1 Vale of Glamorgan Deposit Replacement Local Development Plan

Search representations

Results for Welsh Government (Planning Division) search

New search New search

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP14 - EMPLOYMENT GROWTH

Representation ID: 5127

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Employment Land
The Council’s Employment Land Study (BP12, March 2023) identifies a requirement for 67.80ha of employment land, which includes a 5-year buffer. The requirement is based on rolling forward past trends (over 25 years) and is of a sufficient scale to meet the 5,338 jobs forecast. However, Policy SP14 identifies employment land allocations totalling 182ha, which is an increase of around 114ha above the employment land requirement. The sites that make-up this supply are largely major employment allocations that attract significant regional inward investment at Cardiff Airport and Bro Tathan Enterprise Zone totalling 127.85ha (70%) of the total provision. The Welsh Government does not object to the over-provision of employment land in the plan. The Enterprise Zone designation must be identified and the allocations within it (SP14: 1-3).

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

POLICY SP8 - AFFORDABLE HOUSING REQUIREMENTS

Representation ID: 5130

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

The Deposit plan is supported by a high-level affordable housing study and site-specific viability appraisals for Key Sites. All viability work and must be prepared in conjunction with the Viability Steering Group and site-specific promoters.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP9 - GYPSY AND TRAVELLER SITE PROVISION

Representation ID: 5132

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Gypsy and Travellers
The Gypsy and Traveller Accommodation Assessment GTAA (June 2022, approved June 2024) identifies a total need for 11 pitches over the plan period up to 2036, of which 9 pitches are ‘immediate’ by 2026. WG note that 4 pitches have since gained planning permission, reducing the remaining need over the plan period being 7 pitches. 8

Policy SP9 identifies a site at Llangan (0.76Ha) to accommodate the 7 pitches needed. It will be for the Council to demonstrate the appropriate site selection assessment process has been followed and that the site complies with requirements in PPW (4.2.35), Circular 005/2018 (paragraph 35) any relevant guidance and the DPM (5.80-5.85) to allocate a deliverable site in the plan period. The views of the relevant statutory bodies must also be agreed with no outstanding objections to the delivery of the site. The Welsh Government has no objection in terms of meeting the numerical need for gypsy traveller accommodation.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

CC5 - Promoting Heat Networks

Representation ID: 5171

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Future Wales: The National Plan 2040 identifies Barry as a District Heat Network (DHN) Priority Area. The Renewable Energy Assessment (BP15) explores the opportunity for a DHN using waste heat from Barry Biomass, but as there is some uncertainty on the future of the plant, the study concludes there is considerable risk to using the plant as a source waste heat. Could the Council provide an update on alternative options for a DHN in Barry?

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

CC3 - Renewable Energy Local Search Areas

Representation ID: 5173

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Solar and wind search areas (where appropriate) below the 10MW Developments of National Significance (DNS) have been identified (Policy CC3). The plan also includes a criteria-based policy for all renewable energy proposals, particularly wind development, under 10MW (Policy CC4). Policy CC3 makes reference to adhering to the criteria in Policy CC4. However, would it not be the case that if search areas have been identified in Policy CC3 have they not already met the criteria? If they would not, should they be identified in the first place? Clarity would be beneficial. The Welsh Government supports the approach but seeks clarity on the point raised.
The Welsh Government notes the proposed search areas for wind energy near Morfa Ystrad Owen/Nant Rhydhalog, according to the Peatlands of Wales Evidence Score Map, the search area includes areas of peatland (Evidence Score 4). The site is also a SINC. This raises concerns as to how the inclusion of this search areas meets the policy test in PPW 6.4.15, 1a and 1b (Stepwise) regarding avoidance of irreplaceable peatland habitats and PPW 6.4.34.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

CC4 - Renewable, Low and Zero Carbon Energy Generation

Representation ID: 5174

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Policy CC4 refers to Developments of National Significance (DNS) in 6.344 and 6.346. This should now refer to Strategic Infrastructure Projects (SIP) which replaced DNS.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP19 - GREEN INFRASTRUCTURE

Representation ID: 5177

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Sound? Not specified

Representation Summary:

Policy SP19 should explicitly reference the need for development to be accompanied by a Green Infrastructure Statement.
PPW12 requires decision makers to apply the step wise approach to GI, with enhancement secured at every stage where possible, there is no distinction made between the quality of the GI assets – the qualification in the policy statement that states proposals will incorporate measures that protect and enhance high quality multi-functional green infrastructure should be redrafted to remove the quality reference. The need to avoid an impact in the first instance should also be explicitly incorporated into the policy.

Attachments:

Object

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP20 - BIODIVERSITY AND ECOSYSTEM RESILIENCE

Representation ID: 5178

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Sound? Not specified

Representation Summary:

Criterion 1 (Policy SP20) should be redrafted – the stepwise approach in PPW 12 6.4.15 1a - does not distinguish between relative ecological value – the avoidance step applies to biodiversity in its widest sense (i.e. the variety of species and habitats and their abundance) and ecosystem functioning.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.