1 Vale of Glamorgan Deposit Replacement Local Development Plan

Search representations

Results for Welsh Government (Planning Division) search

New search New search

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

National Policy and Legislation

Representation ID: 5112

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

After considering the key issues and policies in Future Wales, the Welsh Government is of the opinion that the Replacement Deposit Plan is in general conformity with Future Wales: The National Development Framework. Specific comments are set out in the Statement of General Conformity (Annex 1 of this letter).

Annex 1 – General Conformity with Future Wales
• No significant concerns

Annex 1 - Statement of General Conformity
The Welsh Government is of the opinion that the Vale of Glamorgan Council Replacement Local Development Plan (2021-2036) Deposit Plan is in general conformity with the National Development Framework: Future Wales, as set out in paragraphs 2.16 – 2.18 of the Development Plans Manual (Edition 3).

Reasons
Future Wales places emphasis on the development of National Growth Areas in a sustainable manner. Growth areas must be sustainably planned, reduce the need to travel by car, encourage walking and cycling (active travel), maximise public transport usage and incorporate green infrastructure. Growth areas must embed these principles within a wider regional consensus, focussing on the opportunities they bring to promote social and economic benefits across a broader geographical area. The Welsh Government supports sustainable growth in National Growth Areas to respond to the climate change and biodiversity emergencies, making the best use of resources.

Policy 1 and Policy 33 of Future Wales states that Cardiff, Newport, and the Valleys will be the main focus for growth and investment in the region. The strategic diagram (p163) also identifies the Vale of Glamorgan within the National Growth Area. The Vale of Glamorgan RLDP, specifically BP20A, provides robust evidence on the interrelationship and key issues with adjoining authorities, including their interaction and how they have shaped and influenced the scale/location of growth in the RLDP. This is set out in the three Joint Position Statements (JPSs).

BP45 ‘Regional Assessment of Future Growth and Migration for the Cardiff Capital Region (CCR), May 2024, provides further evidence on how the scale of growth indicated for the region has shaped the scale of future economic growth within the Vale of Glamorgan. This results in a higher level of employment growth in the Vale of Glamorgan primarily to increase self-containment and reduce out-flows to adjoining urban areas. Two key areas for future economic growth are identified at Cardiff Airport/Bro Tathan Enterprise Zone and Aberthaw Power Station.

The result is a Sustainable Transport Orientated Growth spatial strategy focusing on the Cardiff – Bridgend railway line and A48 corridor, with the key settlement for growth at Barry, followed by service centres on public transport corridors. On balance, the Welsh Government considers the Deposit Plan is in general conformity with key policies in Future Wales namely (not exhaustive):
Policy 1: Where will Wales grow
Policy 2: Shaping Urban Growth and Regeneration – Strategic Placemaking
Policy 6: Town Centre First
Policy 10: International Connectivity – Cardiff Airport
Policy 12 Regional Connectivity
Policy 33: National Growth Area – Cardiff, Newport and the Valleys
Policy 36: South-East Metro

Future Wales brings a new perspective that all LDPs have to embrace on how each LDP sits within the region as a whole and the relationship to other LDPs, in essence, a strategic approach to cross boundary relationships. There is evidence to support that approach in advance of an SDP.

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

Regional Context

Representation ID: 5113

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

There is a joint position statement on the relationship between Bridgend, Cardiff and the Vale of Glamorgan (BP20A), which considers population growth, migration patterns, housing completions, employment characteristics, demographics, commuting and transport links between the three adjoining authorities. The Welsh Government supports the principle of this work which demonstrates how change in the Vale of Glamorgan relates and complements growth in adjoining local authorities. This approach illustrates a good mechanism for other local authorities to follow.

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP1 – SUSTAINABLE GROWTH STRATEGY

Representation ID: 5114

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Spatial Strategy - Location of Growth
The Council tested 4 spatial options:
Option 1 – Continuation of the adopted LDP growth strategy
Option 2 – Dispersed Growth
Option 3 – Focused Growth
Option 4 – Sustainable Transport Orientated Growth

The Council has chosen Option 4: Sustainable Transport Orientated Growth for its Deposit Plan. The strategy seeks to locate most of the new growth in those settlements well served by existing/proposed rail infrastructure along the Vale of Glamorgan/Penarth branch lines. This will encourage and maximise the use of sustainable transport modes in the plans designated Strategic Growth Area (SGA). The SGA encompasses most of the Council’s largest and more sustainable settlements and the Council considers that focussing development here will reduce the need to travel and will co-locate housing with employment opportunities, services, and community facilities.

With a significant proportion of the Council’s brownfield land already developed/committed, there are limited opportunities for brownfield development moving forward.

The existing land bank is stated as 5,140 dwellings (land supply 3,837 + windfall assumptions 1,303), to meet a proposed housing requirement 7,890 (provision 8,660). The authority has allocated 3,520 dwellings on new sites (Policy SP6, Table 2). As a result, the plan has adopted a predominantly greenfield strategy allocating the majority of new development on five key sites (Policy HG1, Sites KS1-5 totalling 2,278 dwellings) well-connected edge of settlement sites, close to existing or proposed rail stations. We note the Council has used TfW data in the site assessment process to assess sites and their proximity to transport nodes. The remaining sites are mainly ‘rolled’ forward from the adopted LDP. The Welsh Government supports the spatial strategy, which accords with Planning Policy Wales (PPW) and is in general conformity with Future Wales.

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP2 – SETTLEMENT HIERARCHY

Representation ID: 5115

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Spatial Strategy - Primary Settlements
The Council’s settlement hierarchy allocates circa 92% of all housing development (committed and proposed) to settlements in the top three tiers of the hierarchy. The Welsh Government does not object to this approach. The recognition that Culverhouse Cross with few facilities on site and the presence of BMV Land, the expectation for limited growth (paragraph 6.14 & 6.15) is welcomed. Similarly, it is noted that Wick benefits from a primary school and has some scope for future growth, albeit in keeping with the scale and accessibility of the settlement. The Welsh Government is content that the scale of growth reflected in these two locations will reflect the availability of local facilities and services.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP6 - HOUSING REQUIREMENT

Representation ID: 5117

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

The Level of Growth - Homes and Jobs
The Deposit Plan (Policy SP1 & SP6) makes provision for 8,660 homes to deliver a housing requirement of 7,890 new homes (526 p/a) over the plan period 2021-2036, of which a minimum of 3,070 homes will be affordable. The flexibility allowance proposed by the Council is 9.8%. The delivery of new jobs is for 5,388 over the plan period (Policy SP14).

Homes: The 2018 WG Principal Projection results in a requirement of 431 units p/a, or 6,465 units over the plan period. The housing growth proposed in the plan (requirement) is around +1,425 units (22%) above the WG 2018 principal projection, the provision being +2,195 (34%) above. The Council consider the 10 year average housing completions to represent a more realistic level of growth to deliver the key issues the plan is seeking to address. The Council considers that a lower level of growth (2018 projection) is not appropriate because the projections do not take account of any policy decisions and were prepared in advance of the Covid-19 pandemic with implications for migration patterns and fewer jobs proposed.

BP8A (November 2025) considers the latest 2022 Welsh Government population and housing projections, noting they are higher than the 2018 based projections. The projections for the Vale of Glamorgan show significant variation in internal migration in particular which the Council considers should be treated with caution. The projections are trend based and are affected by specific factors that may have occurred within the previous 5 years. The 5 years in question included a period of high housebuilding associated with a newly adopted LDP, as well as the Covid 19 pandemic, where many students returned to home from term-time addresses and re-registered with GPs in the Vale.

Given the fluctuation in recent migration figures, the Council consider longer-term trends are more appropriate, and it is noted that the population change identified in the 10-year migration variant is of a similar level to that proposed under the RLDP projection. In conclusion, for the reasons identified above, despite the updated projections, the Council considers the RLDP housing requirement continues to represent a robust basis to deliver a sustainable and deliverable level of growth over the plan period. The Welsh Government does not object to the scale of housing contained within the plan.

The demographic evidence (February 2023, Edge Analytics) tested 12 growth scenarios comprising: demographic-led, dwelling-led, and employment-led scenarios. The preferred housing requirement is based on a 10-year dwelling-led scenario (526 dpa) that would result in a population growth of 9.7% over the plan period with an annual net in-migration of 1,009 persons. The Council considers this level of housing growth is deliverable with a large proportion met through existing commitments (51%) and a jobs total (4,875 jobs) that broadly aligns with the level of new jobs forecast in the Employment Land Study (5,338 jobs). Moreover, the scale of growth is considered by the Council to be compatible with Future Wales and the role the authority plays within the wider southeast region. With inward migration to the Vale of Glamorgan from Cardiff expected to slow as Cardiff’s strategic sites deliver higher levels of housing and with employment opportunities in the Vale co-located with housing sites, there are further opportunities to reduce the high levels of out-commuting into Cardiff. Overall, this approach is proposed by the Council to deliver a level of growth that is balanced with the emerging Cardiff LDP and wider southeast region. The Welsh Government does not object to the level of growth proposed in the plan.

We note that historic completion rates in the Vale of Glamorgan have fluctuated considerably over recent years. The past 10-year (2011-2021) average completion rate is 526 dwellings p/a. This has been exceeded over the last 5-years (2016-2021) with 698 dwellings constructed p/a. Build rates in recent years are in part attributed to the delivery of the current adopted LDP strategy that has more of a ‘rural settlement' focus, with multiple sites across many settlements being built out. Replicating this approach going forward (10,470 dwellings) would not comply with FW/PPW in terms of sustainable development and transport, potentially adversely impacting on Cardiff’s growth strategy. On this basis, the Council considers that achieving 526 dwellings p/a in the preferred 10-year dwelling-led scenario is sustainable and deliverable and would provide a level of job growth (5,338 jobs) that is balanced with the housing requirement. The Welsh Government does not object to the level of housing proposed in the plan but demonstrating delivery of the key housing sites will be essential.

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

Table 2: Housing Supply

Representation ID: 5118

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

The Welsh Government notes that BP0A identifies small and large windfalls, based on historic trends of 53/yr and 80/yr respectively. Also, the large windfalls are not included in the first two years of the trajectory, as per the DPM. A non-delivery allowance of 5% is identified, which reflects local characteristics in the Vale of Glamorgan. A flexibility allowance of 9.8% has been factored into the provision. The Welsh Government supports this approach, although whilst Appendix 1 contains a housing trajectory, there is no table to mirror that of Table 21, DPM. This should be included in Appendix 1.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP14 - EMPLOYMENT GROWTH

Representation ID: 5121

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Jobs: The Council’s 10-year dwelling-led growth option results in a requirement for 4,875 new jobs (325 p/a) over the plan period. This broadly aligns with the projected growth for 5,338 (355 p/a) new jobs in the Employment Land Review (BP12) and as set out in Policy SP14.

The level of employment growth proposed (5,338 jobs) over the plan period is below the target in the currently adopted plan (7,610-10,610 jobs). The lower target is considered by the Council to more accurately reflect the cohort of working aged people in the Vale of Glamorgan and would support a continuation of long-term housing delivery trends that takes into account lower housing growth post-recession and a shorter period of historically high dwelling completions (2016-2021). The Welsh Government does not object to the level of job growth proposed in the plan.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

SP7 – AFFORDABLE HOUSING PROVISION

Representation ID: 5124

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

The Local Housing Market Assessment 2023 (LHMA) (BP10B) calculates affordable housing need over the replacement plan period using the ‘policy neutral’ Welsh Government 2018 Principal Projection and the preferred growth option. The LHMA provides the latest evidence on affordable housing need, identifying a net annual need for 1,075 affordable units per annum for the next five-years and a further 154 units per annum over the following 10 years (BP10B, Executive Summary), resulting in a requirement for 6,915 affordable homes over the plan period (461 p/a) with a tenure split of 65% social rent and 35% intermediate. The Welsh Government note that the RLDP housing requirement is higher than the 2018 projections. Accordingly, to take this into account the affordable housing need for the RLDP is 502/yr which equates to a need of 7,530 over the plan period (RLDP, paragraph 6.116, Table 4).

Policy SP7 identifies a target of delivering a minimum of 3,070 affordable homes, the housing need being across all 13 Housing Market Areas, albeit it is more acute in Barry, Penarth, and Llantwit Major for 1-bed properties. The Welsh Government notes that most of the new housing development (51%) is proposed in the Key Settlement of Barry and Service Centre Settlements, which include Penarth and Llantwit Major.

The Welsh Government has no significant concerns regarding the relationship between the LHMA and the Deposit Plan.

Attachments:

Comment

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG4 - RURAL AFFORDABLE HOUSING LED SITES

Representation ID: 5125

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Affordable Housing Led Sites
To deliver additional affordable housing above that which market led housing can provide, the authority proposes (Policy SP3 & HG4) to permit small scale affordable housing-led developments that provide a minimum of 50% affordable housing on sites up to 25 dwellings in minor rural settlements and 50 dwellings in primary settlements. The principle of this approach is supported.

Paragraph 6.137 of the plan states:
“Policy HG4 makes provision for affordable housing-led sites in locations outside the Strategic Growth Area. These sites, which are allocated for a minimum of 50% affordable housing, are included within the settlement boundary.”

The reference to being within the settlement boundary is not referenced in policy HG4. It would be beneficial to either include such a reference or demonstrate that settlement boundaries do include those sites listed in policy HG4 for clarity.

These sites must be in addition to the market housing led requirement and identified in the LDP. This policy approach is justified by the high level of affordable housing need evidence by the LHMA and must be accompanied by additional control over the land by the local planning authority to ensure effective delivery.

Evidence should include ownership of the land, a binding legal agreement where the land is in private ownership or a resolution of the council to use compulsory purchase powers. RLDP, paragraph 6.133 references to such controls, however, should such controls be contained within the policy?

Attachments:

Support

1 Vale of Glamorgan Deposit Replacement Local Development Plan

HG5 - AFFORDABLE HOUSING EXCEPTION SITES

Representation ID: 5126

Received: 04/03/2026

Respondent ID: 2386

Respondent: Welsh Government (Planning Division)

Representation Summary:

Policy HG5, states 100% affordable housing exception sites can be located outside a settlement boundary where they comply with PPW/TAN2 and any threshold/policy requirements set in the Deposit Plan. The Welsh Government supports this approach.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.