DNP7 – AWYR DYWYLL
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6203
Derbyniwyd: 11/03/2026
Respondent ID: 3488
Ymatebydd: Mr David Ambrose
It is vital in relation to SP20 - BIODIVERSITY AND ECOSYSTEM RESILIENCE that proposals for external lighting (including security lighting, amenity lighting, illuminated advertisements and lighting associated with highways, car parks, sports facilities and commercial and industrial operations) will only be permitted where it has been demonstrated that the lighting proposed has no adverse impacts on biodiversity and ecological connectivity or visual and landscape character;
It is vital in relation to SP20 - BIODIVERSITY AND ECOSYSTEM RESILIENCE that proposals for external lighting (including security lighting, amenity lighting, illuminated advertisements and lighting associated with highways, car parks, sports facilities and commercial and industrial operations) will only be permitted where it has been demonstrated that the lighting proposed has no adverse impacts on biodiversity and ecological connectivity or visual and landscape character;
Sylw
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6623
Derbyniwyd: 26/02/2026
Respondent ID: 694
Ymatebydd: South Wales Police – Secured by Design Officer
Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise. South Wales Police would ask that Designing Out Crime Officers are involved at the pre planning stage to discuss and be able to make recommendations in relation to lighting.
We would like to thank you for consulting with South Wales Police in respect of the Replacement Local Development Plan 2021 to 2036.
We welcome working with The Vale of Glamorgan Council in respect of The Vale of Glamorgan Replacement Local Development Plan 2021 – 2036: Deposit Plan to ensure the future needs and community safety is addressed within the plan and supporting documents.
We would respectfully ask that our comments are taken into consideration, and included in the plan, and that we can work in partnership to develop the specific planning guidance documents mentioned below.
The replacement development plan outlines its Vision and objectives of the RLDP as follows:
‘By 2036’:
The Vale of Glamorgan is a healthy and inclusive place for everyone, with equitable access to services and facilities both physically and digitally. Residents are proud of where they live and have access to the homes they need. Housing growth has delivered homes which caters for all, including affordable homes and older person’s housing; contributing towards diverse and cohesive communities where residents can maintain their independence.
Through placemaking, places and spaces are safe, accessible and socially inclusive. Development respects local character and sense of place is valued by residents and contributes positively towards health and wellbeing. Positive improvements have been achieved in narrowing the disparities in Integrated Sustainability Appraisal (ISA) for the Replacement Local Development Plan Prepared for: Vale of Glamorgan Council AECOM 5 the quality of life and health outcomes for residents living in the most deprived areas through improved access to employment, education, training, services, and investment in the built environment.
The Vale enjoys a network of connected, multi-functional and accessible green and blue spaces, providing a range of enhanced leisure and health benefits within and between towns, villages, and the countryside. More residents participate in active and healthy lifestyles. Investment in green infrastructure has produced a net biodiversity benefit with the creation of new habitats, enhanced connectivity and Planting providing carbon storage and contributing towards Climate Change resilience and adaptation.
Objectives:
1. Mitigating and adapting to climate change
2. Improving mental and physical health and well-being
3. Homes for all
4. Placemaking
5. Protecting and enhancing the natural environment
Policies that support the role of a Designing Out Crime Officer and Secured by Design are as follows:
Secured by Design (SBD) is the official police security initiative that works to improve the security of buildings and their immediate surroundings to provide safe places to live, work, shop, and visit.
Planning Policy Wales (PPW) states that crime and prevention and fear of crime are social considerations to which regard must be given by local planning authorities in the preparation of development plans. They should be reflected in any supplementary planning guidance and may be material considerations in the determination of planning applications. The aim should be to produce safe environments through good design.
Technical Advice Note (TAN) 12: Design, provides advice for all those involved in the design of development on how good sustainable design can be facilitated through the planning system. TAN 12 reminds practitioners that local authorities (including National Park Authorities) are required to have due regard to crime and disorder prevention in the exercise of their functions under Section 17 of the Crime and Disorder Act 1998.
TAN 12 recognises the Secured by Design initiative as a standard that has been shown to reduce crime.
TAN 12, paragraph states that ‘Local authorities are advised to consult Designing out Crime Officers on pre-applications and planning applications for those developments where there is potential to eliminate or reduce crime through the adoption of suitable measures at the design stage. This is especially important for major developments such as new housing estates, industrial estates, shopping centres, leisure complexes, schools, and car parks. It is important to consult Designing out Crime Officers at as early stage as possible – by the time a formal application is submitted, the opportunity to take account of advice may already be limited.’
Section 17 of the Crime and Disorder Act 1988 requires local authorities to consider crime and disorder implications in all their authorities and functions and do all that they reasonably can do all they can do to reduce these problems.
Violence against women and Girls:
Crime has a major impact on people’s lives in the Vale of Glamorgan and impacts on the health of the public especially those who have been victims of crime and anti-social behaviour and vulnerable groups such as Women and Girls.
In spring 2023, the Home Secretary announced Violence Against Women and Girls as a national threat and included it within the 9 Strategic Policing Requirement (SPR) alongside terrorism, serious and organised crime, and child sexual abuse.
Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise, for all. The importance of this is outlined within the National Police Chiefs’ Council’s (NPCC) ‘Policing Violence Against Women and Girls – The National Framework for Delivery: 2024 – 2027’ under the ‘Prevent’ element of the strategy; outlining the need for building safer spaces and places. Further information is available at: https://www.npcc.police.uk/SysSiteAssets/media/downloads/our-work/vawg/vawg-framework-fordelivery.pdf
In Wales, planning is devolved. Planning Policy Wales and Future Wales: The National Plan 2040 set out the Welsh Government’s national planning policy, where new developments are proposed. Planning Policy Wales explains: “A clear rationale behind the design decisions made […] should be sought throughout the development process and expressed, when appropriate, in a design and access statement.”
76 The guidance for design and access statements for Wales categorises five key objectives of good design (Access, Character, Community Safety, Environmental Sustainability and Movement) and explains how meeting these objectives should ensure that both design quality and inclusive access are given sufficient consideration in the planning process.
77 Design and access statements have been required in Wales for many planning applications since 2009 and have been part of legislative requirements since the Planning (Wales) Act 2015.
The Angiolini Inquiry Part 2 First Report: Prevention of sexually motivated crimes against women in public Ordered by the House of Commons to be printed on 2 December
In Wales, local authorities are under legal obligation to consider and address crime while in the process of planning: “Local authorities [in Wales] are under a legal obligation to consider the need to prevent and reduce crime and disorder in all decisions that they take. Crime prevention and fear of crime are social considerations to which regard should be given in the preparation of development plans and taking planning decisions. The aim should be to produce safe environments that do not compromise on design quality in accordance with the cohesive communities’ wellbeing goal.”
The Inquiry considers that there would be an opportunity to place a greater focus on preventing sexually motivated crimes against women in public spaces if this priority were reflected in planning guidance and principles.
For instance, neither the English nor the Welsh documentation contains specific reference to considering how design can help prevent violence against women in public spaces. The Inquiry saw evidence of this being discussed: “Under public spaces in the National Model Design Guide it mentioned well located, attractive public spaces. But there is no mention of violence against women and girls. There is minimal mention of crime reduction, just that amenity spaces should make people feel safe, help overcome crime, reduce the fear of crime.”
The Terrorism (protection of premises)Act 2025 (Martyn’s Law)
This Act became legislation on the 3rd of April 2025. This legislation is to improve protective security and preparedness across the United Kingdom for certain premises.
South Wales Police and Counter Terrorism Policing Wales would ask that where this legislation applies that early consultation takes place with the Designing out crime officers and Counter Terrorism Policing Wales.
If a premises falls within the scope of the The Terrorism (Protection of Premises) Act 2025, the development plans should be referred to South Wales Police Designing Out Crime Officers who will in turn will take advice from Counter Terrorism Policing Wales. This consultation should take place at the pre planning stage.
Standard Tier- will drive good preparedness outcomes. Locations with a maximum occupancy of greater than two hundred people will be required to have appropriate public protection procedures in place to ensure effective protective security and preparedness if an act of terrorism were to occur in their premises or immediate vicinity.
Enhanced Tier- focused on high-capacity locations in recognition of the potential consequences of a successful attack. Locations with an occupancy of eight hundred plus at any time will be required to have in place as reasonably practicable, appropriate public protection procedures and measures that can be expected to reduce the vulnerability of the premises, and the risk of physical harm being caused to individuals if an attack was to occur there or nearby.
Premises will fall within scope of The Terrorism (protection of premises)Act 2025 where “qualifying activities” take place. This will include activities such as entertainment, leisure, retail, food and drink, museums and galleries, sports grounds, public areas of local and central Government buildings (e.g. town halls), visitor attractions, temporary events, Places of Worship, health, and education.
The legislation applies to eligible locations which are either: a building (including collections of buildings used for the same purposes, e.g. a campus); or location/event (including a temporary event) that has a defined boundary, allowing capacity to be known. Eligible locations whose maximum occupancy meets the above specified thresholds will be then drawn into the relevant tier.
Public Spaces:
It should be borne in mind that the development of public spaces which are either owned, managed or they have influence over should also include protected security and preparedness at the concept stage of the planning process.
South Wales Police recommendations:
Our recommendations are set out below in relation the objectives and specifically to preventing crime and disorder and enhancing community safety:
1. Mitigating and adapting to climate change Secured by Design Residential Guide 2025 states:
Crime committed in 2011 in England and Wales is estimated to have given rise to over 4 million tonnes CO2e, equivalent to emissions of around 900,000 UK homes. Burglary resulted in the largest proportion of the total footprint (30%) due to large volume of offences and the carbon associated with replacing stolen or damaged goods.
Source: “Addressing the Carbon-Crime Blind Spot - A Carbon Footprint Approach” (2016). Helen Skudder, Professor Angela Druckman, Jon Cole, Alan McInnes, Dr Ian Brunton-Smith, Dr Gian Paolo Ansalon.
Secured by Design states ‘The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage (Note 1.5). It also has a significant impact on anti-social behaviour.
Therefore, there are substantial carbon cost savings associated with building new homes and refurbishing existing homes to the SBD standard i.e. less replacement of poor-quality doors, windows and the stolen property from within the home as a result of criminal acts. This has been achieved through adherence to well-researched and effective design solutions, innovative and creative product design coupled with robust manufacturing standards.’
Research documentation can be found on the SBD website at: https://www.securedbydesign.come
Recommendations:
• SP 6 - Ensure early consultation with the Designing Out Crime Officer and to achieve Secured by Design on all new developments and refurbishments.
• CC5 - Heat Networks – Advice should be sought from the Designing Out Crime officer to ensure the safe placement of heat pump devices.
• CC5 – Consultation should take place with the Designing Out Crime Officer in respect of wind or solar farms, so Secured by Design can be achieved.
• DNP7 – DARK SKIES – Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise. South Wales Police would ask that Designing Out Crime Officers are involved at the pre planning stage to discuss and be able to make recommendations in relation to lighting.
Reason: To reduce the carbon footprint of development.
2. Improving mental and physical health and well-being
• PGD1 – Creating well designed and inclusive places states:
Development must demonstrate that the following:
Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance
Ensuring that public open space, private amenity space and cycle and car parking in accordance with the Council’s standards.
Secured by Design Residential Guide states:
Poorly designed and specified public realm and communal areas, such as playgrounds, roof gardens, communal gardens, community dining rooms, toddler play areas, seating facilities have the potential to generate crime, the fear of crime and anti-social behaviour.
The design and layout of play spaces will vary depending on the age requirements. The provision of inclusively designed public amenity/play spaces as an integral part of residential developments, should make a valuable contribution towards the quality of the development and the character of the neighbourhood.
Recommendations:
• PGD 1 - Facilities shall be designed to allow natural surveillance from nearby dwellings with safe and accessible routes for users to come and go. Boundaries between public and private space shall be clearly defined and open spaces must have features which prevent unauthorised vehicular access. Communal spaces as described above should not immediately abut residential buildings.
• SP 5 - South Wales Police would recommend that all new public space is designed to Secured by Design standards (Residential) Guide. Use the ‘Safer Parks’ document (research by ‘Make Space for Girls’) to design safe communal spaces. Designing Out Crime officers should be consulted at pre planning stage to give their recommendations for communal space.
Reason: To enhance community safety and prevent antisocial behaviour.
3. Homes for all
Policy 7- Delivering Affordable Homes
The Vale of Glamorgan Housing Strategy 2021-2026
The strategy includes a long-term vision for housing in the Vale where “All residents in the Vale of Glamorgan have access to good quality, suitable housing and can live happily and independently in vibrant, sustainable communities.”
• Aim 1: More Homes, More Choice.
• Aim 2: Improved homes and communities.
• Aim 3: Better housing advice and support.
• Aim 4: Equality of access to housing and housing services.
‘The Vale has a significant need for affordable homes, with affordable housing need remaining one of the highest in Wales, even though the Vale is one of highest performing authorities in Wales in terms of affordable housing delivery. Using the principal projections, the Council’s 2023 Local Housing Market Assessment (LHMA)
identifies a need for 1,075 affordable homes per annum over the 5-year period 2023-2028 and 154 affordable homes per annum for the following 10 years.’
Ensure that all new residential developments provide high quality housing that includes the right mix, tenure and type of homes that respond to the changing needs of the Vale’s population. This includes homes that are affordable, accessible and adaptable for people of all ages and that address the identified accommodation needs of all the Vale’s communities through all stages of life.
The Vale of Glamorgan Older Persons Housing Strategy
2.84 The Council’s Older Persons Housing Strategy ‘Creating Homes and Neighbourhoods for Later Life 2022-2036’ sets out a vision for the Vale of Glamorgan which seeks: ‘to secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.”
All Welsh Government grant funded housing refurbishments must comply with the Development Quality Requirement (DQR) and achieve Secured by Design Silver award.
South Wales Police would ask that all new developments are designed and built to Secured by Design standards this includes roads, paths, lighting, defensible space and house types/ standards. We would ask that at the pre planning advice is sought from the Designing Out Crime Officer to advise on crime prevention through environmental design.
Violence Against Women and Girls:
The harm caused to victims and society by violence against women and girls (VAWG) in all its forms, including but not limited to, harassment, stalking, rape, sexual assault, murder, honour-based abuse and coercive control is incalculable. While men and boys also suffer from many of these forms of abuse, they disproportionately affect women.
In spring 2023, the Home Secretary announced Violence Against Women and Girls as a national threat and included it within the 9 Strategic Policing Requirement (SPR) alongside terrorism, serious and organised crime, and child sexual abuse.
Secured by Design can assist with ensuring that the built environment in all its forms is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise, for all. The importance of this is outlined within the National Police Chiefs’ Council’s (NPCC) ‘Policing Violence Against Women and Girls – The National Framework for Delivery: 2024 – 2027’ under the ‘Prevent’ element of the strategy; outlining the need for building safer spaces and places. Further information is available at:
https://www.npcc.police.uk/SysSiteAssets/media/downloads/our-work/vawg/vawg-framework-fordelivery.pdf
South Wales Police recommendations:
• SP 6 - All Welsh Government grant funded homes MUST meet Secured by Design Gold or in the case of a refurbishment Silver. Consultation with the Designing Out crime Officer should take place at the pre planning stage when an application for Secured by Design should also be made.
• SP6 - HOUSING REQUIREMENT - Where a change of use/ mixed use retail, community leisure and active travel routes are planned Secured by Design Residential and Commercial guides should be applied. Early consultation with Designing out crime officers particularly in the Town Centres is recommended.
• SP6 - HOUSING REQUIREMENT - Designing Out Crime Officers should be consulted at the concept stage of a development, where there are 10 or more housing units and in the case of commercial space 1000 square metres.
• SP6/ HG 7 - HOUSING REQUIREMENT - South Wales Police Designing Out Crime Officers to work in partnership with the Vale of Glamorgan Council Planning Department to compile a specific planning guidance in relation to Houses of multiple occupancy.
• SP6 - HOUSING REQUIREMENT- South Wales Police would ask that all flats/ apartments’ conversions meet WDQR (Welsh Design Quality Standards) and achieve at least a Secured by Design silver award.
• SP6 - Housing Requirement - In the case of the change of use of residential land or properties, South Wales Police would ask that any change of use application is sent to South Wales Police Designing out crime officers.
• SP 6 - South Wales Police are involved in discussion with the Vale of Glamorgan Planning Department and the compilation of Specific planning guidance to cover co-living and similar shared facility developments.
• SP6 - HOUSING REQUIREMENT -Where co- living developments are proposed to deliver a balanced housing mix. South Wales Police would ask that the pre planning discussions take place with the Designing Out Crime officer and that the development is built to Secured by Design standards as set out in the most current Secured by Design Residential Guide.
• SP3 – DEVELOPMENT IN THE COUNTRYSIDE (Policy GT1/ SP9 – Gypsy and Traveller Site Provision). The site is reasonably accessible to essential services and facilities such as healthcare, education, employment, and public transport. Safe and appropriate vehicular access can be provided from the highway network, and the site layout affords adequate provision for parking, turning, servicing and emergency vehicle. South Wales Police would ask that they consulted to provide Secured by Design advice at the pre planning stage of any such development.
• HG6 – PROVISION OF SPECIALIST ACCOMMODATION
The accommodation is appropriately designed to meet the specific needs of the intended residents, including older people, people with disabilities, those with mental health needs, and other vulnerable groups. The development is located in an accessible and sustainable location, with good access to public transport, community facilities, health services, and local amenities –
-All specialist housing is built to Secured by Design and South Wales Police are involved at the pre planning stage of specialist developments.
• The Vale of Glamorgan Older Persons Housing Strategy:
‘To secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.”
HG 6 - All older person’s housing to be built to Secured by Design standards and pre application consultation with Designing Out Crime Officers.
• HG7 - HOUSES IN MULTIPLE OCCUPATION (HMO’s)
South Wales Police would ask that they work in partnership with The Vale of Glamorgan Planning Department, to develop a specific planning Guidance in relation to Houses of Multiple Occupancy.
• SP3 - Development in the Countryside Affordable Housing (Policy HG5) – Consultation takes place. Where, developments are planned outside the specific main areas South Wales Police would ask that they are consulted about the proposed infrastructure and design of such developments. - Early consultation is recommended with Designing Out Crime officers and South Wales Police Traffic Management.
• PGD 2 /SP 4 - ‘Ensure major new development is directed to locations that are or will be by the time of initial occupation easily accessible by walking, cycling, and public transport.’- Early consultation with South Wales Police Designing Out Crime Officers and South Wales Police Road Traffic Management Department where roads and pathways are planned to be built.
• SP5 – Creating Healthy and Inclusive Places and spaces: Ensuring development proposals are designed to facilitate accessible healthy environments to address relevant determinants of health positively, particularly in response to local health needs; • Ensuring that all places and developments are as inclusive as possible, capable of adapting to a broad range of changing needs and delivering a high quality of life. – Designing Out Crime Officers are consulted at pre planning to ensure public space is designed to ensure the space is safe and inclusive for all and especially vulnerable groups. (Safer Parks Document, Angelini Enquiry).
• SP 4 - Supporting the provision of new and enhanced community and healthcare facilities: Where Health care facilities are proposed South Wales Police would ask that Secured by Design Commercial Guide /Hospitals Guide are followed and that the Designing Out Crime officer is consulted at the pre planning stage.
• SP19 – Waste management: Secured by Design guides give guidance in respect of waste management and storage. South Wales Police would ask that pre Planning advice is sought in respect of new developments and waste management.
Reason: To enhance community safety especially vulnerable groups.
4. Placemaking and Good Design
Future Wales - The National Plan 2040 (Welsh Government, February 2021)
Policy 2 - Shaping Urban Growth and Regeneration - Strategic Placemaking
The Placemaking Charter and Placemaking Plans:
Signatories to the Charter agree to promote the following principles in the planning, design and management of new and existing places:
• People and community.
• Location.
• Movement.
• Mix of uses.
• Public Realm
• Identity.
SP4 – PLACEMAKING
Development will be required to follow Placemaking principles by:
1 Ensuring high quality sustainable design that reflects local distinctiveness, character, and cultural identity.
2 Prioritising the determinants of health and well-being during the design process.
3 Creating a diverse mix of uses and multi-functional spaces.
4 Contributing to a vibrant, safe and inclusive public realm that encourages Active Travel, supports public transport use and reduces car dependency.
5 Strategically integrating Green Infrastructure networks and open space into development, delivering social, environmental and ecological benefits.
6 Providing a range of housing types and tenure.
7 Locating development appropriately where homes, local services and facilities are accessible and well connected and integrated with existing communities.
8 Developing high densities where appropriate, making the most efficient use of land and supporting mixed uses.
9 Protecting or enhancing the Historic Environment and its setting. Placemaking Statements will be required for all major developments setting out how the proposal accords with Placemaking Principles. In the towns of Barry, Cowbridge, Llantwit Major and Penarth Placemaking Statements should also have regard to the adopted Placemaking Plans for the area.
Designing Out Crime officers’ recommendations:
• SP 4 / PGD 1/ CC 4 - Research shows that Secured by Design developments are sustainable and reduce the carbon footprint. The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage It also has a significant impact on anti-social behaviour. South Wales Police ask that all new developments are built to Secured by Design standards and that they are work with The Vale of Glamorgan planning Department at the pre planning stage.
• SP 4 / PGD 1 -When designing developments road, paths and green space, South Wales Police would ask that the developments are built to Secured by Design standards. We would ask that Designing Out Crime Officers and South Wales Police Traffic Management Department are involved in the pre planning stage.
• PGD 2 /SP 4 - It is important when designing roads and footpaths to maximise the benefits of passive surveillance, and furthermore, when addressing safety and security of street layouts, public realm, and footpaths, that Secured by Design guidance is followed, this includes landscape design, lighting, layout of buildings, etc. to ensure that all roads and footpaths (including public rights of way) are safe, secure, and accessible for all, in support of the Violence Against Women and Girls (VAWG) agenda. Where a mix development e.g. housing and retail/other use (with ten or more units) applications should be referred the designing out crime at the pre planning stage.
• SP4/ PGD1 - Contributing to a vibrant, safe and inclusive public realm - Where active travel routes are being planned, South Wales Police Traffic Management Team should be consulted throughout the planning process.
• PGD1- Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance. Secured by Design considers natural surveillance and the placing of communal spaces and provision provided. All mixed uses and multi-functional) developments should be discussed at the pre- planning stage with the Designing Out Crime Officer.
• PGD 2/ SP 4 - Developing high densities where appropriate, making the most efficient use of land and supporting mixed uses. Work in partnership with Designing out crime officers to write a ‘Houses of multiple occupancy’ Specific Planning Guidance.
• SP 4 - Strategically integrating Green Infrastructure networks and open space into development, delivering social, environmental and ecological benefits. Where public realm is being planned to include active travel routes, designing out crime officers and Counter Terrorism Security Advisors should be consulted if the space falls under The Terrorism (protection of premises)Act 2025 .
• SP 4 -When planning parks and community space. Public consultation should took place, and the plans referred to the designing out crime officer. (The ‘Safer Parks’ research by Making space for women is a document that can offer up to date advice in relation to safety/ and inclusivity).
• SP 1- When designing new schools early consultation with the South Wales Police Designing out crime officer and Traffic Management officers is prudent to ensure the safety of pupils. Achieving Secured By Design accreditation for the school will ensure that the school is planned and built with safety in mind from the outset. All schools should achieve SBD GOLD.
• HG 6 - The Vale of Glamorgan Older Persons Housing Strategy 2.84 The Council’s Older Persons Housing Strategy ‘Creating Homes and Neighbourhoods for Later Life 2022-2036’ sets out a vision for the Vale of Glamorgan which seeks: ‘to secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.”
• The Vale of Glamorgan Older Persons Housing Strategy 2.84 The Council’s Older Persons Housing Strategy ‘Creating Homes and Neighbourhoods for Later Life 2022-2036’ sets out a vision for the Vale of Glamorgan which seeks: ‘to secure the best quality of life for older people to live as independently as possible in later life. This means delivering a range of accommodation that enables older people to live fulfilling lives and enjoy good health in attractive homes that meet their needs and allow them to retain their independence as they age.” - Developments, for older residents are built to Secured by Design standards as per the Secured by Design Residential Guide.
• SP4 - Protecting or enhancing the Historic Environment and its setting: Secured by Design can be applied to historic building, contact should be made at the pre planning with the Designing Out Crime Officer.
• PGD1- Creating safe, accessible, integrated, inclusive and active environments that make efficient use of land and promote opportunities for Active Travel, and promote sustainable transport choices – Early liaison with South Wales Police and South Wales Police Traffic Management Officers so that designs can be agreed and are safe.
• SP 1 - A number of new primary and secondary schools have been developed across the Vale as part of the Sustainable Communities for Learning Programme (previously known as 21st Century Schools), with further plans as part of the programme progressing – Consultation should be sought from South Wales Police Designing Out Crime Officers and Road Traffic Management Officers at the pre planning stage planning stage with the Vale of Glamorgan Council.
• PGD 1 Incorporating sustainable design and construction solutions to maximise energy efficiency and positively contributing towards climate change resilience and adaptation. The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage (Note 1.5). It also has a significant impact on anti-social behaviour. Therefore, there are substantial carbon cost savings associated with building new homes and refurbishing existing homes to the SBD standard i.e. less replacement of poor-quality doors, windows and the stolen property from within the home as a result of criminal acts. - All developments are built to secured by Design to reduce the carbon footprint.
• PGD1 Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance - Facilities shall be designed to allow natural surveillance from nearby dwellings with safe and accessible routes for users to come and go. Boundaries between public and private space shall be clearly defined and open spaces must have features which prevent unauthorised vehicular access. Communal spaces as described above should not immediately abut residential buildings – Consultation with Designing Out Crime Officers and the community should take place at the pre planning stage to develop safe, inclusive spaces.
• C I3/SP13 – NEW COMMUNITY FACILITIES – Consultation should be sought from Designing out crime officers where schools/ colleges are proposed and they should meet Secured by Design Gold.
• Town Centre First SP11 - The town centre of Holton Road in Barry and the District Centre of High Street had higher than average vacant units. There is a need to ensure that future policies allow for flexibility for a greater range of uses that would be acceptable within a town centre, in line with the town centre first principle and the need to create vibrant places. South Wales Police would ask that they are consulted and are able to give advice where policies are developed for town centres. We would also ask that Designing Out Crime Officers are consulted at the pre planning stage.
• PGD1/SP 11 - Making a positive contribution to the character of the area, responding to the local context and character through building forms and scale; materials and features, mix of uses, landscape, density, and connectivity of streets and spaces to create and/or enhance locally distinctive design and character - Designing out crime officers should be consulted at pre planning stage to ensure safe spaces.
• PGD1/SP11/SP13 - Demonstrating that traffic movements to and from the development can be accommodated, resolved, or mitigated to an acceptable degree, and where car parking is provided, this must be sensitivity integrated into the development so that it does not dominate the layout of the development: South Wales Police Traffic Management Department to be consulted by the Vale of Glamorgan Highways Department in respect of road layout/active travel routes at the pre planning stage.
• PGD1- Ensuring that public open space, private amenity space and cycle and car parking in accordance with the Council’s standards – Where Public open space is being designed, the duty from The Terrorism (protection of premises)Act 2025 should be applied where a premises meets the standard as above. South Wales Police Designing out crime officer should be consulted at the pre planning stage to advice.
• SSC 1/ PG 1 - Car parks are designed and built to ‘Park Mark’ standards as per Secured by Design Non – Residential (Commercial)Guide.
• PGD1/CC1/ SP19 – Creating well designed and inclusive facilities - ‘Providing high quality multi-functional green open spaces which can provide a choice and range of activities, including play, that also deliver enhanced biodiversity and flood mitigation and are designed to be resilient to climate change and adaptable overtime.’: Consultation with the community should be sought from the outset. Parks and green spaces must be designed with safety being the key driver especially for vulnerable groups such as women and girls (Safer Parks document). Designing Out Crime Officers should be consulted at the pre planning stage to achieve this.
• PGD1 Ensuring no unacceptable impacts on public and residential amenity, particularly regarding privacy, overbearing, security, noise and disturbance.
(As above)
• PGD1: Demonstrating that traffic movements to and from the development can be accommodated, resolved, or mitigated to an acceptable degree, and where car parking is provided, this must be sensitivity integrated into the development so that it does not dominate the layout of the development – South Wales Police Designing out crime officers and Traffic Management Officers to be consulted on the layout of developments at pre planning stage.
• TR1/SP 10: Future plans for the continued regeneration of the Waterfront include the redevelopment of the Mole for apartments, a linear park and water sports centre – South Wales Police would ask that Designing Out Crime and Road Safety Management Officers are involved where redevelopment is to take place, consultation should be sought at the pre planning stage.
• RC52 – Edge of town centre retailing: South Wales Police would ask that the Designing out crime and traffic management officers are contacted in respect of new developments and the travel routes to them.
• EMP2 - MOD St Athan - New development within or adjoining MOD St Athan that is demonstrated to be required for operational defence and security purposes, and helps enhance or sustain their operational capability, will be supported in principle. – Advice should be sought from Counter Terrorism Wales and Designing Out Crime officers where redevelopment of/ adjacent to MOD St Athan is planned.
