Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6921

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Boyer Planning

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Barratt Redrow strongly object to Policy CC1 on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework. risks imposing additional cost and complexity that undermines site viability and deliverability.

The Development Plans Manual for Wales is clear that development plans must avoid repeating national policy and should not introduce requirements that are more appropriately addressed through other regulatory regimes. In this respect, Policy CC1 conflicts with the principle that plans should be clear, proportionate and not duplicate national controls, raising concerns under the tests of soundness relating to coherence and consistency with national policy (Test 2) and whether the plan is justified (Test 3).

The proposed step change in standards from 1 April 2030 — particularly the reduction in space
heating demand from 40 kWh/m²/year to 15 kWh/m²/year — represents a significant and abrupt
escalation in performance expectations. Whilst reference is made to initiatives such as Tai ar
y Cyd and AECB CarbonLite, these have largely been associated with grant-funded affordable
housing schemes. There is no clear evidence that equivalent standards can be viably delivered
across mainstream private housing schemes without public subsidy.

Policy CC1 also risks creating fragmented energy performance standards across different Local Planning Authorities in Wales. This undermines the benefit of a consistent national approach through Building Regulations and makes it more difficult for volume housebuilders operating across multiple authority areas to deliver homes efficiently at scale.

Furthermore, the demands of Policy CC1 have to be considered in the context of all of the other demands that impact on development viability (e.g. affordable housing). The Council must provide evidence that an assessment has been undertaken to demonstrate that development, specifically the housing allocations in Policy HG1, can bear the cumulative policy costs of the RLDP, including Policy CC1.

Atodiadau: