Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7004

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - 4” & 9” diameter watermains crossing the site.
Sewerage - 375mm diameter foul sewer, and a 100mm diameter pressurised rising main sewer crossing the site.
Wastewater Treatment Works (WwTW) - The site is in Cog Moors WwTW catchment.

Atodiadau: