I am writing to formally object to the planning proposal for the construction of 25 new houses in Maes Lloi, Aberthin for the following reasons:
1. The land has previously been rejected for development as it would constitute sporadic development in the countryside.
2. The RLDP directs growth to strategic and sustainable locations. Aberthin is classified as a Minor Rural Settlements not a sustainable growth location. The RLDP states that development should be focused on the Strategic Growth Area and Service Centres.
3. Cowbridge is already delivering substantial planned growth. Cowbridge, a designated service centre, has hundreds of homes either under construction or allocated. Infrastructure, services and sustainable transport are concentrated there-not in Aberthin.
4. The proposal represents disproportionate growth. Adding 25 dwellings would increase the size of Aberthin by approximately 15% in a single development.
5. Significant highway safety concerns. Introducing another junction would exacerbate existing safety risks.
6. Flood Risks and infrastructure concerns. Parts of the site fall within flood zone 2 and 3 requiring a full Flood Consequence Assessment.
7. This is a much valued green space, widely used by villagers and forms part of the walking route between Aberthin and Cowbridge.