Crynodeb o'r Gynrychiolaeth:

Deposit Plan Appendix 2 – Infrastructure Delivery Plan

A number of amendments to the text are requested in regard to the infrastructure requirements for KS1
North West Barry as set out within the Infrastructure Delivery Plan at Appendix 2 of the Deposit LDP.

Within the ‘Key site issues and constraints’ section of the Infrastructure Requirements table, the following amendments to the text are considered necessary:

• Proportionate access and junction arrangements on to the A4226 and a financial contribution
towards strategic highway network enhancements (in the context of the impact of wider committed developments on the strategic highway network).

As set out above, it is important that the required financial contribution towards strategic highway network enhancements is proportionate to the scale of the North West Barry development, and that additional committed developments, which would have a greater impact on the strategic highway network, are considered in the round.

• Previous desk-based assessment and site visits identified that development would have a major impact on five features (?), including important hedgerows which form historic boundaries. Archaeological features were also identified.

The above bullet point requires clarification as to the ‘five features’ which the development would have a ‘major impact’ upon. It should be noted that masterplanning work to date has been informed by extensive survey and assessment work which ensures that the proposed development is capable of addressing all constraints.
Within the section of the table where ‘broad costs’ of key infrastructure requirements are outlined, it is considered that the following amendments to the text are necessary:

• Education – Estimated Cost (£TBC) - DELETE COST CITED

It is considered that an estimated cost for education contributions cannot be specified at this stage, as the contribution will be directly related to current school capacity figures at the time of the Planning Application, with school capacities being fluid and subject to change. As such, the ‘circa’ figure should be removed from the text and replaced with ‘TBC’ at this point.

• A proportionate contribution towards on-site improvements to the capacity and flow of Weycock
Cross roundabout and other junctions on the strategic highways network where necessary (in the context of the impact of wider committed developments on the strategic highway network).

• VOGC to deliver improvements to junctions on the Strategic Highways Network using s106 contributions (from the North West Barry Key Site and other relevant commitments) .

As set out above, it is important that the required financial contribution towards strategic highway network enhancements is proportionate to the scale of the North West Barry development.

• Contribution towards off-site sustainable transport measures in the area as necessary and related
to the Key Site.

The requirement for a contribution towards off-site measures ‘in the area’ is not specific enough to provide certainty for the developer, and it will be important to ensure that any off-site measures are necessary and directly related to the North West Barry development.


Community Facilities – (£TBC) DELETE COST CITED
It is considered that an estimated cost for community facility contributions cannot be specified at this
stage – no background calculations are provided to evidence that this estimate is robust. As such, the
‘circa’ figure should be removed from the text and replaced with ‘TBC’ at this point.