Crynodeb o'r Gynrychiolaeth:

We welcome the inclusion of SP20 which recognises the importance of natural assets and aims to protect these. We also note that whilst reference is made to sites and areas of European, national and local importance (para. 6.402), this is not distinctly carried through within SP20 or within a specific detailed policy in the deposit plan. We advise that a more detailed policy for the Natural Environment (similar to DNP4 for the Historic Environment) could be included within the deposit plan and this should include reference to the protection of statutorily designated sites. Alternatively, SP20 itself could be updated to include reference to these in a similar manner to the approach taken to non-statutory designated sites provided by criterion 5 of SP20. We consider this would strengthen the deposit plan’s alignment to section 6.4.3 of PPW12.

By adding a detailed policy for the wider protection of the natural environment, there is scope to ensure a clearer message within the deposit plan regarding the need for natural resources (including land, air, water and soils) in the Vale to be protected for themselves and the essential ecosystem services they deliver. This is opposed to merely preventing pollution (deposit plan Policy DNP5). Taking such an approach would enable an opportunity to add the consideration of Sustainable Management of Natural Resources (SMNR) into the plan policy framework rather than confining this to the deposit plan context (para 2.11) and the policy context of the GIS (page 53).

We note that Policy CC4: Renewable, Low and Zero Carbon Energy Generation is more distinct in seeking to safeguard a range of assets (including nature conservation interests and soil conservation interests) and we consider a similar policy approach may be useful for all development proposals.

Ensuring an SMNR approach will impact positively on the ground to safeguard and improve ecological networks and protect and enhance ecosystems, essential to meeting the nature emergency.

Topics we draw your attention to include river restoration where, in particular, the removal/remediation of physical modifications can make a significant impact upon water quality. The GIS provides scope to capture various projects and wider initiatives, including those based on catchment scale improvements and we welcome the opportunity to be continually involved in this work.

We note and welcome the recognition of nature-based solutions within Policies SP16, SP19 and SP20 and in detailed Policy CC6.

With regards to natural assets and water resources, we consider that specific reference to water quality is lacking within the strategic and/or detailed policies. Whilst we note that water quality is mentioned within criterion 9 of Policy SP16, we consider the deposit plan should include more direct reference to the Water Framework Directive.

We consider there is an opportunity for SP20 to be updated to ensure developments protect water quality and quantity. Alternatively, as mentioned above, this could fit within a detailed policy for the protection of the natural environment. Please note also that, referring to paragraph 6.404 and 6.405, the requirements for developments to demonstrate NBB is based on PPW12, rather than The Environment (Wales) Act 2016.

We welcome the illustrative master plans included in the deposit plan but would caveat that at the detailed stages schemes must be able to adapt, where necessary, to sites specific environmental constraints (including protected sites, species and habitats), for example in response to updated ecological appraisals or detailed species surveys. Designs need to be flexible enough to ensure compliance with the stepwise approach (avoid, minimise, mitigate) in achieving Net Biodiversity Benefit (NBB) and improving the resilience of ecosystems as required by Planning Policy Wales, edition 12 (PPW12) and Policy 9 of Future Wales, the National Plan. We note the plan has good reference to this within Policy SP20 and supporting paragraph 6.405, thus enabling thorough consideration at the project/planning application level and in master planning.