1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
Chwilio sylwadau
Canlyniadau chwilio Ministry of Defence
Chwilio o’r newyddSylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
EMP2 - Y WEINYDDIAETH AMDDIFFYN SAIN TATHAN
ID sylw: 6700
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
The MOD notes and welcomes the intentions of Policy EMP2: MOD ST ATHAN. However, it is recommended that additional wording is added to make clear that this policy relates to the safeguarded MOD technical site.
Tall or narrow profile structures such as masts or flue stacks with a height of 50m or greater above ground level may introduce obstruction hazards to low flying military aircraft using the UK military low flying system.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
CC3 - ARDALOEDD CHWILIO LLEOL AR GYFER YNNI ADNEWYDDADWY
ID sylw: 6702
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
The MOD needs to be consulted on all proposals to develop wind turbines that are 11m or greater in height to blade tip or, that have a rotor diameter of 2m or greater. This is necessary to safeguard defence radar coverage across the UK used to manage MOD ranges, provide air traffic control and maintain UK air defence.
The MOD notes that Draft Policy CC3 assigns the renewable energy local search areas that have been defined in the deposit plan. This supports the generation of non-domestic renewable, low and zero carbon energy. The Renewable Energy assessment from 2023 identifies potential opportunity areas for renewable energy and provides a high-level assessment of wind and solar energy resource within the Vale of Glamorgan and identifies several sites, known as ‘search areas’ where the potential for development is greatest, and identification of 20 of the largest sites for both wind and solar.
In principle, the MOD has no objection to any renewable energy development occurring in the renewable energy local search areas that have been defined, subject to confirming that that it will be compatible with defence safeguarding requirements.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
CC4 - CYNHYRCHU YNNI ADNEWYDDADWY, CARBON ISEL A DI-GARBON
ID sylw: 6703
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
Draft policy CC4 defines requirements that any development will need to demonstrate compatibility with. It is noted that specific reference to aviation safeguarding is included. However, the MOD considers it necessary that this is expanded to include specific reference to those technical assets which facilitate aviation safety such as navigational aids. In addition, the MOD also considers it necessary that specific mention of the need to account for defence radar coverage in relation to wind energy development is specifically identified.
Some renewable energy generation infrastructure, for example wind turbine generators can, by virtue of their physical dimensions and properties, impact upon the effective operation of safeguarded defence technical installations. Solar farm developments located in proximity to safeguarded navigational aids, or other types of technical sites, can impact upon their effective operation by introducing substantial areas of metallic types of surfaces that may affect transmissions.
Where turbines are erected in line of sight to defence radars, the rotating motion of their blades can degrade and cause interference to their effective operation.
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
HG1 KS4 - TIR YN CHURCH FARM, SAIN TATHAN
ID sylw: 6704
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
MOD recommend that any more detailed policies for these sites include wording which indicates that development should be designed to ensure that it would have no impact on the operation or capability of defence sites or assets.
Policy HG1 KS4 - MOD St Athan (technical safeguarding zone)
Development triggering statutory safeguarding criteria:
• Development of, or exceeding, 15.2m in height above ground level will trigger statutory consultation requirement
• Development of, or exceeding, 45.7m in height above ground level will trigger statutory consultation requirement
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
HG1 KS5 - TIR I'R GORLLEWIN O SAIN TATHAN
ID sylw: 6705
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
MOD recommend that any more detailed policies for these sites include wording which indicates that development should be designed to ensure that it would have no impact on the operation or capability of defence sites or assets.
Policy HG1 KS4 - MOD St Athan (technical safeguarding zone)
Development triggering statutory safeguarding criteria:
• Development of, or exceeding, 15.2m in height above ground level will trigger statutory consultation requirement
• Development of, or exceeding, 45.7m in height above ground level will trigger statutory consultation requirement
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
HG1 (7)
ID sylw: 6706
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
MOD recommend that any more detailed policies for these sites include wording which indicates that development should be designed to ensure that it would have no impact on the operation or capability of defence sites or assets.
Policy HG1(7) - MOD St Athan (technical safeguarding zone)
Development triggering statutory safeguarding criteria:
• Any development or change of use will trigger statutory consultation requirement
• Development of, or exceeding, 10.7m in height above ground level will trigger statutory consultation requirement
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
HG1 (8)
ID sylw: 6707
Derbyniwyd: 11/03/2026
Respondent ID: 690
Ymatebydd: Ministry of Defence
MOD recommend that any more detailed policies for these sites include wording which indicates that development should be designed to ensure that it would have no impact on the operation or capability of defence sites or assets.
Policy HG1(8) - MOD St Athan (technical safeguarding zone)
Development triggering statutory safeguarding criteria:
• Any development or change of use will trigger statutory consultation requirement