1 Vale of Glamorgan Deposit Replacement Local Development Plan

Search representations

Results for Barratt Redrow Homes search

New search New search

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

MIN1 - DEVELOPMENT IN MINERALS SAFEGUARDING AREAS

Representation ID: 6923

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Barratt Redrow understand the need for a sustainable provision of minerals however object to the continued inclusion of Swn Y Coed, Wenvoe within an area that is designated as a Category 1 Limestone mineral resource.

A Mineral Resource Assessment, undertaken by Wardell Armstrong, was provided as part of the Candidate Site Assessment and considered the proposed development against the four criteria of Policy MG 22 of the current Adopted Local Development Plan and National Policy.

The presence of the mineral resource does not preclude
the allocation and development of the site as any extraction does not accord with the criteria requirements in MIN1. Therefore, the site at Swn Y Coed should be removed from the safeguarding area.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

Dyffryn Basin & ridge slopes;

Representation ID: 6924

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Barratt Redrow object to the continued inclusion of Swn Y Coed within the Dyffryn Basin & Ridge Slopes - 5 Special Landscape Area (SLA) under Policy DNP1.

As highlighted in Background Paper BP28 – Special Landscape Areas, Paragraph 1.8, the Council considers that the SLA as defined in the 2008 ‘Designation of Special Landscape Areas - Final Report’ remain relevant, up-to-date, and based on current best practise and have therefore not undertake a review of the report to inform the emerging Replacement Local Development Plan (RLDP).

Whilst the Authority have not sufficiently updated their evidence base, the site was subject to a detailed review as part of the Candidate Site submission by Soltys Brewester Landscape which highlighted that the site is located on the edge of land subject to Dyffryn Basin and Ridge Slopes SLA. This designation is ‘underpinned’ by LANDMAP Areas St Nicholas and Bonvilston Ridge Slopes, (VLFGLVS614) and St Nicholas and Bonvilston Ridge Crest (VLFGLVS271), both evaluated as High.

However, the vast majority of the designated land will fall outside the visual envelope for the Swn Y Coed site and there will be no change to the key characteristics of the SLA or the LANDMAP areas to the west or to the north of the site boundary.

A noted characteristic of the SLA relates to the prominence of the sloping edge, (i.e. St Nicholas and Bonvilston Ridge Slopes, (VLFGLVS614), within views from Wenvoe Valley to the east.

The visual appraisal establishes that site development has
the potential to partially change the appearance of this edge within available views.

However, opportunities for GI provision within the site including retention and enhancement of the existing boundary hedges and trees which has the potential to minimise any visible change. Furthermore, as illustrated on the submitted masterplan, the existing hedges and field pattern within and around the site will be key structural elements guiding and sub-dividing the development form.

When considered in the context of the extensively wooded nature of the slopes visible to the east, any visible change to valley slope characteristics is likely to be very marginal and visually insignificant within the study area.

Moreover, the illustrative masterplan includes measures that will assist with GI mitigation and enhancement, including SUDs features, accessible landscape buffers and green spaces.

Therefore, it was concluded that from a landscape and visual perspective the site has the ability to suitably incorporate residential development and include GI enhancements, to assist with its visual integration, as a visually appropriate extension to Wenvoe, and should be
removed.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

North of Wenvoe;

Representation ID: 6925

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Overall, Barratt Redrow maintain their objection to the inclusion of the Swn Y Coed site within Green Wedge 3 - North of Wenvoe under Policy DNP2.

Barratt Redrow have reviewed BP27 Green Wedges and consider that the assessment under NW2 does not consider nor reference the fact that the site at Swn Y Coed relates to the context of built development at Wenvoe and is very well-contained by both mature woodland and landform and possesses strong intervisibility with the northern edge of Wenvoe. Instead, BP27 looks to discuss the southern boundary of Culverhouse Cross and the association with the wider countryside.

From a landscape and visual perspective, the site has the ability to suitably incorporate residential development and include GI enhancements, to assist with its visual integration, as a visually appropriate extension to Wenvoe. Moreover, the development of the site immediately adjoining the existing settlement boundary at Wenvoe would not detract from the purpose of the wider Green Wedge.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

DNP8 – SEVERN ESTUARY RECREATIONAL PRESSURE

Representation ID: 6926

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Policy DNP8 seeks to address recreational pressure on the Severn Estuary Special Area of Conservation, Special Protection Area and Ramsar Site. Whilst Barratt Redrow appreciate the overarching purpose in its current form the proposed policy lacks sufficient supporting information explaining how it will operate in practice. The supporting text suggests that key details relating to mitigation delivery, including mechanisms such as Suitable Alternative Natural Greenspace and wider access management measures, will be set out in future Supplementary Planning Guidance. Deferring these important details until later down the line creates uncertainty at the plan-making stage and makes it difficult to assess whether the policy is sound, effective and/ or capable of being implemented on a consistent basis.

The policy also provides no clear threshold or criteria for determining what level of activity would constitute “visitor pressure” or an “adverse impact” on the integrity of the designated sites. Similarly, the evidence demonstrating what level of impact residents moving into new homes across the Vale of Glamorgan will generate additional recreational pressure on the Severn Estuary does not appear to have been quantified to date. While a 12.6 km recreational catchment is referenced, the supporting text does not clearly explain the evidence or methodology underpinning this distance. Moreover, the proposed text also fails to set out how new residential development will be assessed in terms of measurable impacts on the European site and thus the scope of mitigation that would subsequently be required.