• SP15 – Sustainable Tourism: Promoting opportunities for visitors to engage in forms of tourism that have a low impact on the environment; 2 Protecting and enhancing existing tourism attractions and leisure facilities; 3 Enhancing the visitor economy, attracting local investment, providing local employment opportunities and contributing to rural diversification; 4 Recognising and protecting the Vale’s distinct local identity, built and natural environment as assets to tourism; Providing a variety of tourism opportunities, particularly through all year round facilities and a range of appropriately located visitor accommodation; and 6 Encouraging tourism visits to be made by active and sustainable transport modes – Designing Out Crime Officers advice and advice in respect of Crowded Places to be sought at the pre planning state of any event.
• CI4 – Protecting and enhancing existing community facilities: Proposals for new community facilities or proposals which seek to retain, enhance or maintain existing community facilities will be supported. This includes the provision of multi-use community facilities, including the colocation of healthcare, schools, libraries and leisure facilities – South Wales Police would ask that all new community facilities plans are referred to the Designing Out Crime Officer and Counter Terrorism Wales for early consultation.
Reason: To ensure all public realm is safe, espcially for vulnable groups such as women and girls.
5. Protecting and enhancing the natural environment
Ecological Networks and Green Infrastructure
Project Zero - The Vale of Glamorgan Council’s Climate Change Challenge Plan 2021-2030
The Vale of Glamorgan Local Area Energy Plan (2024)
Maximise reduction in carbon emissions across all activity. • Improve efficiency to reduce energy demand.
Work towards new and existing buildings becoming low carbon prioritising inclusivity, equality, and fairness.
The LAEP is a live document which should be updated every 5 years. It identifies the following priority areas that will be the focus in the short term to assist in setting the Vale on the pathway to net zero: • Making homes low carbon.
Crime committed in 2011 in England and Wales is estimated to have given rise to over 4 million tonnes CO2e, equivalent to emissions of around 900,000 UK homes. Burglary resulted in the largest proportion of the total footprint (30%) due to large volume of offences and the carbon associated with replacing stolen or damaged goods.
Source: “Addressing the Carbon-Crime Blind Spot - A Carbon Footprint Approach” (2016). Helen Skudder, Professor Angela Druckman, Jon Cole, Alan McInnes, Dr Ian Brunton-Smith, Dr Gian Paolo Ansalon.
The environmental benefits of SBD are supported by independent academic research consistently proving that SBD housing developments experience up to 87% less burglary, 25% less vehicle crime and 25% less criminal damage (Note 1.5). It also has a significant impact on anti-social behaviour. Therefore, there are substantial carbon cost savings associated with building new homes and refurbishing existing homes to the SBD standard i.e. less replacement of poor-quality doors, windows and the stolen property from within the home as a result of criminal acts. This has been achieved through adherence to well-researched and effective design solutions, innovative and creative product design coupled with robust manufacturing standards.
Research documentation can be found on the SBD website at: https://www.securedbydesign.com
South Wales Police would ask that Designing Out Crime Officers are consulted to work in partnership with the Vale of Glamorgan Council to reduce the carbon emissions through building to Secured by Design Standards.
Policy 12 - Regional Connectivity
A feasibility study for a new station at St Athan was completed in 2022, which identified four potential site locations for a new station to the south of St Athan.
South Wales Police Recommendations:
• SP10 – Sustainable transport - Ensuring that the design of new developments encourage walking, cycling and public transport use as alternatives to private car use, as well as encouraging options such as mobility hubs and shared car use – South Wales Police Traffic Management Department should be consulted to ensure that sustainable transport links are safe. If these links are rail, then the British Transport Police Designing out crime officer should be contacted at the pre planning stage.
• SP16/CC1 – Net zero carbon developments: pre application consultation from South Wales Police and all new developments to meet Secured by Design.
• CI1/CC1/ SP19 – Open Space Provision: Areas of open space will normally be required to be provided on-site as part of new development proposals. Where it is not practical to make provision on-site, appropriate off-site provision or financial contributions for improvements to existing facilities will be required in lieu of on-site play, outdoor sports provision, or amenity greenspace.
• DNP7 – DARK SKIES: Secured by Design can assist with ensuring that the built environment in all forms, is designed to reduce the opportunity of Violence Against Women and Girls (VAWG) and contribute to such places feeling safe, to live, work and socialise. South Wales Police would ask that Designing Out Crime Officers are involved at the pre planning stage with the Highways Department at The Vale of Glamorgan Council and developer to discuss and be able to make recommendations in relation to lighting.
Cefnogi
1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd
ID sylw: 6646
Derbyniwyd: 11/03/2026
Respondent ID: 692
Ymatebydd: Natural Resources Wales (NRW)
We welcome Policy DNP7 of the deposit plan, which recognises the importance of preserving the natural darkness of the night sky and minimising light pollution, which we consider to be important in limiting adverse impacts upon local biodiversity and ecological
connectivity.
Thank you for consulting Natural Resources Wales (NRW) on the Vale of Glamorgan Replacement Local Development Plan (RLDP) Deposit Plan, which we received on 28 January 2026.
We have reviewed the deposit plan and published documents and have recommendations on matters relating to coherence and consistency. We advise these are addressed prior to submission of the RLDP.
1. Summary
We welcome that the Vale of Glamorgan Council has declared a ‘nature emergency’ and in 2021 committed to a target of no net loss of biodiversity in the Vale of Glamorgan. The deposit plan takes this a step further through its vision, objectives and policies in seeking
the achievement of net biodiversity benefit. We also welcome the recognition within the deposit plan and supporting documents that additional growth within the Vale has the potential to lead to negative effects on nationally and locally designated biodiversity. We
appreciate that the deposit plan’s policies seek to mitigate against these potential adverse effects with detailed wording and requirements.
However, we consider that the deposit plan would benefit from more specific mention of designated conservation sites especially where these are related to specific allocations and their associated policies. We note this issue was raised within the Integrated Sustainability Assessment (ISA) (see Section 2 below) however we do not see this recommendation properly reflected within the deposit plan itself. We consider this is a gap that should be addressed to ensure clarity within the policy requirements for any future planning applications.
General Approach to Designated Sites
In line with our role in development planning and our consultation remit, we advise that where new development may occur within or be likely to affect statutory designated sites including Special Areas of Conservation (SAC), Special Protection Areas (SPA), Sites of Special Scientific Interest (SSSI), National Nature Reserves (NNR) and Marine Conservation Zones (MCZ) this could be more clearly identified as a key consideration especially with respect to site allocations (housing and employment). We consider that the issue of avoiding or mitigating potential impacts and utilising opportunities for supporting and enhancing these sites (as noted by para 6.401 of the deposit plan) could have more substantial recognition across the deposit plan and its supporting documents. This would improve the clarity of approach.
We have furthermore noted that Policy SP20 (Biodiversity and Ecosystem Resilience) currently excludes specific mention of designated sites (although it does refer to protected species and habitats) and we suggest that this is addressed – our comments on SP20 are set out in Section 3 of this letter.
By across the plan, we mean there is scope to include mention of relevant statutorily designated sites within the constraints text for the sites listed in Appendix B of document BP44 Infrastructure Delivery Plan (perhaps summarising in line with the approach taken to the Historic Environment Record) and within document BP32A Green Infrastructure Assessment of Key Sites, evidence which can then be reflected as appropriate in Key Sites Policies (HG1 KS1 to KS5) to inform their master planning. The Preliminary Ecological Appraisals already undertaken for Key Sites (Key Site Supporting Information) would appear to hold relevant information in this respect.
We note that document BP32A has a useful general paragraph on biodiversity assets at paras 3.7-3.8 linked to the evidence collated in the Green Infrastructure Assessment (GIA). In short, where designated sites are identified in proximity to allocated sites it would be
helpful to make clear reference to them in a consistent manner. This would bring the deposit plan more fully into alignment with the ISA findings. For any employment sites
within proximity of designated sites, we consider that the employment background paper BP12A could potentially be updated to similar effect.
With reference to omissions on this matter, we refer you to our comments on sites set out in Section 4 of this letter, including sites KS1, HG1 (1), SP14 1. and SP14 4.
Overall, we consider that the recognition of designated sites appears somewhat inconsistent in the deposit plan, although we recognise that much of this is done by the
Green Infrastructure Strategy (GIS) which incorporates the GIA.
It may be that Policy SP20 (please see our suggested amendments in Section 3 of this letter) together with addressing the meaning of “areas of high ecological value” will also go some way towards resolving the points we raise.
Master Planning
We welcome the illustrative master plans included in the deposit plan but would caveat that at the detailed stages schemes must be able to adapt, where necessary, to site
specific environmental constraints (including protected sites, species and habitats), for example in response to updated ecological appraisals or detailed species surveys.
Designs need to be flexible enough to ensure compliance with the stepwise approach (avoid, minimise, mitigate) in achieving Net Biodiversity Benefit (NBB) and improving the resilience of ecosystems as required by Planning Policy Wales, edition 12 (PPW12) and Policy 9 of Future Wales, the National Plan. We note the plan has good reference to this within Policy SP20 and supporting paragraph 6.405, thus enabling thorough consideration
at the project/planning application level and in master planning.
Please see our detailed site-specific comments in Section 4 in order to consider where our comments may lead to adjustments in master plans. For example, the species protection issues we highlight with regard to KS3 at Readers Way, Rhoose.
Strategic Opportunity at Bro Tathan
In addition to the above points, we advise that the Bro Tathan area of the Vale includes a number of different allocations and is already known as an important ecological area for great crested newts (GCN) and dormice, in particular. Given the commitments already
made under previous planning applications at the site and the necessary requirement for future biodiversity provisions, we advise a more strategic overview of the area should be considered and either set out within the deposit plan or secured within an updated GIS.
This will ensure that development in the area:
• does not cause detriment to the maintenance of the favourable conservation status of protected species;
• results in green spaces and infrastructure that is meaningfully spatially connected and sufficient in size.
Overall, we consider piecemeal development of the St Athan area will not lead to effective conservation delivery and will make the planning process less efficient at project level.
Areas of High Ecological Value
As previously noted within our preferred strategy response (Ref: CAS-244275-Q4F4, dated: 14th February 2024), the deposit plan continues to make reference to avoiding
areas of ‘High Ecological Value’ (criterion 1 of SP20). We have not been able to establish where these areas are or how their ecological value is being determined. We consider this issue needs to be clarified and ideally a definition provided.
2. Integrated Sustainability Assessment (ISA)
With regards to Section 9.9 of the ISA, we agree that additional growth in the Vale has the potential to lead to negative effects on nationally and locally designated biodiversity. The ISA concludes that the housing-specific policies set out within the deposit plan work well to
mitigate the potential adverse effects, through design stipulations and policy inclusions.
The ISA then goes on to recommend that Key Site policies are updated, where appropriate, to reference specific designated sites which they are in proximity to, in
order to help establish appropriate protection and/or enhancement measures.
We agree with these recommendations and would go further in advising that all allocations and their associated policies should reference specific designated sites relevant to that site. For instance, we would advise Barry Woodlands SSSI and Walters Farm SSSI is identified in relation to Key Site 1 – Land at North West of Barry, and Barry Woodlands SSSI should also be identified for Housing Allocation HG1 (1) Land to the West of
Pencoedtre Lane. Please refer to our site-specific comments in Section 4 below.
3. Plan and Policy Wording
Strategic Policies
Strategic Policy SP19 – Green Infrastructure
We welcome that the GIS and GIA has informed the master planning of the Key Site allocations (6.395). To ensure this approach is carried forward for other development proposals, we consider there should be a stronger “policy hook” within Policy SP19 to link the content and evidence of the GI work to the policy and its influence on decision-making. Without this we consider there may be a risk of a policy gap/mismatch when determining planning applications.
This could be resolved by a new criterion such as:
“the provision of green infrastructure must have regard to any adopted or emerging guidance including the Green Infrastructure Strategy/Green Infrastructure Assessment
(and the Assets listed therein), and Green Infrastructure (Action) Plan for the Vale.”
To strengthen Policy SP19 we also recommend an addition to the wording of criterion 2 to read:
“Protect and enhance connectivity between existing green infrastructure assets and be planned wherever possible to positively support areas of high ecological value”.
We furthermore note that criterion 3 of SP19 refers to achieving net benefit for biodiversity whilst the policy overall seeks to provide, protect and enhance high quality multi-functional green infrastructure. We have previously commented that multi-functional green spaces may not always be compatible with biodiversity. It should be recognised that multifunctional uses of space can be to the detriment of the natural environment and so must be carefully considered. We recommend that paragraph 6.397 wording is updated to reflect this potential conflict so that NBB required by PPW (and as promoted by para 6.396 together with Policy SP20) is able to be prioritised and not compromised.
This point could also be raised under Policy SP4 Placemaking – at para 6.32. It should not be assumed that multifunctional spaces will also be delivering for nature in every situation and in some cases separate provision of spaces to meet biodiversity goals will be essential.
Paragraph 6.401 is welcomed regarding the opportunities that exist for the protection, maintenance and further enhancement of green infrastructure assets.
Strategic Policy 20 (SP20) – Biodiversity and Ecosystem Resilience
We welcome the inclusion of SP20 which recognises the importance of natural assets and aims to protect these. We have made comments regarding the term “high ecological value” in our Summary section at the start of this letter.
We also note that whilst reference is made to sites and areas of European, national and local importance (para. 6.402), this is not distinctly carried through within SP20 or within a specific detailed policy in the deposit plan. We advise that a more detailed policy for the Natural Environment (similar to DNP4 for the Historic Environment) could be included within the deposit plan and this should include reference to the protection of statutorily designated sites. Alternatively, SP20 itself could be updated to include reference to these in a similar manner to the approach taken to non-statutory designated sites provided by criterion 5 of SP20. We consider this would strengthen the deposit plan’s alignment to
section 6.4.3 of PPW12. This issue is also reflected in our feedback to the ISA as set out in Section 2.
By adding a detailed policy for the wider protection of the natural environment, there is scope to ensure a clearer message within the deposit plan regarding the need for natural resources (including land, air, water and soils) in the Vale to be protected for themselves and the essential ecosystem services they deliver. This is opposed to merely preventing pollution (deposit plan Policy DNP5). Taking such an approach would enable an
opportunity to add the consideration of Sustainable Management of Natural Resources (SMNR) into the plan policy framework rather than confining this to the deposit plan context (para 2.11) and the policy context of the GIS (page 53).
We note that Policy CC4: Renewable, Low and Zero Carbon Energy Generation is more distinct in seeking to safeguard a range of assets (including nature conservation interests and soil conservation interests) and we consider a similar policy approach may be useful
for all development proposals. We also suggest that the placemaking strategic policy (Policy SP4) could be altered in order to highlight the Natural Environment alongside its
current reference to the Historic Environment. We note that placemaking principles (Figure 11 - Identity) includes the need for development to respond to natural physical attributes of the site. This is an issue is linked to our site-specific comments (Section 4 below) where we cite, for example, the need to buffer woodlands, hedgerows and watercourses and preserve linear corridors.
