Insufficient access to the site from both Gileston Road and the B4265. Gileston Road is a bottleneck for access to the village. Bro Tathan also use this route (incorrectly). Road is too narrow with danger to pedestrians. Widening of Gileston Road is not possible without removing hedgerow which you have stated should be retained. Proposed signals at the junction will create even greater traffic congestion with an increase of traffic pollution. 20mph limit at present which is not kept to by most vehicles. Main access for all phases must be off B4265.
Better access direct from B4265 from the outset. Gileston Road is not suitable as main access point. Plan to widen Gileston Road is not clear and cannot be achieved without removing hedgerow. Better traffic calming measures required. Increased traffic and congestion not addressed fully. Too many houses as part of development. Drainage and sewage not addressed. Insufficient green space for number of houses proposed as already a lack of green space in the centre of the village.
Insufficient access to the site from both Gileston Road and the B4265. Gileston Road is a bottleneck for access to the village. Bro Tathan also use this route (incorrectly). Road is too narrow with danger to pedestrians. Widening of Gileston Road is not possible without removing hedgerow which you have stated should be retained. Proposed signals at the junction will create even greater traffic congestion with an increase of traffic pollution. 20mph limit at present which is not kept to by most vehicles. Main access for all phases must be off B4265.