The proposal should be rejected because it will exacerbate risks to the Heol Fain roadway, neighbouring land, and damage the environment. The site may not offer long term geological stability for the 50 houses, with subsidence most likely, and only time and magnitude in dispute. Subsidence is already present in the field adjacent to Heol Fain opposite and adjacent to the proposed site.

In the mid 1950s, the then owners of the whole site, the 50 dwelling proposal for the RLDP and 124 dwelling 2014/01424/FUL, sought planning permission to build a number of domestic houses on the site. Glamorgan County Council (GCC) sought advice from the Ministry for Welsh Affairs and a survey was undertaken. GCC turned down the application quoting advice that the site should never be used for domestic houses, due to geological reasons.

In periods of high rainfall, excess surface water simply flooded Heol Fain, which is a small public road at the side of the site, and ran off into the road ditch and gulley in the field to the west, running towards the coast.

In July 2015 Barratt plc started development on the site with permission for 124 dwellings. They constructed an installation to dispose of the surface rainwater, away from their development site. The drainage installation is centrally placed to the west side of this site which is this proposal for a further 50 dwellings, adjacent to Heol Fain.

Since installation of the drain, Heol Fain no longer floods. A sink hole currently approx. 40’(12m) diameter and 3’6‖ (1.2m) deep, first appeared in the field to the west of Heol Fain, adjacent to roadway, opposite the site drain Barratt had installed. It is increasing in size and depth each year.

Currently there is no threat to any dwelling as none are located near the underground cavity.

Barratt were informed of the matter in 2023 and advised to contact the VoGCC in respect of the possible risk to Heol Fain as a result of their drain installation and the collapse of the ground in the field. Their legal department were sent emails and hard copy by recorded delivery. Their legal dept, have made no response to any of this correspondence, failing to even acknowledge receipt.

A geological survey of Sep 2015 based on drilling bore holes to a depth of 105’ (30m) on behalf of Barratt showed that most of the site was impervious to rainwater and stated ― the test results across most of the site suggest there is typically limited or no potential for infiltration.

Drainage of surface water was achieved via a drain close to Heol Fain. At the site of the subsequent drain installation, the bore hole test report states the result ―Unable to induce a head of water ….due to rapid infiltration rate (1,000 litres used).” 1 The testers had attempted to fill the drilled test hole with water and then measure how far the level dropped over a given period of time. Instead, at this location, despite pumping 1,000 Litres in very quickly, the hole would not fill. They had drilled through into an underground cavity of an unknown size.

Rainwater is acidic and erodes limestone. A clay-mud layer near the surface generally prevents/greatly restricts rainwater permeating to the bedrock. The water stays on the surface and floods the land. The area is all limestone.

No scientifically reliable measurements have been undertaken of the rate of increase of the sink hole. These will commence on a regular basis this year.

The proposal to build 50 houses would generate an increase in surface water to be disposed of via the drain.
This will increase the underground erosion problem

The NPPF via SuDS requires that all drainage plans supporting new developments do not exacerbate existing drainage problems.

The risk of an underground cavity, to both the Heol Fain road and the site of the proposed build, around the drain installation, is clear but the scope is not known.

As long as rainwater is allowed to enter the underground cavity, that cavity will increase in size and the risk will continue to grow.

With the risk clear and environmental damage already occurring, this proposal should be struck from the Deposit Plan.

Geological surveys should be undertaken to quantify the problems and risks.