Ty Draw / Tŷ Draw

Yn dangos sylwadau a ffurflenni 1 i 2 o 2

Sylw

4 Safleoedd Ymgeisydd

ID sylw: 6829

Derbyniwyd: 10/03/2026

Respondent ID: 582

Ymatebydd: National Grid Electricity Transmission

Crynodeb o'r Gynrychiolaeth:

This candidate site has NGET assets interacting with it:

ZZB ROUTE: 275kv Overhead Transmission Line route: ABERTHAW - UPPER BOAT 1 and ABERTHAW - UPPER BOAT 2
ZZS ROUTE: 275kv Overhead Transmission Line route: ABERTHAW - CARDIFF EAST – PYLE and ABERTHAW – PYLE

Whilst it is not clear what their future role as part of the Local Plan will be (they do not currently form part of the Proposals Map as published), NGET are keen to highlight these interactions so that, as with Policy EMP1 above, suitable policy wording can be included as part of any future development options on these sites, should they emerge as allocations in the future.

Atodiadau:

Sylw

4 Safleoedd Ymgeisydd

ID sylw: 6832

Derbyniwyd: 10/03/2026

Respondent ID: 582

Ymatebydd: National Grid Electricity Transmission

Crynodeb o'r Gynrychiolaeth:

This candidate site has NGET assets interacting with it:

LL ROUTE: 275kv Overhead Transmission Line route: ABERTHAW – TREMORFA

Whilst it is not clear what their future role as part of the Local Plan will be (they do not currently form part of the Proposals Map as published), NGET are keen to highlight these interactions so that, as with Policy EMP1 above, suitable policy wording can be included as part of any future development options on these sites, should they emerge as allocations in the future.

Atodiadau: