Sylw

2 Dogfennau Ategol

Cynllun Adneuo - Atodiad

ID sylw: 5128

Derbyniwyd: 04/03/2026

Respondent ID: 2386

Ymatebydd: Welsh Government (Planning Division)

Crynodeb o'r Gynrychiolaeth:

Delivery and Implementation
PPW and the DPM (Chapter 5) contain guidance on the requirements in respect of the delivery and implementation of plans. The Deposit Plan should set out site-specific details for Key Sites that includes general phasing timescales, key infrastructure requirements, placemaking principles (including concept / schematic masterplan frameworks), constraints, and developer requirements, where appropriate. We note the Deposit Plan has included emerging master planning/infrastructure work on key sites.

The phasing, timing, funding, and delivery of Key Sites will be critical to ensure the plan delivers the scale of growth required over the plan period. This includes the relationship between the two Key Sites in St Athan (KS4 and KS5) totalling up to 1,150 units and the delivery of a new rail station in St Athan to meet the objectives of the strategy and encourage a modal shift to more sustainable forms of public transport.

The development sites may also impact on the trunk road network, in particular the M4 J34 and there will need to be a suitable level and form of traffic assessment to accompany the plan. (The transport case may consider the South East Wales Traffic Model as part of any masterplan impacts on the Strategic Road Network (SRN) (Wales Regional Transport Models | TfW)). The Council will also need to demonstrate that all housing components are deliverable through a housing trajectory prepared by the Council and Housing Stakeholder Group. Statements of Common Ground for key allocations, especially those that have ‘rolled over’ from the adopted plan, would be advantageous to demonstrate the sites are deliverable in the timescales set out.

Atodiadau:

Sylw

2 Dogfennau Ategol

BP15 Asesiad Ynni Adnewyddadwy

ID sylw: 5172

Derbyniwyd: 04/03/2026

Respondent ID: 2386

Ymatebydd: Welsh Government (Planning Division)

Crynodeb o'r Gynrychiolaeth:

It is welcome that the Renewable Energy Assessment (REA) has considered BMV policy, specifically for solar PV, and use of the Predictive ALC Map. The assessment has only considered non-BMV land (Subgrade 3b, Grade 4 and 5). The assessment would benefit from referencing the clarification provided in the DCPO letter of 1st March 2022 in respect of solar PV and BMV agricultural land for completeness.

The study identifies that in the Vale of Glamorgan solar development is more suitable than wind energy because of the flight path of aircraft in the south of the County Borough. However, there are some opportunities for wind sites, but these are likely to be small (<10MW) where aviation risks are lower and there is some grid access. Conversely, there are large expanses of land suitable for solar areas (>10MW) to the West of the County Borough, where there is little existing development. The study identifies 20 large-scale solar areas but recognises that grid constraints may impact the ability of sites to come forward.

Atodiadau:

Sylw

2 Dogfennau Ategol

BP25A Datganiad Mwynau o Gydweithio Isranbarthol

ID sylw: 5175

Derbyniwyd: 04/03/2026

Respondent ID: 2386

Ymatebydd: Welsh Government (Planning Division)

Crynodeb o'r Gynrychiolaeth:

The Regional Technical Statement (RTS 2nd Review) identifies a nil apportionment for land-won sand and gravel provision in the Vale of Glamorgan. The Welsh Government policy clarification letter (dated 11 November 2021) identifies a surplus of 1.68mt of crushed rock. As there is a surplus of crushed rock reserves and a lack of sand and gravel production in the Vale, no specific allocations are required in the replacement plan. It is unclear whether a Statement of Sub-Regional Collaboration with adjoining authorities in the Cardiff City sub-region been agreed, or does the latest Position Statement (July 2022) explain how any shortfall will be met across the region, particularly for crushed rock, of which the Vale has a surplus? Clarification would be beneficial.

Atodiadau:

Sylw

2 Dogfennau Ategol

BP23A Diweddariad i'r Papur Tir Amaethyddol Gorau a Mwyaf Amlbwrpas

ID sylw: 5176

Derbyniwyd: 04/03/2026

Respondent ID: 2386

Ymatebydd: Welsh Government (Planning Division)

Crynodeb o'r Gynrychiolaeth:

The Welsh Government has engaged with the Council for land quality advice, survey advice and ALC survey validation for candidate sites. The LPA has produced a specific topic paper on BMV policy application. BP23A. The Deposit RLDP allocates 188 hectares of housing land, 5.62 ha is identified as BMV land (under 3% of total housing allocations). The RLDP:
• Has sought to avoid BMV land wherever possible;
• Uses the Predictive ALC Map as a core evidence layer to inform: The spatial strategy;
• Settlement hierarchy decisions; and
• Candidate site assessments.
• Directs strategic growth to areas with least BMV land
• Removes or avoids allocations where BMV impacts were significant or unjustified.
• Quantifies total BMV loss and demonstrates it is minimal (5.62ha) and proportionate at plan level.
• Applies a sequential approach through: Preference for brownfield and non-BMV sites;
• Replacement of higher-BMV sites with lower-grade alternatives where possible.
• Requires site-specific ALC surveys to verify actual land quality before allocation.
• Demonstrates that allocated BMV land is: Often small, fragmented, or constrained;
• Sometimes previously disturbed or incapable of being farmed differently from surrounding lower-grade land; and
• Necessary to deliver the Plan’s housing strategy where reasonable alternatives are unavailable.

In conclusion, the Welsh Government consider the Authority has demonstrated a sensible and pragmatic approach to considering BMV loss in the context of national planning policy, and on that basis no objection is offered.

Atodiadau:

Sylw

2 Dogfennau Ategol

BP30 Y Gymraeg

ID sylw: 5179

Derbyniwyd: 04/03/2026

Respondent ID: 2386

Ymatebydd: Welsh Government (Planning Division)

Crynodeb o'r Gynrychiolaeth:

There is limited reference to the Welsh language in the plan, either potential adverse impacts arising through development, or mechanisms via a policy framework to support and grow the use of the language. There are references to a number of Welsh-medium schools (3.26) and the increase in the number of people able to speak Welsh according to the 2011 census (3.52) but there is no mention of the authority's Welsh Language Strategy or promoting or cross-referencing to the aims of Cymraeg 2050: A million Welsh-speakers.

Paragraph 6.81 of the plan refers to development north west of Barry:
“Land at North West Barry is allocated for a residential development of up to 376 dwellings and public open space. The site is in a sustainable location on the edge of the Barry, a key settlement, in a location that is well served by services and facilities, including a major supermarket, GP surgery, community centre, three primary schools (English Medium, Welsh Medium and Church in Wales) and two high schools (English and Welsh Medium) all located in reasonable walking distance. There is an active travel route along Port Road West, bus stops in close proximity providing buses to Llantwit Major, Cardiff and the centre of Barry. Barry station is 1.3 miles from the site entrance.”

There is no mention that the Council want to undertake a Welsh Language Impact Assessment (WLIA) so there appears no attempt to measure the impact on the Welsh schools resulting from housing development? Could the Council clarify if such implications have already been covered in the WLIA for the plan, ISA, or are any specific policies necessary?