in this Annex, the site would not extend any further that the existing settlement boundary.
Accordingly, the site would be perceived to form part of the settlement of Ogmore By Sea, and not the wider landscape, and therefore, would not have any detrimental impact on the Heritage Coast in any respect. The scoring should be amended accordingly to reflect this position.
Climate Change
As outlined in previous representations, the development will incorporate climate change measures, such as EV charging points, PV panels, as well as adopting sustainable materials for construction whilst maximising the potential for the dwellings to be energy efficient. Accordingly, the development will be built to high sustainable standards, and therefore, the scoring of the site should be amended as a result.
Summary and Conclusion
It has been evidenced above that there are no fundamental constraints at, or associated with the site, that would preclude the site coming forward for development in the RLDP period.
To conclude, the settlement, location and site are inherently suitable and deliverable, and will make a significant contribution to achieving and realising the housing and economic development needs of the Vale of Glamorgan.
Summary of These Representations
In short, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised below in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.
Preface
This Submission sets out the detailed case in support of these representations. The representations are structured as follows:
1. Procedural Consultation Matters;
2. Timing Assumptions underpinning the Trajectory;
3. Housing Delivery Rate Assumptions;;
4. Status & Standing of Sites included in the Trajectory;
5. Key Sites;
6. St Athan Train Station;
7. Geographic distribution of the ‘new’ sites / provision;
8. Detailed comments in respect to ‘new’ sites;
9. Conclusions Procedural Consultation Matters
Firstly, we do not consider that the consultation on the Housing Trajectory information has been procedurally undertaken appropriately or suitably.
Only 14 days have been afforded to parties to make representations on the information provided. This is despite new sites being introduced (at this late stage) i.e. Land South of Clive Road (identified in Table 4), as well as a number of affordable housing led housing sites being introduced (i.e. those outlined in Table 5). This does not provide an adequate process or timescale for objectors to scrutinise the published content, and to make comments on sites which have been presented for the first time at a late stage in the process.
As part of these representations, we will be making brief comment on the sites which have not been previously consulted upon, namely:
Other Housing Allocations
• Land south of Clive Road, St Athan;
Affordable Housing Led Sites
• Land at Heol Fain, Wick;
• Land west of Maendy Road, Aberthin;
• Land Noth of West Winds Business Park, Fferm Goch; and
• Land to the East of Colwinston;
It is considered necessary to comment on these sites, given that they form an important and critical part of the housing trajectory, and by association in the Council and Plan reaching their targets. Moreover, these sites have not been consulted on previously. Accordingly we consider it necessary to pass comment on these in order to ensure that the consultation is fair and robust.
As well as limited time given to comment on the information contained within the Housing Trajectory, the LPA have failed to set up a Housing Stakeholder group to agree and discuss the trajectory information and data – with the cover email to the consultation (dated 3rd October 2025) stating “it is considered that it would be the best use of stakeholder time to conduct this engagement via email, particularly as many of the forecasts have been developed in consultation with site promoters including developers and their agents”.
We submit that the stakeholder consultation has not been a transparent nor robust consultation process, given that the Development Plans Manual states at Para 5.66 “A housing trajectory must be prepared to support the Deposit Plan. In order to generate a housing trajectory and associated phasing tables it will be necessary for LPAs to engage with stakeholders through a Housing Stakeholder Group. This will ensure that the timing and phasing of sites is robust and based on up to date information”. Given that this has not taken place, we would raise fundamental concerns that the consultation of the trajectory has not adequately taken place as per the relevant guidance. Afterall, the guidance stresses that a Group should be formed as a necessity. Accordingly, there has not been an adequate process and opportunity to review and comment on the information published, including in respect to the other sites have been introduced at this late stage.
Timing Assumptions underpinning the Trajectory
The assumed and factored in timescales of the various stages of bringing forward sites i.e. the pre-application stage, the planning application process, and the discharge of condition process outlined in the trajectory are considered to be fundamentally inaccurate, and result in a distorted position of the delivery of housing sites over the RLDP Plan period. The assumptions are far too ambitious, and without evidence / are not comparable with the timescales being incurred in processing such stages at the Development Management stage(s).
Specifically, we raise objection to the following timescales which are considered to be extremely ambitious and unrealistic:
• “Time period of pre-application discussions/PAC consultation” = 4 months
• “Time between submission of planning application and determination” = 6 months
• “Time taken from planning consent to the discharge of relevant conditions to enable site construction” = 4 months
In our experience, having submitted a significant number of major and other applications for housing and other forms of development in the last 1-2 years to the Council (and elsewhere in Wales and England), it is extremely unlikely that major applications can be submitted, and planning permissions granted, within the timeframes assumed by the trajectory. A wide range of stakeholders are also involved in the determination of major planning applications, which often adds to the delays associated with the determination of such applications. We would therefore consider that a time period of “6 months” given to all major applications in the housing trajectory is not feasible, and distorts the trajectory timescales for the remaining Plan period.
The assumptions in the trajectory are also solely based on expected timescales for the processing of formal submissions made to the Council, and do not factor in the timescales associated with, and needed for, the preparation of the material for submission (i.e. pre-application enquiry submissions / planning application / discharge of condition details etc). When factored in these will elongate the timescales for bringing forward schemes considerably.
Moreover, it is common practice for larger housing sites and major applications to have a range of pre-commencement conditions attached to a permission once granted. Again, we would raise concerns with the timescales indicated in the trajectory related to this part of the planning process. It is highly unusual and questionable that any technical work required by these conditions (usually relating to drainage and highways matters) would be instructed, completed and submitted within 2 months, and for these to then be signed off / approved in a further 2 months. There are also other technical matters and necessary approvals falling outside of, and over and above, the planning system, such as SAB, s.106, s.38 and s.278 agreements, timescales for which have not been accounted for – and all of which are rarely completed within “4 months” as indicated.
It is therefore highly doubtful that the timescales legislated for in the trajectory for the various stages pre-construction are achievable – with no information about these proposed timescales outlined within the supporting text of the Housing Trajectory. We would therefore raise considerable concerns and objections to these as they stand without full evidence to fully show how these have been calculated, and without there being considerable (and necessary) adjustment to the timescales indicated and factored in.
We would therefore object to the timescales indicated in the ‘Timing and Phasing of Sites’ table, given that the delivery start dates will be pushed back further into the Plan period. Accordingly, and as a result, the Plan is at risk of not delivering the level of housing expected based on the sites allocated, at least as swiftly as is set out in the trajectory.
Housing Delivery Rate Assumptions
We would also raise considerable doubt over the proposed delivery of the sites identified in the Housing Trajectory - which we do not consider are robust or reasonable.
The development trajectory bar chart set out in the consultation material (extracted below) anticipates and legislates for a number of critical events and circumstances – all of which are considered to be unrobust and unsound.
Extract of Housing Trajectory Graph (annotated by GJP – red dotted line)
Firstly, a large ‘spike’ (material increase) in housing delivery is factored in to take place in 2027 – 2028. This is a marked and pronounced step change in the rate of delivery, and envisages / relies on a significantly higher rate of delivery than previous years in The Vale of Glamorgan (2021 through 2025 - as depicted by the green columns). This is considered extremely unlikely to materialise, not least given prevailing market circumstances, past rates of delivery on the ground, and also in light of levels achieved across Wales and the UK in general.
The published trajectory shows that the average level of completions in The Vale of Glamorgan from 2021 - 2025 has been approx. 400 - 500 units. However, the chart shows that from 2027 – 2028, completions are expected to rise to approx. 1,000 units per year. The expected delivery levels in the trajectory therefore show and assume a doubling in delivery rates and unit numbers (an increase of approx. 100%relative to past rates). There is no clear evidence as to how this level of completions can be achieved let alone guaranteed. This is the case in particular given that the forthcoming years (2025-2027) are expected to see performance (yield) drop significantly (delivery rates in 2025 – 2026 and 2026 – 2027). The chart shows only approx. 200 units being delivered over these years. It is therefore unclear how completion rates are expected to rise so quickly (from 200 in 2025-26 to 1000 in 2027-28), and by such a significant amount. The assumptions in the trajectory are wholly unrobust in our view.
The anticipated delivery of housing also fails to be consistent within and across the Plan period. It is unclear as to why completions rates aren’t spread out more evenly throughout the Plan period - to ensure a robust and most realistic housing trajectory until 2036. By comparison to the marked increase in the rate of delivery between and over the
period 2027 to 2031, there is then a marked fall-off or drop in delivery towards and by the end of the Plan period. Indeed, in the final year, the level of completions are expected to be lower than the period 2021-2015.
To summarise, we consider the defined position to be wholly manufactured and unreflective of the past completion rates, as well as the recently published completion rates provided by Welsh Government recently in August 2025. In the Welsh Government Statistics Document ‘’New House Building: April 2024 to March 2025’, information on the number of new dwellings started is provided, where building has commenced and those completed for April 2024 to March 2025. Figure 1 provides a graph showing starts in the last 10 years, and it is clear that there has been a general decline in the number of new dwellings started and completed.
Description of Figure 1:.‘New House Building: April 2024 to March 2025’
In 2024-25, 4,631 new dwellings were completed, 3% fewer than in the previous year. This was the second lowest number on record, with the lowest number recorded in 2021-22, a year heavily affected by the coronavirus (COVID-19) pandemic (in 2021-22, 4,616 new dwellings were completed). The New Housing Pipeline Report Quarter 2, 2025 Report (September, 2025) published by the HBF evidenced that the number of residential units approved in the UK fell by 6% during the second quarter of 2025, continuing the decline of approval during the first three months of the year. Wales saw one of the largest declines in the UK in approvals with a decline of 29%.
Further, the HBF document ‘Increasing Housing Supply in Wales’ (4th September 2025) clearly shows that The Vale of Glamorgan has not met the housing delivery requirements in recent years in 2023 – 2024 – along with every other authority in Wales (except Newport). Accordingly, this further adds to the argument that historically The Vale (and most other authorities) have underprovided. This adds considerable uncertainty on the assumed transformation in yield and delivery as built into the trajectory.
Graph: Housing Delivery as a proportion of annual housing requirement in Wales per Authority
The Home Building Sector Skills Plan (Aug 2025) published by the HBF also identified the following issues with the workforce to bring forward built development in Wales:
• “A shortfall in numbers entering roles from the education system;
• An ageing workforce: 25% of the home building workforce is aged over 50, meaning the sector is facing an impending retirement cliff edge;
• Challenges attracting a wider talent pipeline into the sector;
• A lack of understanding of critical future skills needed, and direction from the Future Homes Standard; and
• Output within the sector fluctuating with demand and economic pressures, leading to additional pressures in recruitment and training”.
It is not considered that in the next 1-2 years that any of these issues can or will be substantially corrected – at least sufficiently so to allow for, and enable, the planned delivery rates of new housing completions to be as high as < > 1,000 homes in one year (and for four consecutive years at that).
We would therefore object to the proposed numbers of completion expected during the Plan period, given that there are a number of issues with delivering housing in Wales and given past completions rates for The Vale of Glamorgan. Again, this results in the Plan being at risk of not delivering the level of housing expected based on the sites allocated.
Status & Standing of Sites included in the Trajectory
The proposed land supply within the housing trajectory includes provision for ‘rolled forward’ LDP sites, which contribute to the total of ‘Proposed Additional Housing Allocations’ forming part of the housing supply. Specifically, a total of 1,242no. units have been identified as additional housing allocations, of which 959no. are expected to be delivered on the rolled forward LDP sites. As such, these sites are to provide for a significant proportion of additional housing in the Plan period (specifically circa 77%).
The Development Plans Manual (DPM) sets out that allocations rolled forward from a previous plan will require careful justification for inclusion in a revised plan. The DPM outlines that “there will need to be a substantial change in circumstances to demonstrate sites can be delivered and justify being included again. Clear evidence will be required that such sites can be delivered.” The below table included in the consultation document provides a breakdown of the rolled forward LDP sites, and in particular, sets out the status of each site:
The above table evidences that the current LDP has under delivered in regard to its targeted unit number of the Plan period, given that these sites did not yield any housing over the current plan period. This is further exacerbated by the Land Bank sites that have also not delivered any housing across the existing LDP period, amounting to 1,860no units. Accordingly, when considering the non-delivery of both rolled forward LDP sites and Land Bank sites, this amounts to an approximate shortfall of 2,189 homes being delivered, or 33% of the total housing supply identified for the current LDP (8,525no. dwellings).
It is therefore considered that, as a minimum, the units carried over from the LDP (without planning permission) should be a surplus to the housing supply proposed for the RLDP, as opposed to being relied on to deliver the housing need over the Plan period. This is particularly the case for the two sites (Land to the west of Pencoedtre Lane, and Land between Northern Access Road and Eglwys Brewis Road) which do not currently have any active planning application submitted for their development. These sites total an amount of 370no. units to be delivered in the Plan period, which represents more than a third of the additional housing allocations to make up the housing supply.
As such, it is considered that the unmet need deriving from the existing LDP is still present – indeed it has grown, and will continue to do so, not least when considered in conjunction with the projected population growth over the coming years to 2036, and the aspirations for growth in the Plan’s strategy.
Accordingly, in order to secure the targeted level of housing, a greater level of provision for new allocations should be applied in order to meet the housing requirement. This would bring about better certainty that the housing requirement is met by the housing supply over the Plan period, not least given that the current Plan failed in this respect. Without a re-apportioning of the housing supply, it is considered that the Plan would heavily rely on the contingency (i.e. rolled forward LDP sites) coming forward in the Plan period, yet there is uncertainty that these will yield in full over the new Plan period. This raises issues of ‘’soundness’’, and risks rendering the Plan unrobust.
On this basis, we would object to the Plan if the provision of housing is not adjusted to rebalance the provision to include new allocations in lieu of rolled forward LDP sites in the housing supply.
Key Sites
As set out in previous representations at Preferred Strategy stage, it is considered that the housing supply relies heavily on the delivery of the ‘key sites’ to deliver housing (and meet need) over the Plan period. The total number of housing units attributed to key sites amounts to 2,278, which equates to over 25% of the total provision in the Plan period.
As detailed above, we consider there to be concerns regarding the proposed ‘Timing and Phasing of Sites’ table included in the Housing Trajectory which we consider are not reflective or accurate and will therefore have the effect of delivery start dates being much later into the Plan period than anticipated. The result of this will be that the Plan will be at risk of not delivery the level of housing expected and needed. Moreover, the Housing Trajectory Graph presents an overly ambitious level of housing completions over the Plan period - which the Council consider will be markedly higher than the average levels experienced in the last five years. Again, for the reasons set out above, we consider that these rates of expected completions to have no evidence supporting them, and to be unachievable and unsound.
Insofar as to the removal of the previously proposed site ‘Land at North East Barry’, this site was expected to deliver 900no. units in the Plan period. Following its omission from the housing supply, other sites have been identified, which comprises the inclusion of a new key site (Land at North West Barry), 3no. non-strategic sites, and also affordable housing-led allocations. In terms of the quantum of development attributed to these new sites, this amounts to 659no. dwellings. This is some 250 units less than the 900no. homes that was previously attributed to ‘Land at North East Barry’. Whilst it is appreciated that the number of homes forming part of the existing supply (completions, units with planning permission etc.) have increased since Preferred Strategy stage, there will be a net loss in market housing provision and delivery.
This position is made worse and compounded as a result of accounting for the affordable-led sites in making up the housing supply.
As set out within the Preferred Strategy, these sites are expected to deliver at least 51% affordable housing. These units are not open market units, and will not / cannot contribute to the supply of such housing. These units will contribute to the provision of affordable housing, and will go some way to meeting the acute need for such housing (albeit will not eradicate / address in full the well known and accepted considerable requirement). Accordingly it is considered that these sites should be in addition to the housing supply, as opposed to forming part of the provision. In turn, there would need to be an increase in allocations for non-strategic sites, to ensure that there is sufficient market housing delivery over the Plan period.
Were such changes to be made and introduced, this would achieve and assist realise a more robust and sound housing supply, which will ensure that the identified housing need is met / addressed over the Plan period. Without these changes it is considered that the housing supply is not sufficient, and inevitably, housing need will not be met within the Plan.
St Athan Train Station
As set out in the Preferred Strategy (para A3.29), the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. Accordingly, in line with the spatial strategy adopted for the RLDP (i.e. focus development around sustainable transport nodes), St Athan was identified as a ‘Strategic Opportunity Area’ to accommodate strategic growth – through the proposed allocation of two key sites : ‘Land at Church Farm’ and ‘Land West of St Athan’. These sites have been identified to deliver 532no. and 600no. units respectively in the Plan period. These are separate to, and are in addition to, the 51no. units that have now been attributed to the site ‘Land South of Clive Road’ in St Athan. Accordingly, in total, the Housing Trajectory makes a provision for a total of 1,183no. homes to be delivered in St Athan over the Plan period.
It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales. The focus in the first phase of such improvements across the region is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly,
it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes, and given that St Athan will be without any railway station in the Plan period, it is not considered that these sites align with the strategy of the RLDP. Accordingly, the wider Housing Trajectory is considered to be unsound, given that a total of 1,183no. homes are expected to be delivered in St Athan within the Plan period.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing in this location over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.
We therefore consider the Trajectory to be both unrobust and unsound, and therefore, we object to the Trajectory in its current form accordingly.
Geographic distribution of the ‘new’ sites / provision
As a general and overarching comment in respect to the additional sites now included within the Plan, and forming part of the trajectory, (and a matter expanded upon when critiquing each of these sites in the next section to this submission), it is clear and evident that these additional sites have been positioned to settlements that have already, and recently, been attributed significant growth in the preceding Plan and plan period.
Significant allocations (which have also contributed to significant levels of affordable housing) have been realised and built out in locations (such as Wick and Colwinston). Notwithstanding this, two of the additional sites are now proposed for these recently expanded settlements. Given that the purpose of the affordable housing led allocations is to meet unmet affordable housing need, it is questioned why such new allocations are attributed to settlements that have already seen open market and affordable housing provision, as compared to other comparable settlements that have not received any growth whatsoever over a considerable period of time.
It is considered accordingly that the geographic positioning of these allocations is at odds with their underlying purpose - to meet unmet affordable housing need in communities that have seen no provision
Detailed Comments in respect to ‘new’ sites
Other Housing Allocations
Land south of Clive Road, St Athan
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
As set out at the outset of these representations, and whilst we note the findings of the Candidate Sites Assessment at Preferred Strategy Stage (i.e. Suitable for further consideration), we do not consider that the consultation on this site has been undertaken procedurally appropriately or suitably. We therefore consider the consultation on this site is “unrobust” and “unsound”.
As set out previously, the strategy seeks to focus development around key sustainable transport nodes. The strategy outlined that a feasibility study for a station in St Athan had been undertaken, which identifies that a new station could be located in St Athan, subject to further investigation work. It is now the case that, subsequent to the publication of the Preferred Strategy, the proposed railway station at St Athan is not in the first phase of delivery for new stations in South Wales, where the focus is towards improving connectivity in east Cardiff, Newport, and Magor. Accordingly, it is very unlikely that any new train station will be delivered in St Athan over the Plan period, which significantly questions the suitability and acceptability of the proposed allocations set out above.
It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add a further site for housing over and above the original provision is considered to be unsound. As set out above, the justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites – given their incompatibility with the core strategy of the RLDP.
Affordable Housing Led Allocations Land at Heol Fain, Wick
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below for ease:
Candidate Site Stage 2 Assessment (Site Ref. 404)
The findings of the Candidate Site Assessment for this site are noted. We are assuming the reason this site is proposed to be allocated is a product of the site promoters/developers heading the findings stated below, and changing the form of development to be in accord with this:
“A market housing led scheme would not be acceptable, but the site could be reconsidered as a small scale affordable housing led development subject to need and viability at a maximum of 50 dwellings. In accordance with the Settlement Appraisal Review, it is considered that Wick could potentially accommodate limited affordable housing led growth.”
