Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 5732

Derbyniwyd: 07/03/2026

Respondent ID: 1734

Ymatebydd: Mrs Dawn Jones

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The proposed development would result in urban sprawl. In 2022 Redrow built a wide,sweeping entrance to the site before obtaining planning permission. This was repaired and adopted by the Vale Council in 2023. The entrance to the field was covered in hardcore and beautiful trees were felled and other groundwork was undertaken. Erecting a huge 'motorway style' entrance with barriers and signage has already had an negative visual impact on the area.

The site in the ancient and beautiful Thaw Valley and is a designated Special Landscape Area which should be protected. It is of important recreational value with a footpath linking Windmill Lane to the St Athan Road which leads the way to other Valeway footpaths in every direction.

The site assessment should be scored red in respect of the natural environment and transport.

Atodiadau: