Land North of Primrose Hill

Yn dangos sylwadau a ffurflenni 1 i 5 o 5

Cefnogi

4 Safleoedd Ymgeisydd

ID sylw: 5929

Derbyniwyd: 08/03/2026

Respondent ID: 2240

Ymatebydd: Lindsey Bulleid

Crynodeb o'r Gynrychiolaeth:

I believe this site is better suited to development as these areas are already partially suburbanised and do not have the unspoilt rural views/space/character that the bryn melin and associated sites do. There is already some development within the area of this site. It is well connected with safe easy walking routes into the town centre, and better developed access to public transport and local amenities.

Atodiadau:

Gwrthwynebu

4 Safleoedd Ymgeisydd

ID sylw: 5971

Derbyniwyd: 08/03/2026

Respondent ID: 3443

Ymatebydd: Michael Lewis

Crynodeb o'r Gynrychiolaeth:

Site 455 I think would put a lot of pressure on the road infrastructure and traffic lights at Cowbridge and again be an unnecessary intrusion into the open countryside. And would adversely affect the aesthetics of the gateway to Cowbridge which partly gives the town so much of its charm!

Atodiadau:

Cefnogi

4 Safleoedd Ymgeisydd

ID sylw: 6065

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Cowbridge's inclusion as a Service Centre Settlement within the Strategic Growth Area Settlement Hierarchy is endorsed, recognising its access to services and excellent transport links. The under-allocation of housing land for Cowbridge, with only 105 units planned and no major lank bank sites is insufficient given that Cowbridge is a Tier 2 settlement in the hierarchy. To meet housing needs and the RLDP’s growth strategy more land at Cowbridge needs to be allocated for housing including land at Primrose Hill, for up to 220 dwellings.

Cefnogi

4 Safleoedd Ymgeisydd

ID sylw: 6405

Derbyniwyd: 13/03/2026

Respondent ID: 3572

Ymatebydd: Mrs Pamela Kay

Crynodeb o'r Gynrychiolaeth:

I would like to object to the development of the Bryn Melin field (site 370, and adjoining sites 475 and 514). Other sites (e.g 455 and 367) seem better suited to development as they have better access/transport links and already have adjacent suburban sprawl.

Atodiadau:

Gwrthwynebu

4 Safleoedd Ymgeisydd

ID sylw: 7222

Derbyniwyd: 09/03/2026

Respondent ID: 3743

Ymatebydd: Mr Thomas Lewis

Crynodeb o'r Gynrychiolaeth:

I am writing regarding the current consultation for the Replacement Local Development Plan (RLDP), specifically the candidate sites proposed for housing development in the Rural Vale area near Cowbridge.

I would like to formally express my strong concern about the inclusion of several greenfield sites for large-scale housing development. In particular, I am referring to candidate sites 367 (land on the bank approaching Cowbridge), 438 and 440 (between Cross Inn and Llanblethian), and 455 (Primrose Hill).

These locations form part of the rural landscape that defines the character of the Vale of Glamorgan and the setting of Cowbridge. Large housing estates on these greenfield sites would risk causing permanent damage to the countryside, the natural environment, and the historic rural character that makes this area unique.

The Rural Vale is valued for its open farmland, biodiversity, and scenic views. Development on this scale would place significant pressure on local infrastructure, increase traffic on already limited rural roads, and contribute to the gradual erosion of the countryside surrounding the town.

Where housing development is required, priority should instead be given to brownfield sites and previously developed land. For this reason, I believe that the potential redevelopment of site 448 at Llandow Airfield is a far more appropriate option, as it makes use of existing developed land rather than sacrificing valuable greenfield countryside.

I respectfully urge the Council to reconsider the inclusion of these greenfield sites in the RLDP and to prioritise sustainable development that protects the Rural Vale's landscape, environment, and heritage.

Thank you for taking the time to consider this representation as part of the consultation process.

Atodiadau: