6. Habitats Regulations Assessment (HRA)
Marine and Coastal Physical Processes Coastal Squeeze
We note that coastal squeeze has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is that it “is unlikely that the Vale of Glamorgan RLDP will allocate many developments on
greenfield sites adjoining the estuary”.
We also note that Policy CC6 specifically relates to Coastal Defences and Shoreline Management, with reference to the Shoreline Management Plans. We recommend the use of NRW’s Assessment of Coastal Squeeze at the project level for anyone proposing to
undertake works to coastal structures.

Loss of Functionally Linked Habitat
As part of the Preferred Strategy consultation, we advised that consideration was given to potential impacts on migratory fish features of the Severn Estuary EMS. In particular, we referenced the River Ely and its tributaries providing supporting habitat for essential life cycle processes of some or all the diadromous fish species.

Within the deposit plan HRA, it is noted that likely significant effects to the migratory fish features of the Severn Estuary EMS has been ruled out, as none of the sites allocated in the RLDP lie in close proximity to the River Ely and connected watercourses. We therefore
agree with this conclusion.
In relation to bird features, Table 8 of the Appropriate Assessment identifies many key sites and allocations with high to medium potential for functional linkage to the Severn Estuary EMS. We note that loss of functionally linked habitat has been screened in and taken
through to Appropriate Assessment where a conclusion of no adverse effect was reached.

The justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational Pressure’ within the deposit plan. Policy DNP8

We advise that clarification is needed in relation to this policy, as while we welcome the supporting text regarding functionally linked land outlined in paragraph 6.76 of the HRA, the policy is mainly focused on recreational pressure and is titled as such.

We also note a discrepancy between the policy wording in paragraph 6.76 and Policy DNP8 in the deposit
plan itself.

Visual and Noise Disturbance (During Construction)
Within the deposit plan HRA, visual and noise disturbance has been screened in and taken through to Appropriate Assessment where a conclusion of no adverse effect was reached. The justification for this is through the inclusion of recommendations outlined in 6.83 of the HRA to the supporting text of Policy SP20, which we welcome.

We also welcome the recommendation in relation to potential functionally linked land as outlined in paragraph 6.84 of the HRA.

Recreational Pressure
Within the deposit plan HRA, recreational pressure has been screened in and taken
through to Appropriate Assessment where a conclusion of no adverse effect was reached.

Again, the justification for this is the inclusion of ‘Policy DNP8 – Severn Estuary Recreational Pressure’ within the deposit plan, which as above, we advise needs clarification.

We note that no visitor data has been collected from access points within the Vale of Glamorgan, but we welcome reference to the visitor surveys undertaken by
Monmouthshire and Torfaen, as well as the 2022 visitor survey commissioned by Stroud District Council.

We note that paragraph 6.25 of the HRA states that “three Key Sites and several other housing allocations lie within the 12.6km core recreational catchment that has been
deemed most appropriate for the Severn Estuary SAC/SPA/Ramsar”. However, we also note that Table 6 in the HRA only includes two Key Sites requiring mitigation, with KS3 being omitted. We advise that clarification is needed at the project level as to whether developments are situated within the 12.6km catchment area.