From a practical standpoint this level of uncertainty is concerning given the implication of this policy are unable to be fully assessed due to the lack of evidence. For instance, if development sites within the catchment are expected to contribute financially towards mitigation measures, then the scale and mechanism of those contributions must be clearly established as part of the plan-making process. Without this clarity, there is a risk that Policy DNP8 could introduce unforeseen costs and extensive time delays, potentially affecting the viability and overall deliverability of proposed housing sites. The cumulative impact of which would then undermining the plan’s ability to meet its housing requirements and risk finding the RLDP unsound.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

CC2 - Presumption Against Demolition

Representation ID: 6927

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Barratt Redrow acknowledge the need to retain buildings in some circumstances, however consider that the wording of Policy CC2 is overly restrictive in the sense that a presumption against demolition could impact upon delivery timescales for sites, particularly those including
farm buildings.

Accordingly, it is considered necessary to re-word the policy to allow for the demolition of buildings where they are no longer used or needed in the event that a site is proposed to be developed for residential purposes, to assist in meeting the housing need over the plan period.

An additional point should be added to the list of 4 criteria, to note that demolition will be acceptable where it is demonstrated that ‘The existing building occupies a minority portion of the site, and to not demolish the building would prevent and/or restrict the delivery of the wider land for the provision of housing’.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG1 (7)

Representation ID: 6928

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Although we do not necessarily dispute this sites progression, given Wates have submitted a full planning application (Ref 2024/01152/FUL) which is currently under consideration. It is important to recognise that, according to the Council’s online planning register, two substantive consultation concerns remain outstanding. Firstly, the Highways response raises fundamental layout issues; and secondly, the Ecology department maintains a holding
objection on the basis of insufficient supporting evidence. To date we understand both matters remain unresolved and may well require extensive design amendments, additional technical work, and potentially further consultation before the application can ultimately be determined.

In the absence of confirmed solutions to these issues, there remains uncertainty regarding the timeframe for determining the planning permission. Furthermore, even if consent is secured, there will be a need to discharge conditions and address any pre-commencement
requirements, which will inevitably impact the lead-in time before development gets underway. Given these outstanding matters, the assumption that development will commence in 2027/28 appears optimistic at this stage. Delivery timescales may be extended depending on the scaleof amendments required and the duration of condition discharge processes. With this in mind,
we believe it is prudent for the emerging RLDP to identify a broader and more diverse portfolio of site allocations to support housing delivery earlier on in the plan period. Ensuring flexibility through additional deliverable sites will reduce the Council’s overreliance on sites such as this one and provide greater certainty in maintaining a more
consistent supply.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG1 (8)

Representation ID: 6929

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Whilst we understand that the proposed developer, Edenstone Homes, has recently engaged with the Council through its pre-application service. According to the Council’s planning register, no formal planning application has been submitted to date. As such, there remains no
confirmed development proposal, agreed technical evidence base, or indicative determination timeframe associated with the allocation.

In the absence of a live application, there is a considerable degree of uncertainty surrounding the anticipated delivery programme. The housing trajectory assumes development commencing in 2027/28; however, this appears optimistic given that an application has yet to
be submitted, validated or determined. Even following any grant of planning permission, there would be a requirement to discharge pre-commencement conditions and satisfy any relevant planning obligations before development could lawfully begin. From experience these
processes can be time-consuming and may result in significant delays with regards to lead-in times prior to first completions.

Given this uncertainty, reliance on the site to deliver within the early phases of the plan period carries risk. It is therefore important that the emerging RLDP identifies a broader and more diverse portfolio of deliverable site allocations to support housing delivery, particularly in the
earlier years of the plan. Incorporating additional sites with stronger prospects of short-term delivery will provide flexibility, resilience, and greater confidence in maintaining a robust housing land supply should delays arise on this allocation.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

VISION (2021 - 2036)

Representation ID: 6930

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

In general, Barratt Redrow support the RLDP Vision, however highlight that whilst Barry and other Sustainable Service Centres are identified as playing a vital role in delivering the strategy, the importance of the ability for Primary Settlements, such as Wenvoe, to deliver sustainable and high-quality residential development also needs to be suitably recognised.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

National Policy and Legislation

Representation ID: 7056

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Highlight Planning

Sound? Not specified

Representation Summary:

Based on the Development Plans Manual, when a plan is adopted, there should be at least 10 years of the plan period remaining. Based on the current timetable, an end date of 2038 (with associate increase in housing requirement) would therefore ensure a sound plan.

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP1 – SUSTAINABLE GROWTH STRATEGY

Representation ID: 7057

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Highlight Planning

Representation Summary:

Barratt Redrow supports the broad objective of pursuing a sustainable growth strategy and agrees that growth should be directed towards the most sustainable locations. The emphasis on public transport connectivity, access to services and the need to align housing growth with wider regional aspirations is supported in principle.

For instructions on how to use the system and make comments, please see our help guide.