Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6401

Derbyniwyd: 10/03/2026

Respondent ID: 3571

Ymatebydd: Mrs Barbara Gay

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The allocation is unsound for several independent reasons.
First, the proposal conflicts with the Plan’s spatial strategy.
Aberthin is identified as a Minor Rural Settlement, where development is expected to be limited in scale and primarily related to local needs. A development of approximately 25 dwellings would represent around a 14% expansion of the settlement in a single phase, introducing estate-scale growth into a small rural village with very limited services. This represents a material step-change inconsistent with the role of such settlements within the hierarchy.
Second, the site is not necessary for delivery of the Plan’s housing strategy. The RLDP identifies a housing requirement of 7,890 dwellings and housing provision of 8,660 dwellings, creating a surplus of 770 dwellings above the requirement. Removal of HG4(2) Aberthin would still leave a surplus of 745 dwellings, and even removal of all HG4 rural affordable-led sites would leave a surplus of 648 dwellings. The allocation is therefore not required for the Plan to deliver its housing requirement.
Third, the RLDP evidence identifies affordable housing need at a ward level (Cowbridge) rather than within Aberthin itself, and no evidence has been presented demonstrating a specific locally arising need within the settlement.
Forth, the site makes only a negligible contribution to affordable housing delivery. The site is expected to deliver approximately 13 affordable homes, representing only 0.42% of the Plan’s projected affordable housing delivery of 3,070 homes. The Plan is therefore not materially dependent on the site to deliver its affordable housing strategy.
Fifth, the site is heavily constrained by flood risk and drainage uncertainty. Part of the site lies within Flood Zone 3, where highly vulnerable development on greenfield land is not permitted under Technical Advice Note 15 (TAN15) unless the development is essential to the Local Development Plan. Given the Plan’s housing surplus, and no identified local need, the site cannot reasonably be considered essential. In addition:
• no detailed hydraulic model exists for the Nant Aberthin watercourse,
• no Flood Consequence Assessment has been undertaken at allocation stage,
• groundwater susceptibility is classified as “Red – high –groundwater likely to be at or near the surface”, with a recommendation for 12 months monitoring which has not been undertaken,
• surface water mapping indicates intermediate flood risk across part of the site, and historical flood data indicates flooding
• the proposed SuDS detention basin location appears to fall within Flood Zone 3 according to Council constraint mapping, raising questions regarding compliance with SuDS design guidance,
• the viability and performance of the proposed drainage strategy has not been demonstrated, including potential effects on the hydrology of the nearby Cors Aberthin SSSI wetland system, and
• no modelling has been provided to demonstrate that development would not worsen flood risk to neighbouring properties, including those at Maes Lloi.
Taken together, these factors create substantial uncertainty regarding whether a compliant drainage strategy could be delivered and whether flood risk could be safely managed.
Sixth, the site presents infrastructure and accessibility constraints. Aberthin has very limited services and infrastructure. The settlement contains no shops and limited community facilities, with most services located in nearby Cowbridge. Public transport provision is limited to infrequent bus services which cease in the early evening and do not operate on Sundays, and there are no designated active travel routes connecting the settlement to surrounding towns. The road network through the village, particularly along the A4222 corridor, already experiences traffic pressures and safety concerns. The Council’s education evidence also confirms that secondary school capacity serving the area is already under pressure, with additional places required to accommodate projected growth.
Seventh, the allocation introduces development into a sensitive landscape and environmental setting. The site lies entirely within a Special Landscape Area, contributes to the countryside setting of the Aberthin Conservation Area, lies close to Cors Aberthin SSSI, and contains established hedgerow boundaries forming part of the historic field pattern of the Vale landscape.
Finally, the allocation represents a clear departure from the Council’s published site assessment methodology. Background Paper BP16 indicates that sites affected by flood risk should normally be discounted from further consideration. Despite multiple constraints — including Flood Zone 3, groundwater susceptibility and surface water risk — Site 2299 was not discounted. The site was previously rejected during preparation of the adopted LDP on the basis that it was unrelated to the settlement and constituted sporadic development in the countryside, and no material change in circumstances has been demonstrated to justify a different conclusion. Additionally, audit trail concerns are evident, e.g. N/A values in justification columns.
In conclusion, these matters demonstrate that the allocation fails the key tests of soundness: it is not justified by the evidence, is not effective or deliverable due to unresolved environmental and infrastructure constraints, and is not consistent with national policy, including Planning Policy Wales (sustainable spatial strategy and protection of landscape) and Technical Advice Note 15 (flood risk).
For these reasons, Site HG4(2) – Land West of Maendy Road, Aberthin should be removed from the RLDP.