Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6702

Derbyniwyd: 11/03/2026

Respondent ID: 690

Ymatebydd: Ministry of Defence

Crynodeb o'r Gynrychiolaeth:

The MOD needs to be consulted on all proposals to develop wind turbines that are 11m or greater in height to blade tip or, that have a rotor diameter of 2m or greater. This is necessary to safeguard defence radar coverage across the UK used to manage MOD ranges, provide air traffic control and maintain UK air defence.

The MOD notes that Draft Policy CC3 assigns the renewable energy local search areas that have been defined in the deposit plan. This supports the generation of non-domestic renewable, low and zero carbon energy. The Renewable Energy assessment from 2023 identifies potential opportunity areas for renewable energy and provides a high-level assessment of wind and solar energy resource within the Vale of Glamorgan and identifies several sites, known as ‘search areas’ where the potential for development is greatest, and identification of 20 of the largest sites for both wind and solar.

In principle, the MOD has no objection to any renewable energy development occurring in the renewable energy local search areas that have been defined, subject to confirming that that it will be compatible with defence safeguarding requirements.

Atodiadau: