1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6706

Derbyniwyd: 11/03/2026

Respondent ID: 690

Ymatebydd: Ministry of Defence

Crynodeb o'r Gynrychiolaeth:

MOD recommend that any more detailed policies for these sites include wording which indicates that development should be designed to ensure that it would have no impact on the operation or capability of defence sites or assets.

Policy HG1(7) - MOD St Athan (technical safeguarding zone)
Development triggering statutory safeguarding criteria:
• Any development or change of use will trigger statutory consultation requirement
• Development of, or exceeding, 10.7m in height above ground level will trigger statutory consultation requirement

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6928

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Boyer Planning

Crynodeb o'r Gynrychiolaeth:

Although we do not necessarily dispute this sites progression, given Wates have submitted a full planning application (Ref 2024/01152/FUL) which is currently under consideration. It is important to recognise that, according to the Council’s online planning register, two substantive consultation concerns remain outstanding. Firstly, the Highways response raises fundamental layout issues; and secondly, the Ecology department maintains a holding
objection on the basis of insufficient supporting evidence. To date we understand both matters remain unresolved and may well require extensive design amendments, additional technical work, and potentially further consultation before the application can ultimately be determined.

In the absence of confirmed solutions to these issues, there remains uncertainty regarding the timeframe for determining the planning permission. Furthermore, even if consent is secured, there will be a need to discharge conditions and address any pre-commencement
requirements, which will inevitably impact the lead-in time before development gets underway. Given these outstanding matters, the assumption that development will commence in 2027/28 appears optimistic at this stage. Delivery timescales may be extended depending on the scaleof amendments required and the duration of condition discharge processes. With this in mind,
we believe it is prudent for the emerging RLDP to identify a broader and more diverse portfolio of site allocations to support housing delivery earlier on in the plan period. Ensuring flexibility through additional deliverable sites will reduce the Council’s overreliance on sites such as this one and provide greater certainty in maintaining a more
consistent supply.

Atodiadau:

Sylw

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 6984

Derbyniwyd: 01/04/2026

Respondent ID: 1741

Ymatebydd: Dwr Cymru Welsh Water : Developer Services

Crynodeb o'r Gynrychiolaeth:

Water Supply - Dwr Cymru Welsh Water has made representations on planning application ref 2024/01152/FUL. A hydraulic modelling assessment (HMA) will be required.
WAstewater - Dwr Cymru Welsh Water has made representations on planning application ref 2024/01152/FUL. A hydraulic modelling assessment (HMA) will be required.
Wastewater Treatment Works - Dwr Cymru Welsh Water has made representations on planning application ref 2024/01152/FUL. Welsh Water is delivering a scheme at West Aberthaw WwTW by 2030, and capacity will be available at the WwTW to accommodate foul flows from the proposed allocation upon completion of a scheme at the WwTW.

Atodiadau:

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7043

Derbyniwyd: 10/03/2026

Respondent ID: 2413

Ymatebydd: Marion morgan

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes and, given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. The justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7144

Derbyniwyd: 11/03/2026

Respondent ID: 1182

Ymatebydd: Peter Stone Properties Ltd

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes and, given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. The justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7164

Derbyniwyd: 11/04/2026

Respondent ID: 2373

Ymatebydd: Wig Fach Property Company Ltd

Asiant : Geraint John Planning Ltd

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The strategy to allocate new housing growth is predicated on focusing residential development around sustainable transport nodes and, given that St Athan will be without any railway station in the Plan period, it is not considered that the sites align with the strategy of the RLDP. It is considered that there has been an overprovision for housing growth in St Athan generally, and this issue is now further exacerbated by the lack of any forthcoming rail provision. Given this, to add further sites for housing in this location over and above the original provision is considered to be unsound. The justification to allocate sites at St Athan has relied heavily on the railway station being delivered in the Plan period, and as such, there are serious questions marks associated with the acceptability of the proposed allocated sites - given their incompatibility with the core strategy of the RLDP.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

ID sylw: 7208

Derbyniwyd: 01/03/2026

Respondent ID: 3064

Ymatebydd: Mr Clifton Russell

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

My objections refer to the village of St Athan and its proposed overdevelopment - The village has limited infrastructure two doctors surgeries which are full to capacity with existing patients, a school which apparently is full and struggles to take on any additional children three shops but it is proposed to add 1100 houses over possibly 7 building sites. This means an additional 1500 -2000 vehicles on the already narrow and congested roads some of which were built for horse and carts not large motorcars. We do not have a railway station or a regular half hourly bus service.
Whilst I accept the principal of sustainable growth, there are limited employment opportunities. People will need to travel out of the area for work (Cardiff, Barry, Bridgend etc) which means extra vehicles on the roads causing congestion, especially at the monument entrance to St Athan.