Whilst no clear deficiency exists in respect to the site, it is known that Wick has been subject to significant growth and expansion in recent years – not least by virtue of significant housing allocations in the settlement as part of previous plans.
To evidence this, 35% of the 124 units approved on the ‘Rectory Field, St Brides Road’ site (i.e. circa 43 units as per site allocation ref. MG(47) and PP ref. 2014/01424/FUL) were approved as Affordable Housing units. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Wick, further provision ought to be made in comparable (previously unprovided for) locations, such as Ogmore By Sea.
Land West of Maendy Road, Aberthin
‘Land West of Maendy Road’ has been registered as an Affordable Housing Led Allocation candidate site for the RLDP, however as far as we know from our review, there is no assessment and critique of this site. This site has not been included in the ‘Candidate Assessment at Preferred Strategy Stage’ (October 2023). As such, with an absence of publicly available information, it is not clear how the Council has judged this site against the criteria. This raises questions accordingly in respect to the “soundness” of a site which forms part of the intended housing land supply, and by association the trajectory. Without this, and without being consulted on (as others have been prior to this) we question whether this allocation is “sound” (i.e. its allocation is considered to be “unsound”).
Land North of West Winds Business Park, Fferm Goch
The below sets out the candidate site stage two assessment of ‘Land to north and west of Westwinds Business Park’:
Candidate Site Stage 2 Assessment (Site Ref. 398)
As can be seen above, the site was not considered suitable for further consideration, with the site scoring negatively (red) in respect to a number of key factors. These include the following:
• Access to Retail;
• Access to Health Services;
• Sustainable Transport- Public Transport;
• Access/ Proximity to services and facilities conclusion;
• Climate Change; and
• Health and Wellbeing.
Given the fact the site scores red in ‘Sustainable Transport – Public Transport’, this shows the site is not served by public transport connections within 800m, as outlined in the key below:
Additionally, Policy SP7 (Sustainable Transport) of the Vale of Glamorgan Preferred Strategy states “New development must support an enhanced transport network that increases the proportion of journeys being undertaken by sustainable travel modes”. Additionally Objective 8 (Promoting Active and Sustainable Travel Choices) states “new development is directed to locations that are or can be accessible by a choice of modes of transport, including walking, cycling, and public transport.”
It is well known that residents of affordable housing are statistically less likely to own private vehicles, making access to reliable and frequent public transport essential for ensuring equitable mobility. The provision of public transport infrastructure in close proximity to such developments is therefore a critical component in supporting access to employment, education, healthcare, and other key services, while also promoting sustainable travel patterns and social inclusion.
The site also scores red in respect to Access/Proximity to services, showing the site is greater than 1200m away from key services, as seen in the key below:
In respect of the above, Preferred Strategy 6.40 states the need “To ensure that new development takes place in locations that have the best access to a wide range of services, facilities, and employment opportunities, whilst minimising the need to travel, the distribution of growth is guided by the following settlement hierarchy”. To further highlight the importance of both sustainable transport and proximity to services, the preferred strategy also states the need to “Facilitate the development of adaptable, accessible, well-connected communities that have a strong sense of identity, offer a sustainable range of services and facilities and are equipped with adequate infrastructure”. In addition, Promoting Active and Sustainable Travel Choices outlines to “Promote and encourage the use of sustainable methods of travel, particularly active modes of transport, whilst simultaneously reducing the need to travel”.
In light of the above, this site does not align with the aims and targets set out in the Preferred Strategy, as it fails to meet several key development goals set out. It should therefore not be considered suitable to be allocated for future developments. Its inclusion is therefore unsound.
Should this view be concurred with, 22 affordable units will be lost from the proposed affordable 122 units, and ultimately will be lost from the overall housing land supply. As stated in the draft housing trajectory “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help sustain services and facilities within these rural communities”. There is a clear possibility therefore that this proposed allocation is removed and/or not delivered as its inclusion is unsound as it does not align with the aims and targets set out in the Preferred Strategy - as it fails to meet several key development goals set out. A “small scale
affordable housing led development” which is needed to “respond to local affordable needs and help sustain services and facilities within these rural communities” will therefore not be provided for. This is clearly an issue.
When comparing this with ‘Land at Hazelwood, Ogmore By Sea, the following is set out:
Access to Services and Facilities
This criterion has been assessed firstly on the location of the site proposal in terms of whether it is located within, adjacent to, or outside a settlement, and secondly the ease of pedestrian and cycle access to key services listed below.
With reference to the above:
• In terms of public transport, there are two bus stops located approximately 200m (3-minute walk) from the site (‘Ogmore By Sea Post Office’), with the ‘303’ providing services between Llantwit Major and Bridgend.
• The site is located 200m (3-minute walk) from the ‘Ogmore By Sea Post Office’ which can provide basic goods to meet day-today needs such as bread, butter, milk etc.
• The site is also located 50m (1-minute walk) from a children’s park.
These services and facilities are therefore well within the best category (i.e. categorised/scored as ‘green’) - within 800m of site (10-minute walk). Accordingly, the site therefore has good access to services and facilities. This
Furthermore, the settlement of Ogmore By Sea has been ranked higher than Llangan (which the site ‘Land to north and west of Westwinds Business Park’ is located within) in the VoG Sustainable Settlements Appraisal, and therefore, is considered to constitute a more sustainable location to accommodate residential growth. Most notably, Ogmore By Sea scores ‘13’ in respect to ‘Daily Facilities’ whereas Llangan only scores ‘3’, evidencing that residents in Ogmore have much better access to services within the locality as compared to Llangan.
Given the above, ‘Land at Hazelwood, Ogmore’ does/should align with the aims and targets set out in the Preferred Strategy as it meets several of the key development goals set out. Its inclusion should therefore, in our view, be considered “sound” and therefore suitable to be allocated for future developments. The site should properly and appropriately be allocated in lieu of ‘Land to north and west of Westwinds Business Park’ – the inclusion of which is “unsound”. ‘Land at Hazelwood, Ogmore’ would therefore ensure that affordable units, where “there is a need for small scale affordable housing led development (minimum 50% affordable) to respond to local affordable needs and help
sustain services and facilities within these rural communities”, are provided for. As such the proposed housing trajectory would be maintained.
Land to the East of Colwinston, Colwinston
A summary of the Candidate Sites Assessment at Preferred Strategy Stage has been extracted below:
As outlined above, the site was rejected and considered not suitable for further consideration. In fact, and unlike ‘Land at Heol Fain, Wick’ and ‘Land to north and west of Westwinds Business Park’ it was stated that this site “could not be considered as a suitable affordable housing led development site”. Despite this, this site is identified to be allocated as an Affordable Housing Led Allocation. As such, the inclusion of this site is “unsound”.
It is known that Colwinston has been subject to significant housing allocations in the settlement as part of previous plans. To evidence this, 25% of the 64 units (i.e. 16 units) were approved on the site allocation ref. MG2(41) and PP ref.
2014/00242/FUL. This makes a substantial provision of such Affordable Housing units (and housing generally) in the settlement in recent years.
Other similarly sized and comparable settlements and locations have not by contrast been subject to any growth for some considerable time, and accordingly would warrant and benefit from provision as part of this new replacement plan.
Notwithstanding the location of such provision, and as set out in detail at the outset of these representations, National Planning Policy advocates the high and acute need for affordable housing, whilst recent analysis evidences that there is a housing emergency. These circumstances - coupled with the shortcomings identified and set out earlier in these submissions in respect to the adequacy of provision within the plan (rolled forward sites / inadequate provision etc) – means that notwithstanding any potential allocation at Colwinston, further provision ought to be made in comparable (previously unprovided for) locations, such as Ogmore By Sea.
Summary of These Representations
To re-iterate, and to summarise the case made and set out, these representations seek to object to the Housing Trajectory published as part of the consultation on the Draft Housing Trajectory For Housing Stakeholder Group (October 2025) which underpins the Plan and the delivery / realisation of its underlying strategy.
Detailed submissions and objections are raised above in respect to the trajectory information published regarding the soundness and robustness of this information (and it’s consultation), which we do not consider are adequate, robust, or sound to deliver the Plans aims and objectives.