1 Vale of Glamorgan Deposit Replacement Local Development Plan

Search representations

Results for Barratt Redrow Homes search

New search New search

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG1 (3)

Representation ID: 6912

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Barratt Redrow question to suitability of allocating residential development on the site known as Land at Hayes Lane, The Bendricks. These concerns are centred on the following:
Unsustainable Location & Poor Connectivity - Whilst the site is technically identified within the settlement boundary, it is clearly not a sustainable location for residential development. This is evident by virtue of the fact that Land at Hayes Lane is situated within an existing industrial estate and lacks any supporting facilities.

Given the nature of the area there are almost no existing active travel routes and access to modes of public transport are extremely limited. Most notably that includes railway stations with the nearest being Cadoxton Station which is located circa 3.8km north of the site.

Loss of allocated employment land - the site remains allocated in the adopted LDP for B1/B8 employment uses. These intended to facilitate small industrial and workshop units as part of the Atlantic Trading Estate’s expansion and in turn support opportunities for local businesses/ enterprise ventures. The council’s latest Employment Land Review confirms a clear demand for such uses in Barry, with Land at Hayes Lane representing the most logical location for further growth. Although the RLDP’s evidence base suggests there are other development opportunities within the region that could compensate for the proposed loss of employment land. Upon further review it is apparent these are in less favourable locations from both a strategic and operational standpoint.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG1 (5)

Representation ID: 6913

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Whilst we do not oppose the overall principle of residential development at Site C (Central Parcel), this position must be considered in the context of the wider allocation. Applications for Sites A and B (2020/00351/OUT (Site A) & 2020/00352/OUT (Site B)) are currently pending subject to respective Section 106 Agreements, with prolonged negotiations resulting in significant delays to delivery. This experience clearly demonstrates that development within this allocation is complex and subject to extended viability and legal discussions, which inevitably impacts the rate at housing is able to come forward.

According to the Council’s register we understand Site C has not been subject to any formal planning application, and therefore there is no detailed evidence available regarding the proposed layout design, infrastructure requirements, viability, or anticipated submission and determination timeframes. Despite this, the Council’s housing trajectory assumes development commencing in 2028/29, with 35 units initially and 45 units annually thereafter. Given the absence of a live application and the precedent of delays on Sites A and B, these delivery assumptions appear overly optimistic based on current evidence.

On that basis we maintain that the Council should reassess the trajectory assumptions for this particular site and identify other alternatives to help account for any unforeseen slippage on Site C.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG3 – HOUSING LED REDEVELOPMENT OPPORTUNITY

Representation ID: 6914

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Barratt Redrow acknowledges the Council’s position in respect of Site HG3 (1) – Former Eagleswell Primary School, including the temporary five-year consent (2024–2029) for 90 units of short-term accommodation and their inclusion within housing completions for monitoring purposes.
Given their expressly temporary nature and planned relocation to other sites within the Vale by 2029, it is essential that these units are not double counted in a way. As the risk of doing so would artificially inflate the Vale’s housing numbers, thereby preventing delivery opportunities elsewhere over the plan period.
Although we welcome the clarification provided at paragraph 6.111 which states that once the temporary units are removed and the site is redeveloped for permanent accommodation, any future dwellings will not be included within the RLDPs housing supply figures.

This approach is critical given the Vale’s substantial existing landbank and the number of allocations being rolled forward, as cumulatively factoring in additional units from this site would further constrain opportunities to accommodate genuine growth elsewhere. Thereby limiting the Council’s ability to effectively meet local housing need up to 2036.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP7 – AFFORDABLE HOUSING PROVISION

Representation ID: 6915

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

In principle, Barratt Redrow support Policy SP7’s objective to secure a minimum of 3,070 affordable homes over the plan period. That said, given the level of affordable housing is directly proportionate to the total housing provision within RLDP we believe there is scope for further uplifts in that respect.

Barratt Redrow maintain that there is sufficient evidence to justify increasing the proposed housing requirements through the Vale’s flexible allowance in order to maximise opportunities for growth. In turn this would prevent artificially capping affordable housing provision at 3,070 homes to ensure the plan is positively prepared by incorporating measures that proactively address demand across the region.

