Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6660

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

HG1 (2) Land at the Mole
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary European
Marine Site (EMS). A HRA at project level will therefore be required.

Atodiadau: