Cefnogi
4 Safleoedd Ymgeisydd
ID sylw: 6065
Derbyniwyd: 11/03/2026
Respondent ID: 2669
Ymatebydd: Barratt Redrow Homes
Asiant : Lichfields
N/A
Cowbridge's inclusion as a Service Centre Settlement within the Strategic Growth Area Settlement Hierarchy is endorsed, recognising its access to services and excellent transport links. The under-allocation of housing land for Cowbridge, with only 105 units planned and no major lank bank sites is insufficient given that Cowbridge is a Tier 2 settlement in the hierarchy. To meet housing needs and the RLDP’s growth strategy more land at Cowbridge needs to be allocated for housing including land at Primrose Hill, for up to 220 dwellings.
We therefore request that Land at Primrose Hill (Candidate Site ID: 455) is allocated for housing development. The site is located in one of the most sustainable settlements in the settlement hierarchy, Cowbridge, which is also at the top of the retail, commercial and service centre hierarchy in Policy SP11. Cowbridge has a serious lack of allocated land for housing development and major land bank sites in the RLDP as drafted.
In order for Cowbridge to match its status in the hierarchies of Policy SP2 and SP11, the RLDP needs to include Land at Primrose Hill for allocation would deliver up to 220 homes during the RLDP period. Land at Primrose Hill is within easy reach of the town centre and in close proximity to excellent commercial, educational, community and recreational facilities and services. The site is well positioned to be accessed via the local highway network, which links to both Cardiff, Penarth and Bridgend via regular bus services from bus stops adjacent to the site.
The inclusion of Cowbridge as Service Centre Settlement within the Strategic Growth Area Settlement Hierarchy in Policy SP2 is endorsed. Cowbridge comprises a sustainable self-contained settlement with regards to access to services such as primary and secondary schools, shops including supermarkets, medical services at the GP surgery and pharmacy, sports activities including a leisure centre, a library and places of worship. Cowbridge has excellent connections to the A48 with regular bus services providing access to Cardiff, Porthcawl and Llantwit Major.
The Service Centre Settlements are the middle-tier in Policy SP2 and as well as Cowbridge, include Llantwit Major and Penarth. The Key Settlement of Barry being the top-tier and the Primary Settlements of Rhoose, St Athan, Sully, Llandough (Penarth) and Dinas Powys being categorised as the lower-tier, below Cowbridge.
Policy SP2 states that Service Centre Settlements “are important settlements that offer a range of services and facilities. Serving the needs of their residents, they also act as important hubs for those living in nearby smaller settlements. Future growth will support this role where the level of development will meet the local needs of the area.”
Policy HG1 sets out the housing allocations to meet the identified housing requirement set out in Policy SP6. HG1 allocates sites for a total of 3,398 dwellings across Key Sites and Housing Allocations. Of the 3,398 units:
• Key Settlement (tier 1) = 686 (20.2%)
• Service Centres (tier 2) = 340 (10%)
• Primary Settlements (tier 3) = 2,372 (69.8%)
It is clear that the allocations in Policy HG1 do not reflect the proposed settlement hierarchy with an under representation of allocations in the second tier Service Centre Settlements. There are only two allocations in Service Centre Settlements: HG1(5) at Llantwit Major for 235 units and HG1(6) at Cowbridge for 105 units.
A review by settlement further highlights the under provision of allocations and major land bank sites at Cowbridge compared to other higher order settlements:
Tier 1 Barry – 686
Tier 2 Cowbridge – 105
Llantwit Major – 475
Penarth – 576
Tier 3 Rhoose – 859
St Athan – 1,263
Sully – 175
Llandough – 133
Dinas Powys – 250
It is evident that there are fewer allocations made to Cowbridge than any other higher order settlement and significantly less than many of the tier 3 settlements. A review of the Housing Land Supply document BP9A highlights that there is only planning permission for 203 dwellings in Cowbridge that were not started as of April 2025. The case cannot be made that there is an existing unimplemented land bank to meet the needs of this settlement.
Furthermore, Paragraph 3.5 of the Local Housing Market Assessment (2023) sets out that “The 2021 LHMA indicated that the existing backlog of need is most acute from people on the housing waiting list within Barry, Penarth/Llandough, Llantwit Major, Cowbridge, Dinas Powys, Rhoose, Wenvoe and St Athan although there are a significant number of people on the waiting list across all areas of the Vale.”
Having only one allocation, and no major land bank sites at Cowbridge does not reflect the importance of Cowbridge as a Service Centre Settlement. The failure to make significant new allocations in this Tier 2 settlement undermines the ability of this important settlement to meet its housing needs including affordable needs.
Policy HG1 apportions only 105 dwellings (or only 1.3% of the housing requirement as set out in Policy SP1) to one of only three second tier settlements. Thus, the number of units allocated to Cowbridge does not align with the Settlement Hierarchy presented in Policy SP2. As explained in our representations to Policy SP1 and SP6 above, a more ambitious housing requirement is needed in the VoG.
It is therefore evident that in order for the RLDP to meet the third test of soundness (Will the Plan deliver?), Cowbridge needs additional housing allocations to ensure that housing is delivered at a scale commensurate to the settlement hierarchy in Policy SP2 and to achieve the RLDP Growth Strategy which commits to housing growth that accords with the Vale’s position within the Cardiff Capital Region.
Land at Primrose Hill (with a capacity of up to 220 dwellings) is available, with limited physical and environmental constraints, to assist with the much-needed increased delivery of housing at Cowbridge during this RLDP period.