BP44 Cynllun Seilwaith

Yn dangos sylwadau a ffurflenni 1 i 3 o 3

Sylw

2 Dogfennau Ategol

ID sylw: 6645

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

Infrastructure
Whilst we note that the infrastructure requirements (such as sewerage capacity) have been investigated for certain key sites within the deposit plan, we consider there could be scope for a detailed policy to cover infrastructure requirements for all development.

Atodiadau:

Gwrthwynebu

2 Dogfennau Ategol

ID sylw: 6653

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

We welcome reference within the Infrastructure Delivery
Plan for the requirement for updated ecological surveys and appropriate buffer zones to watercourses and retained habitat features for KS1 and KS2. Given the various ecological constraints for each key site, we consider this advice should be included for each of the key sites.

Atodiadau:

Gwrthwynebu

2 Dogfennau Ategol

ID sylw: 6799

Derbyniwyd: 06/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

The Infrastructure Plan falls short of detailing the new sewerage infrastructure central to unlocking the development of allocated sites stated in para.i Para. 3.104 mentions SuDS to prevent surface water entering the sewer system, but nothing on WW's strategic plan for local authority schemes to divert existing highway drainage into surface water out of their sewers.

Para.3.105 says the obvious that capacity may not exist within the existing sewerage network, but does not include sewage treatment capacity and does not specify where it's lacking. There's a comment for NW Barry that pumping capacity "may"not exist.

Para.3.108 says capacity constraints at treatment works and improvements as being in the current AMP or not, so why not be specific on the programme to 2030 ?

We see no mention of the Vale's Bathing beaches (several new ones) and policy to ensure sewage discharges do not undermine attaining Bathing Water standards; does this issue not belong in the RLDP, setting out divided responsibilities of VoG, NRW and DCWW (cf. Watchtower and Ogmore-by-Sea beaches closed 2024,5)?

Atodiadau: