CI1 – DARPARIAETH MANNAU AGORED

ID sylw: 6039

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

The proposed 62.2 m² per dwelling requirement is overly prescriptive and not aligned with Field in Trust’s (FiT’s) methodology. When combined with the wider cumulative policy burdens of the RLDP, such an approach has the potential to impact development viability and reduce delivery.

Policy CI1 also requires an ‘Open Space Strategy’ to be submitted for all housing developments that meet the relevant thresholds. In many instances, it is appropriate for the provision of open space within a scheme to be addressed through a Design and Access Statement and / or Green Infrastructure Statement.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP16 - MESURAU LLINIARU AC ADDASU I NEWID HINSAWDD

ID sylw: 6044

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP16 requires all development proposals to address climate change causes, but it is impractical to meet all these requirements at the outline planning stage. Some information can only be provided at the detailed stage. Certain requirements, such as optimising energy supply and district heat networks, may be unachievable in many new residential developments. Furthermore, care needs to be taken to ensure that any additional decarbonisation policy aspirations, especially for affordable housing-led schemes, are carefully considered in terms of overall viability.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

CC1 - DATBLYGIADAU CARBON SERO NET PRESWYL GWEITHREDOL

ID sylw: 6047

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy CC1 requires an Energy Report at outline planning stage. It would not be possible to provide all of the information required to demonstrate compliance with Policy CC1 at the outline planning application stage and that the information requirements for Policy CC1 can only be expected to be provided at detailed application stage. Space heating demand should remain within Building Regulations, not local policy, to avoid inconsistency. Clarification is needed on measurement points and whether Policy CC1 applies only to regulated energy use. Flexibility should be included if Building Regulations change. Impact on development viability, including AH must be assessed.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

CC2 - RHAGDYBIAETH YN ERBYN DYMCHWEL

ID sylw: 6048

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

As drafted, Policy CC2 sets a presumption against demolition. This could have serious impacts on delivery timescales for residential sites with, for example, unused or derelict farm buildings or where a dwelling needs to be demolished for access purposes. This could have implications on the housing delivery trajectory as set out in the Council’s Housing Land Supply and Housing Trajectory Evidence Paper.

Cefnogi

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP20 - BIOAMRYWIAETH A GWYDNWCH ECOSYSTEMAU

ID sylw: 6049

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

The proportionate approach to biodiversity mitigation and compensation, that provides allowance for planning obligations towards off-site habitat improvement and maintenance is consistent with Chapter 6 of PPW and therefore meets the first test of soundness (Does the Plan fit?). It is essential that options are retained to provide biodiversity mitigation off site as well as on site.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP6 - GOFYNIAD TAI

ID sylw: 6054

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

The RLDP's proposed housing target of 526 dwellings per year over ten years is unambitious, as recent delivery exceeded this figure outside pandemic years. The target is based on past averages, which include periods of low delivery, and ignores demographic trends and unmet needs. Given the Vale of Glamorgan's role within the National Growth Area in Future Wales, maintaining historic delivery rates does not reflect its strategic importance or the national policy emphasis on growth, making the current target insufficient and not aligned with its designated growth role.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP6 - GOFYNIAD TAI

ID sylw: 6057

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP1's target of 7,890 dwellings, including 3,070 affordable homes, is insufficient to meet current and projected housing needs in VoG, which are estimated to require over 10,000 dwellings to address demographic growth and backlog unmet needs. The proposed flexibility allowance of 9.8% should be increased to 15-20% (like in Monmouthshire and Swansea) to achieve the ambitious build rate set out in the Housing Trajectory. Policy SP1 does not adequately account for the actual demand, particularly for affordable housing, which is significantly under-provided relative to identified needs.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP6 - GOFYNIAD TAI

ID sylw: 6060

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP6 plans for 8,660 homes comprising a 9.8% flexibility allowance on a target of 7,890. This should be increased to 15-20% (like in Monmouthshire and Swansea) to meet the ambitious build rate set out in the Housing Trajectory. Household projections indicate a 22% increase from 57,676 to 67,299 by 2036, requiring approximately 10,008 dwellings, which exceeds the current target in the RLDP. Policy SP1 and SP6 do not sufficiently address unmet affordable housing needs as the 2023 LHMA identifies a need for 1,075 affordable dpa over the next 5-years based on principal projections or 1,114 based on RLDP projections.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

HG1 - HOUSING ALLOCATIONS

ID sylw: 6069

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Cowbridge, as a Service Centre Settlement, is underrepresented in housing allocations in Policy HG1, with only 105 units allocated and no major land bank sites. As such, the housing allocations in Policy HG1 do not align with Cowbridge's ranking as a Tier 2 settlement in Policy SP2. This under-provision limits Cowbridge’s ability to meet housing needs, especially affordable housing, despite its importance within the hierarchy. An additional site at Land at Primrose Hill, capable of up to 220 dwellings, could help address this gap and support the RLDP’s growth strategy.

Gwrthwynebu

1 Ymgynghoriad ar Cynllun Datblygu Lleol Newydd

SP7 – DARPARIAETH TAI FFORDDIADWY

ID sylw: 6073

Derbyniwyd: 11/03/2026

Respondent ID: 2669

Ymatebydd: Barratt Redrow Homes

Asiant : Lichfields

Cadarn? Nac Ydi

Effeithiau ar y Gymraeg:

N/A

Crynodeb o'r Gynrychiolaeth:

Policy SP7 aims to deliver 3,070 affordable homes during the RLDP period, requiring a mix informed by the Council's evidence. Policy SP7 does not allow flexibility and viability considerations which are essential, especially given the Council's ambitious policies for net zero homes. Policy SP8 endorses site-specific negotiations and viability assessments, allowing flexibility in affordable housing mix. Thus, SP7 and SP8 as drafted currently contradict one another. This is especially important for the affordable led schemes as the housing mix (affordable and market) can have a big impact on the viability of schemes given that they have more onerous planning obligations.