Ensuring an SMNR approach will impact positively on the ground to safeguard and improve ecological networks and protect and enhance ecosystems, essential to meeting
the nature emergency. Topics we draw your attention to include river restoration where, in particular, the removal/remediation of physical modifications can make a significant impact upon water quality. The GIS provides scope to capture various projects and wider initiatives, including those based on catchment scale improvements and we welcome the opportunity to be continually involved in this work. We note and welcome the recognition of
nature-based solutions within Policies SP16, SP19 and SP20 and in detailed Policy CC6.
With regards to natural assets and water resources, we consider that specific reference to water quality is lacking within the strategic and/or detailed policies. Whilst we note that water quality is mentioned within criterion 9 of Policy SP16, we consider the deposit plan should include more direct reference to the Water Framework Directive. We consider there is an opportunity for SP20 to be updated to ensure developments protect water quality and quantity. Alternatively, as mentioned above, this could fit within a detailed policy for the protection of the natural environment.
As a minor point, please note that the South Central Area Statement is not hyphenated (para 2.10 and 2.11). Please note also that, referring to paragraph 6.404 and 6.405, the
requirements for developments to demonstrate NBB is based on PPW12, rather than The Environment (Wales) Act 2016.
Detailed Policies
Infrastructure
Whilst we note that the infrastructure requirements (such as sewerage capacity) have been investigated for certain key sites within the deposit plan, we consider there could be scope for a detailed policy to cover infrastructure requirements for all development.
Policy DNP7
We welcome Policy DNP7 of the deposit plan, which recognises the importance of preserving the natural darkness of the night sky and minimising light pollution, which we consider to be important in limiting adverse impacts upon local biodiversity and ecological
connectivity.
Policy DPN8
Please refer to comments made with regards to this policy under Section 6: Habitats Regulation Assessment (HRA).
Policy HG5 - Affordable Housing Exception Sites
We advise that, particularly given these sites are permissible outside of settlements and could be in countryside locations, criterion 6 should be amended to:
“There is no loss of land with significant recreational, amenity, agricultural, ecological or natural heritage value”.
EMP1 – Employment Regeneration Opportunity Areas
We note that the Former Aberthaw Power Station has been identified as an employment regeneration opportunity area. There are otter and water vole records on the site and we are aware of GCN records within the local area. We would advise against the inclusion of
the Aberthaw Nature Reserve within the allocation and advise that any application on the site would need to be supported by up-to-date ecological survey information and
appropriate conservation measures. Given the nature of the site, future applications will also need to be supported by appropriate land contamination investigations.
CC3 – Renewable Energy Local Search Areas
This policy identifies several sites where the potential for wind and solar development are the greatest (known as ‘search areas’). There are significant search areas located between Llantrithyd and St Hilary; no ecological information has been provided for these search areas, however given the records for GCN, water vole and otter local to these areas, it is likely that provision in the form of suitable habitats will need to be made for these species.
This could be substantial in scale, however without further ecological information we cannot advise further at this time. Notwithstanding, given the scale of the search area in this location and the likely ecological impacts, we advise that this area would benefit from spatial planning of biodiversity provision, at a greater than individual site scale.
Paragraph 2.81 – The Vale Nature Recovery Action Plan
We note reference to ‘6 broad habitat types’ including Woodland, Freshwater, Grassland, Coastal, Agriculture and Urban. We suggest this is amended to ‘6 broad ecosystems’ to reflect correct terminology and the State of Natural Resources Report 2025.
4. Strategic Sites
Overview
We previously provided detailed comments on the RLDP’s Strategic Sites, as set out in our response ref: CAS-234819-C1V3, dated 4th October 2023, which we refer you to. We welcome the additional information provided and note the inclusion of Green Infrastructure
Strategies for each of the Key Sites. However, we note that these do not include reference to protected species specifically and as a result we are unable to confirm that the provision for each site is appropriate. We observe that the road infrastructure for many of these sites severs woodlands and other substantial linear corridors. We advise that such sites are designed to minimise fragmentation in the landscape and advise that the road layouts and consequent severance is re-visited.
KS4 and KS5 are located within the vicinity of St Athan. This area is important for (and we are aware of) multiple records of GCN and dormice. Some of the area is already secured as compensation for impacts on these species associated with previous developments. We advise that the wider St Athan area is subject to spatial planning of biodiversity provision at a greater than individual site scale (as we have referenced in the Section 1 of this letter), in order to determine that:
• It does not cause detriment to the maintenance of the favourable conservation status of both GCN and dormice (strategic conservation plans should be established for both species);
• To ensure that green spaces and infrastructure are meaningfully spatially connected and sufficient in size;
We consider piecemeal development of these areas will not lead to effective conservation delivery and will cause the delivery of these sites to be less effective during the planning process.
Spatial Planning of Biodiversity
A masterplan or spatial biodiversity or GI plan should demonstrate the retention, provision and enhancement of essential areas for protected species. It should ensure that individual site-based habitat provisions are not designed in isolation but considered in association with nearby sites to demonstrate how habitat connectivity and resilience will be provided both across the site and to the wider landscape. Note that functional separation of public
open space and areas for biodiversity compensation may be required. Suitable buffers will need to be applied to any woodland and retained or created habitats on site. A sensitive lighting strategy will also likely be required for these sites. This point was raised previously during our review of the strategic candidate sites (ref: CAS-234819-C1V3, dated 4th October 2023).
Updated Surveys and Appropriate Buffer Zones
Further to the above comments, we welcome reference within the Infrastructure Delivery Plan for the requirement for updated ecological surveys and appropriate buffer zones to watercourses and retained habitat features for KS1 and KS2. Given the various ecological
constraints for each key site, we consider this advice should be included for each of the key sites.
Site Specific Comments
KS1 – Land at North West Barry
Protected Species – Dormice and bats are present on site. We advise that the masterplan is informed by surveys to ensure that biodiversity interests are maintained and enhanced. The site may require some areas to be retained an/or provision for habitats to support them. Dark areas and/or bespoke lighting scheme may also be required at project stage.
Protected Sites – The site is located in close proximity to Walters Farm and Barry Woodlands SSSI. As raised in our previous responses (CAS-234819-C1V3, dated: 4th
October 2023 and CAS-276923-N7H6, dated 17th April 2025), we have some concerns with the potential for increased and inappropriate use of the protected sites through recreational activities. We welcome that requirements have been detailed within HG1 KS1
under Green Infrastructure, Recreation Spaces and Biodiversity, which includes reference to emerging guidance for Suitable Alternate Natural Greenspace (SANG).
KS2 – North of Dinas Powys, off Cardiff Road
Protected Species – We note the supporting Preliminary Ecological Appraisal (PEA) (13th September 2022) which identifies potential for this site to support GCN, dormouse and bats. In the absence of species specific surveys, we are unable to advise whether the housing number aspirations for the site are realistic. We advise the scheme is designed to minimise severance of ecological corridors.
KS3 – Land at Readers Way
Protected Species – GCN are known to be present on this site (Readers Way Pond). The current masterplan indicates that the pond will be surrounded by built development and therefore built upon much of the terrestrial habitat which supports this pond. It is essential
that the masterplan provides a wide corridor from this pond to the wider countryside, other than via the closely managed grassland at Cardiff Airport. Any masterplan should make provision for this and any loss of habitat should be compensated for.
KS4 – Land at Church Farm
Protected Species - There are records of dormouse and GCN in the wider area. However, the supporting PEA indicates no direct impacts on the latter of the species. There appears to be extensive green space proposed in the illustrative masterplan, which we support.
KS5 – Land to the West of St Athan
Protected Species - The St Athan area is important area for GCN and dormouse. We would generally concur with the lower risk assessed for these species in association with this site. However, this is a substantial site and this and other sites in the St Athan area would benefit from spatial planning of biodiversity provision at a greater scale as reaffirmed elsewhere in this response.
5. Housing And Employment Allocations
Housing Allocations
HG1 (1) Land to the West of Pencoedtre Lane
Protected Sites: The site is within close proximity (200m) to Barry Woodlands Site of Special Scientific Interest (SSSI) and there is a risk from increased recreational use as a result of residential development, which could lead to impacts on the SSSI. Green space design must consider any emerging guidance for SANG to reduce recreational pressure on adjacent sites of biodiversity importance.
HG1 (2) Land at the Mole
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary European Marine Site (EMS). A HRA at project level will therefore be required.
HG1 (3) Land at Hayes Lane
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
HG1 (4) Land at Neptune Road
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.
HG1 (5) Land between the Northern Access Road and Eglwys Brewis Road (Site C - Central Parcel)
Flood Risk: The site is located partially within Flood Zone 2 and 3 for Rivers, with the southern area of the site located within Flood Zone 3. We refer you to Sections 10.20 and 10.21 of TAN 15, which state that highly vulnerable development in Zone 3 should be avoided. Notwithstanding, we acknowledge that at masterplanning stage, there is scope to locate residential development away from areas of flood risk. We also welcome that
Appendix B of your Infrastructure Delivery Plan notes the requirement for an FCA at project level for this site.
Watercourse: Boverton Brook (Main River) runs through the site and any development will need to ensure no adverse impacts to the watercourse with appropriate buffers and design considerations.
HG1 (6) Land adjoining St Athan Road
Land Contamination: The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Rural Affordable Housing Led Sites
HG4 (1) Land to the East of Colwinston
Land Contamination: The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Major Employment Allocations
SP14 (1) Land east of Cardiff Airport, Rhoose
Protected Species and Protected Sites: The site is within close proximity (360m) of Barry Woodlands SSSI and there also appears to be significant potential for the site to support dormouse, GCN, otter and water vole. There are large areas of semi-natural habitats associated with this site including woodland, mature hedgerow and watercourses. These should be retained and significantly buffered from development. Connectivity between the
site and the wider environment should also be maintained. It is therefore currently not possible to advise whether the full aspirations of the site could be fulfilled.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (2) Land south of Port Road (Model Farm), Rhoose
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (3) Bro Tathan Aerospace and Business Park
Protected Species: The site is located within an important area for GCN and dormice. As mentioned, this area would benefit from spatial planning of biodiversity provision at a
greater scale to better inform allocation.
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (4) Land to the South of Junction 34 of the M4, Hensol
Protected Sites: The site is located directly adjacent to Ely Valley SSSI. Given the biodiversity interest at the site, previous applications at the site include planning
commitments to conserve and enhance grasslands habitats on the site. These commitments have not yet materialised and the requirement for these provisions should be noted within the LDP.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.
Local Employment Allocations
SP14 (5) Atlantic Trading Estate, Barry
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.
SP14 (6) Windmill Park, Hayes Road, Barry
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination. The site is located over a principal aquifer. Any development would need to consider the hydrological setting of the site and vulnerability of pollution.
Flood Risk: The site is located partially within Flood Zone 3 for Sea. We advise that an FCA will be required at project level to determine any flood risk implications at the site.
Marine: An adjacent watercourse forms a hydrological link to the Severn Estuary EMS. A HRA at project level will therefore be required.
SP14 (7) Vale Business Park, Llandow
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
SP14 (8) Land at Llandow Trading Estate
Land Contamination: Given previous land use at site, a Preliminary Risk Assessment would be required at planning application stage to determine risk of land contamination.
6. Habitats Regulations Assessment (HRA)
Marine and Coastal Physical Processes
Coastal Squeeze
We note that coastal squeeze has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is that it “is unlikely that the Vale of Glamorgan RLDP will allocate many developments on
greenfield sites adjoining the estuary”.
We also note that Policy CC6 specifically relates to Coastal Defences and Shoreline Management, with reference to the Shoreline Management Plans. We recommend the use of NRW’s Assessment of Coastal Squeeze at the project level for anyone proposing to
undertake works to coastal structures.
Loss of Functionally Linked Habitat
As part of the Preferred Strategy consultation, we advised that consideration was given to potential impacts on migratory fish features of the Severn Estuary EMS. In particular, we referenced the River Ely and its tributaries providing supporting habitat for essential life cycle processes of some or all the diadromous fish species.
Within the deposit plan HRA, it is noted that likely significant effects to the migratory fish features of the Severn Estuary EMS has been ruled out, as none of the sites allocated in the RLDP lie in close proximity to the River Ely and connected watercourses. We therefore
agree with this conclusion.
In relation to bird features, Table 8 of the Appropriate Assessment identifies many key sites and allocations with high to medium potential for functional linkage to the Severn Estuary EMS. We note that loss of functionally linked habitat has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational
Pressure’ within the deposit plan.
Policy DNP8
We advise that clarification is needed in relation to this policy, as while we welcome the supporting text regarding functionally linked land outlined in paragraph 6.76 of the HRA, the policy is mainly focused on recreational pressure and is titled as such. We also note a discrepancy between the policy wording in paragraph 6.76 and Policy DNP8 in the deposit plan itself.
Visual and Noise Disturbance (During Construction)
Within the deposit plan HRA, visual and noise disturbance has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is through the inclusion of recommendations outlined in 6.83 of the HRA to the supporting text of Policy SP20, which we welcome.
We also welcome the recommendation in relation to potential functionally linked land as outlined in paragraph 6.84 of the HRA.
Recreational Pressure
Within the deposit plan HRA, recreational pressure has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. Again, the justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational Pressure’ within the deposit plan, which as above, we advise needs
clarification.
We note that no visitor data has been collected from access points within the Vale of Glamorgan, but we welcome reference to the visitor surveys undertaken by
Monmouthshire and Torfaen, as well as the 2022 visitor survey commissioned by Stroud District Council.
We note that paragraph 6.25 of the HRA states that “three Key Sites and several other housing allocations lie within the 12.6km core recreational catchment that has been
deemed most appropriate for the Severn Estuary SAC/SPA/Ramsar”. However, we also note that Table 6 in the HRA only includes two Key Sites requiring mitigation, with KS3 being omitted. We advise that clarification is needed at the project level as to whether developments are situated within the 12.6km catchment area.
7. Strategic Flood Consequence Assessment (SFCA)
We have reviewed the submitted SFCA and agree with the scope of the assessment made.
We note there is currently an upper catchment Natural Flood Management (NFM) / Nature Based Solutions (NbS) project on the Cadoxton to reduce flood risk to Dinas Powys, Any updated SCFA should have regard to NFM schemes being progressed in their area and
proposals should be clearly outlined in the Development Plan (in accordance with TAN 15 2025).
8. Green Infrastructure Strategy (GIS)
We understand that the published GIS has not been updated to reflect the latest stage of the deposit plan and refers only to the preferred strategy stage (para 2.2.3). We previously provided advice on the Green Infrastructure Assessment (GIA) (re: CAS-252087-F0H1, dated 14th May 2024) which is included within the GIS. We refer you to these comments, noting that the GIS will be kept under continual review (para 1.2.5).