Similarly, it is considered that Policy SP7 should be updated to allow flexibility and avoid the risk of contradicting Policy SP8. At present the blanket approach to affordable provision does not allow for site-specific delivery or viability requirements which may arise and as such, the amplification text should also include a note similar to the following:
‘Where the target affordable housing percentage is considered unviable due to physical, financial, or other constraints, sites will be reviewed on an individual basis following submission of a detailed viability assessment and any supporting evidence as necessary’.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

POLICY SP8 - AFFORDABLE HOUSING REQUIREMENTS

Representation ID: 6916

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Barratt Redrow development should help meet affordable housing need. Although to ensure Policy SP8 is effective its important the percentage requirements and site thresholds proposed are viable across a range of site types and market areas to ensure they do not inadvertently suppress delivery.
On that basis we believe it would be prudent for the Deposit Plan to clarify that affordable housing targets are subject to site-specific viability considerations and can be adjusted in circumstances where comply with such parameters would render the sites viable and thus prevent delivery. Greater flexibility is also needed in tenure and mix to better reflect evolving local needs over the entire plan period including the point when planning applications are formally submitted.

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP10 - SUSTAINABLE TRANSPORT

Representation ID: 6917

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Barratt Redrow support the overall objective of Policy SP10 in seeking to promote sustainable transport, increase active travel opportunities and reduce reliance on the private car in accordance with national placemaking objectives.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP13 - COMMUNITY INFRASTRUCTURE AND PLANNING OBLIGATIONS

Representation ID: 6919

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? Not specified

Representation Summary:

Barratt Redrow do not consider that Policy SP13 – Community Infrastructure and Planning Obligations is required. This is predicated on the basis that such matters are dealt with under separate legislative and policy frameworks. Therefore, as currently drafted the proposed policy (and supporting text) do not add anything further information for planning purposes and risk unnecessary duplication.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

CI1 – OPEN SPACE PROVISION

Representation ID: 6920

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

Whilst there are no comments regarding the principle, thresholds and use of the FIT standards in terms of the open space provision. As such Barratt Redrow query the requirement for an Open Space Strategy for all sites that meet the thresholds.
The requirement within emerging Policy CI1 for applicants to prepare or submit an Open Space Strategy is not considered to be sufficiently justified or proportionate when assessed against Planning Policy Wales, which promotes access to open space and recreational provision but does not prescribe the preparation of standalone Open Space Strategies for individual planning applications. There is a lack of clarification as to what it proposed and also how the level of detail would be proportional to the size of the site.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

CC1 - Residential Operational Net Zero Carbon Development

Representation ID: 6921

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Sound? No

Representation Summary:

Barratt Redrow strongly object to Policy CC1 on the basis that it duplicates Welsh Government’s Future Homes Standard (FHS), which is intended to ensure all new homes are “zero-carbon ready” through a consistent national Building Regulations framework. risks imposing additional cost and complexity that undermines site viability and deliverability.

The Development Plans Manual for Wales is clear that development plans must avoid repeating national policy and should not introduce requirements that are more appropriately addressed through other regulatory regimes. In this respect, Policy CC1 conflicts with the principle that plans should be clear, proportionate and not duplicate national controls, raising concerns under the tests of soundness relating to coherence and consistency with national policy (Test 2) and whether the plan is justified (Test 3).

The proposed step change in standards from 1 April 2030 — particularly the reduction in space
heating demand from 40 kWh/m²/year to 15 kWh/m²/year — represents a significant and abrupt
escalation in performance expectations. Whilst reference is made to initiatives such as Tai ar
y Cyd and AECB CarbonLite, these have largely been associated with grant-funded affordable
housing schemes. There is no clear evidence that equivalent standards can be viably delivered
across mainstream private housing schemes without public subsidy.

Policy CC1 also risks creating fragmented energy performance standards across different Local Planning Authorities in Wales. This undermines the benefit of a consistent national approach through Building Regulations and makes it more difficult for volume housebuilders operating across multiple authority areas to deliver homes efficiently at scale.

Furthermore, the demands of Policy CC1 have to be considered in the context of all of the other demands that impact on development viability (e.g. affordable housing). The Council must provide evidence that an assessment has been undertaken to demonstrate that development, specifically the housing allocations in Policy HG1, can bear the cumulative policy costs of the RLDP, including Policy CC1.

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP19 - GREEN INFRASTRUCTURE

Representation ID: 6922

Received: 11/03/2026

Respondent ID: 2669

Respondent: Barratt Redrow Homes

Agent: Boyer Planning

Representation Summary:

In principle Barratt Redrow support the aim of this policy in ensuring proposed development incorporate measures that protect and enhance green infrastructure provision.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.