Tir i'r de o'r rheilffordd,

Yn dangos sylwadau a ffurflenni 1 i 5 o 5

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 4951

Derbyniwyd: 27/02/2026

Respondent ID: 3016

Ymatebydd: Dr Tim Render

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The scale of housing development proposed for St Athan is excessive and spoils the nature of the heritage coast. Use of this site would breach the policy on the coast set out in the plan.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6124

Derbyniwyd: 11/03/2026

Respondent ID: 1702

Ymatebydd: Ms Ann Barnaby

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This plot is on a bad bend of the B4265 - safe access to site would be dangerous - and yet another allocation to many in this area. Full consideration to the over development of St Athan should be a separate discussion point! Together with the wider impacts to infrastructure as the B4265 is a major route to Barry, Cardiff and beyond.

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6136

Derbyniwyd: 11/03/2026

Respondent ID: 1702

Ymatebydd: Ms Ann Barnaby

Crynodeb o'r Gynrychiolaeth:

I agree with planners assessment - the location of this site on the B4265 would cause significant infrastructure safety issues

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6747

Derbyniwyd: 10/03/2026

Respondent ID: 854

Ymatebydd: Hallam Land Management

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Hallam recognise that this site could be a suitable location for a Welsh Medium Secondary School and, as a principle, is agreeable to the safeguarding of land for the footbridge landing on the northern side of the railway line.
Paragraph 6.250 of the Deposit RLDP is clear that the delivery of a Welsh-Medium secondary school is in response to a regional / sub-regional demand rather than a local need as a result generated either by the development of Land West of St Athan or other emerging allocations within St Athan and it cannot be the case that Hallam are expected to make disproportionate contributions to either the delivery of the school or required active travel improvements just because they have control of the site or that it is next to the Key Site.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6999

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - No watermains crossing the site.
Sewerage - No sewers crossing the site.
Wastewater Treatment Works (WwTW) - Welsh Water is delivering a scheme at West Aberthaw WwTW by 2030.

Atodiadau: