Strategaeth Seilwaith Gwyrdd Bro Morgannwg

Yn dangos sylwadau a ffurflenni 1 i 3 o 3

Gwrthwynebu

6 Strategaeth Seilwaith Gwyrdd

ID sylw: 4792

Derbyniwyd: 12/02/2026

Respondent ID: 698

Ymatebydd: Ms Maxine Levett

Crynodeb o'r Gynrychiolaeth:

The RLDP’s Green Infrastructure (GI) Strategy appears to overlook several significant local biodiversity assets:
• Aberthaw Biodiversity Area (Council owned and agreed for retention).
An area with clear potential for designation such as Local Nature Reserve (LNR).
• Cadoxton Ponds Nature Reserve, a major ecological asset not reflected in GI mapping.
[gov.uk]
• Other sites already being considered by Scrutiny for LNR status (e.g., Barry Old Harbour, Rhoose Point), demonstrating an active Council interest in expanding nature designations.
These omissions raise questions about:
• Whether the GI Strategy has adequately captured local ecological opportunities;
• Who authored and quality assured the document, given factual omissions (e.g., mis counting bathing beaches) and lack of reference to key local sites;
• Whether biodiversity “net gain” claims are being interpreted proportionately, rather than reduced to minimal measures such as bird boxes.
Welsh Government expects the RLDP to be evidence led and based on a robust environmental baseline.
Could you confirm:
• Whether Aberthaw, Cadoxton Ponds, and related sites will be added to the GI evidence base;
• Who prepared and signed off the current GI content;
• How biodiversity requirements will be strengthened to reflect site specific ecological value.

Atodiadau:

Gwrthwynebu

6 Strategaeth Seilwaith Gwyrdd

ID sylw: 6255

Derbyniwyd: 11/03/2026

Respondent ID: 708

Ymatebydd: Barry & Vale Friends of the Earth

Asiant : Barry & Vale Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

This document falls well short of professional standards, with errors and omissions.
It should have covered all wildlife sites
The CBA body who wrote it are unidentified, with all details blacked out. They make no declaration of professional standards, so cannot be taken to be committed to accuracy and truthfulness as the WGovt requires of consultants.
At the public session, the LDP officer said one of his colleagues would have checked it to get the VoG badging. That can’t apply to all as any local resident would have know of error (number of bathing beaches) and omissions.
SINCs are mentioned, that there was a review but no report of the results
LNRs are mentioned but not their statutory designation and linkage with the 1981 WCA |(as amended) and the Section 7 responsibility of LAs under EnvWalesAct. No mention that management policies for LNRs is required in LDPs
No mention of the scope and need for extending LNRs with Barry Old Harbour, Rhoose Point, Cadoxton Ponds and Aberthaw nature reserve designations being raised. Indeed the last two are not listed though most important nature conservation sites, one owned by Dow and the other by CCR.
Bathing Beaches are mentioned but wrong number and nothing about sewage affecting them and the problems of the LA having to manage them with duties under the Bathing Water Regs.
No mention is made of the Wales Coast path, which VoG manages on behalf of NRW. Gaps in it and proposals to remedy them need listing in the RLWP.
No mention made of the designated “quiet areas” and responsibility of the Council to review and extend them countywide under the Air quality and Soundscapes (Wales) Act.
The worst werror is saying NBB – net biodiversity benefit is required for development. That’s in England, indicating this “consultant” practices there (or is based overseas). In Wales we require biodiversity is enhaced proportionate to scale and nature of the development . the RLDP checker would have been very conscious of this difference. The LPA’s problem is they hang on to the English requirement rather than the Welsh one. Perhps it was one of them who ensured keeping the serious error.
We conclude the GI document is important, so needs to be reasonably accurate. This one won’t do, and should be fully revised to meet professional stands.

Atodiadau:

Cefnogi

6 Strategaeth Seilwaith Gwyrdd

ID sylw: 6676

Derbyniwyd: 11/03/2026

Respondent ID: 692

Ymatebydd: Natural Resources Wales (NRW)

Crynodeb o'r Gynrychiolaeth:

We understand that the published GIS has not been updated to reflect the latest stage of the deposit plan and refers only to the preferred strategy stage (para 2.2.3). We previously provided advice on the Green Infrastructure Assessment (GIA) (re: CAS-252087-F0H1, dated 14th May 2024) which is included within the GIS.

We refer you to these comments, noting that the GIS will be kept under continual review (para 1.2.5). Please note that our State of Natural Resources Report (SoNaRR) is now in its third assessment with SoNaRR 2025 recently published (January 2026).

Atodiadau: