Crynodeb o'r Gynrychiolaeth:

The Infrastructure Plan falls short of detailing the new sewerage infrastructure central to unlocking the development of allocated sites stated in para.i Para. 3.104 mentions SuDS to prevent surface water entering the sewer system, but nothing on WW's strategic plan for local authority schemes to divert existing highway drainage into surface water out of their sewers.

Para.3.105 says the obvious that capacity may not exist within the existing sewerage network, but does not include sewage treatment capacity and does not specify where it's lacking. There's a comment for NW Barry that pumping capacity "may"not exist.

Para.3.108 says capacity constraints at treatment works and improvements as being in the current AMP or not, so why not be specific on the programme to 2030 ?

We see no mention of the Vale's Bathing beaches (several new ones) and policy to ensure sewage discharges do not undermine attaining Bathing Water standards; does this issue not belong in the RLDP, setting out divided responsibilities of VoG, NRW and DCWW (cf. Watchtower and Ogmore-by-Sea beaches closed 2024,5)?