1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6987

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - Dwr Cymru Welsh Water has made representations on planning application ref 2022/00733/FUL. A hydraulic modelling assessment (HMA) will be required. A 3” diameter abandoned watermain crosses the site.
Wastewater - Dwr Cymru Welsh Water has made representations on planning application ref 2022/00733/FUL. A hydraulic modelling assessment (HMA) will be required. A 300mm pressurised rising main sewer crosses the site. The site is near to a Sewage Pumping Station (SPS) and we would recommend that the LPA discuss the potential allocation with their Environmental Health Department. To avoid the potential for noise or odour nuisance for future occupiers it is strongly recommended that any properties are positioned a minimum of 15 metres away from the asset.
Wastewater Treatment Works - Dwr Cymru Welsh Water has made representations on planning application ref 2022/00733/FUL. Cog Moors WwTW has capacity to accept foul flows from the proposed development.

Atodiadau: