Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Our representations on the proposed allocated sites are included in appendix 1. Where planning applications have already been submitted and are pending a decision, we have made representations during the planning application consultation process regarding the capability of our infrastructure to accommodate the proposed development. If capacity does not exist within our infrastructure to accommodate the demands arising from a development site, the planning authority can make planning permission conditional upon there being adequate infrastructure available to cater for the development. A developer has a right to connect to our sewerage networks provided that a development site benefits from planning permission and there are no overriding planning conditions attached to the permission that controls the location or timing of that physical connection.