Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6809

Derbyniwyd: 11/03/2026

Respondent ID: 689

Ymatebydd: Mineral Products Association

Crynodeb o'r Gynrychiolaeth:

We have significant concerns that the evidence base for the local plan has not been updated. Whilst RTS2 is undoubtedly material, the statement that “There is an existing landbank of 18.73 million tonnes of crushed rock” is not correct. As stated in the text, this is the landbank as of 31st December 2016. The Council must update its evidence base and provide a landbank figure which reflects the current permitted reserves.

Since the publication of the RTS2, there have been numerous publications to assist in updating the evidence base including the SWRAWP reports and AM2023.

In our responses to earlier iterations and consultations on the RLDP we highlighted the need for the Council to update the reserve figures. We also highlighted that planning submissions had indicated that circa 16.5mt of permitted reserve is suitable for non-aggregate use.
It is not clear if this tonnage is included in the 18.73mt referred too.

Greater clarity and analysis is required.

Atodiadau: